Harquahala Generating Project
2530 North 491 Ave, Tonopah, AZ 85354Plant Summary Information
Harquahala Generating Project is ranked #9 out of 159 power plants in Arizona in terms of total annual net electricity generation.
Harquahala Generating Project is comprised of 6 generators and generated 936.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Harquahala Generating Project |
---|---|
Utility Name | New Harquahala Generating Co, LLC |
Location | Maricopa County, AZ |
Initial Operation Date | June 2004 |
Last Update | Dec 2024 |
Annual Generation | 3.3 TWh |
Annual Consumption | 24.6 M MMBtu |
Ranked #351 out of 11,949 Power Plants Nationwide | |
Ranked #207 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #9 out of 159 Arizona Power Plants | |
Ranked #7 out of 34 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Harquahala Generating Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harquahala Generating Project.
Monthly Net Generation for Harquahala Generating Project
Harquahala Generating Project Details
Summary Information | |
---|---|
Plant Name | Harquahala Generating Project (55372) |
Plant Address | 2530 North 491 Ave, Tonopah, AZ 85354 |
Utility | New Harquahala Generating Co, LLC (32790) |
Latitude, Longitude | 33.47596, -113.11343 |
Generation Dates on File | Sep 2004 to Dec 2024 |
Initial Operation Date | June 2004 |
Annual Generation | 3.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-81-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | New Harquahala Generating Company, LLC - HGBA (HGMA) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Central Arizona Project/Well |
Ash Impoundment | No |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 525.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
Natural Gas Storage | No |
Generator CTG1 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 281.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 239.9 MW |
Winter Capacity | 244 MW |
Minimum Load | 135.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 144 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 119.8 MW |
Winter Capacity | 121.8 MW |
Minimum Load | 88.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CTG3 Details Operating August 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 281.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 226.2 MW |
Winter Capacity | 245.2 MW |
Minimum Load | 135.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG3 Details Operating August 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK3 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 144 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 115.5 MW |
Winter Capacity | 120.4 MW |
Minimum Load | 87.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2004 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CTG2 Details Operating September 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 281.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 226.6 MW |
Winter Capacity | 247.8 MW |
Minimum Load | 137.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG2 Details Operating September 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 144 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 114.9 MW |
Winter Capacity | 121.1 MW |
Minimum Load | 85.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2004 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Harquahala Generating Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#197 | Wansley Unit 9 | Franklin, GA | 3.5 TWh |
#198 | Wise County Power LLC | Poolville, TX | 3.4 TWh |
#199 | Hinds Energy Facility | Jackson, MS | 3.4 TWh |
#200 | Bear Garden | New Canton, VA | 3.4 TWh |
#201 | Mesquite Generating Station Block 2 | Arlington, AZ | 3.4 TWh |
#202 | Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh |
#203 | Cherokee | Denver, CO | 3.4 TWh |
#204 | Riverside Energy Center | Beloit, WI | 3.4 TWh |
#205 | J Lamar Stall Unit | Shreveport, LA | 3.3 TWh |
#206 | Hermiston Generating Plant | Hermiston, OR | 3.3 TWh |
#208 | Luna Energy Facility | Deming, NM | 3.3 TWh |
#209 | Kings Mountain Energy Center | Kings Mountain, NC | 3.3 TWh |
#210 | West Phoenix | Phoenix, AZ | 3.3 TWh |
#211 | Columbia Energy Center (SC) | Gaston, SC | 3.3 TWh |
#212 | Red Oak Power LLC | Sayreville, NJ | 3.2 TWh |
#213 | Harrison County Power Project | Marshall, TX | 3.2 TWh |
#214 | Los Medanos Energy Center | Pittsburg, CA | 3.2 TWh |
#215 | Gila River Power Block 2 | Gila Bend, AZ | 3.2 TWh |
#216 | Fore River Generating Station | North Weymouth, MA | 3.3 TWh |
#217 | Wolf Hollow I LP | Granbury, TX | 3.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harquahala Generating Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agave | AZ | 98.9 GWh | 19 mi |
Arlington Valley Energy Facility | Arlington, AZ | 3.6 TWh | 15.9 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 20 mi |
Badger 1 | Tonopah, AZ | 33.2 GWh | 17.4 mi |
Buckeye Union HS District 201 | Buckeye, AZ | 6.3 GWh | 31.2 mi |
Hyder II Hybrid | Hyder, AZ | 30.3 GWh | 33.9 mi |
Hyder Solar Hybrid | Hyder, AZ | 40.2 GWh | 33.8 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 17 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.4 TWh | 17 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 15.2 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 276.6 GWh | 15.3 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 456.3 GWh | 13.5 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 146.8 GWh | 15.2 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 117.0 GWh | 15.3 mi |
Palo Verde | Wintersburg, AZ | 32.4 TWh | 15.7 mi |
Red Hawk | Arlington, AZ | 4.2 TWh | 18.5 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 7.8 mi |
Sun Streams 2 | Hassayampa, AZ | 311.9 GWh | 20.2 mi |
Sun Streams 3 | Arlington, AZ | 547.4 GWh | 20 mi |
Sun Streams, LLC | Arlington, AZ | 408.0 GWh | 18.3 mi |