Hardy
Croton-Hardy @ 36th, Newaygo, MI 49337Plant Summary Information
Hardy is ranked #4 out of 51 hydroelectric power plants in Michigan in terms of total annual net electricity generation.
Hardy is comprised of 3 generators and generated 16.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hardy |
---|---|
Utility Name | Consumers Energy Co - (MI) |
Location | Newaygo County, MI |
Initial Operation Date | June 1931 |
Last Update | Dec 2023 |
Annual Generation | 76.5 GWh |
Annual Consumption | 284.9 k MMBtu |
Ranked #3,486 out of 11,866 Power Plants Nationwide | |
Ranked #412 out of 1,369 Water Power Plants Nationwide | |
Ranked #83 out of 257 Michigan Power Plants | |
Ranked #4 out of 51 Michigan Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Consumers Energy Co (2013 to 2022) Consumers Energy Co - (MI) (2023 to 2023) |
Map of Hardy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hardy.
Monthly Net Generation for Hardy
Hardy Details
Summary Information | |
---|---|
Plant Name | Hardy (1707) |
Plant Address | Croton-Hardy @ 36th, Newaygo, MI 49337 |
Utility | Consumers Energy Co - (MI) (4254) |
Latitude, Longitude | 43.48662, -85.62987 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1931 |
Annual Generation | 76.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Muskegon River |
Ash Impoundment | |
Transmission / Distribution Owner | ITC Transmission (56068) MI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.6 MW |
Winter Capacity | 10.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating June 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.7 MW |
Winter Capacity | 10.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating June 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 11.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.1 MW |
Winter Capacity | 12.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Hardy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#402 | Boysen | Thermopolis, WY | 81.3 GWh |
#403 | Jeffrey | Brady, NE | 81.3 GWh |
#404 | Prospect | Prospect, NY | 81.1 GWh |
#405 | William F Matson Generating Station | Huntingdon, PA | 81.1 GWh |
#406 | Ocoee 2 | Benton, TN | 80.7 GWh |
#407 | Glendo | Glendo, WY | 80.6 GWh |
#408 | Blue Lake Hydro | Sitka, AK | 80.3 GWh |
#409 | Drop 4 | Holtville, CA | 79.8 GWh |
#410 | Upper Mechanicville | Town of Stillwater, NY | 79.6 GWh |
#411 | Stevens Creek | Martinez, GA | 78.9 GWh |
#413 | Grandfather Falls | Irma, WI | 76.4 GWh |
#414 | Grahamsville | Grahamsville, NY | 75.9 GWh |
#415 | Big Cliff | Gates, OR | 75.8 GWh |
#416 | Castle Rock | Adams, WI | 75.6 GWh |
#417 | Sheldon Springs Hydroelectric | Sheldon Springs, VT | 74.8 GWh |
#418 | McNary Dam Fish Attraction Project | Plymouth, WA | 73.8 GWh |
#419 | Hills Creek | Oakridge, OR | 73.7 GWh |
#420 | Narrows PH | Grass Valley, CA | 73.5 GWh |
#421 | Allegheny Hydro No 8 | Adrian, PA | 73.2 GWh |
#422 | Buffalo Bill | Cody, WY | 73.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hardy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ada Cogeneration LP | Ada, MI | 181.1 GWh | 36.8 mi |
Ada Dam | Ada, MI | 1.9 GWh | 37.7 mi |
Bissell Solar and Battery Generator | Grand Rapids, MI | 985.0 MWh | 33.5 mi |
Byrne Solar, LLC | Lowell, MI | 198.0 MWh | 32.9 mi |
Cargill Salt Hersey | Hersey, MI | 318.2 MWh | 27.6 mi |
Cascade Dam | Grand Rapids, MI | 3.8 GWh | 40.4 mi |
Central Generating | Pierson, MI | 17.7 GWh | 12.3 mi |
Central Michigan University | Mt. Pleasant, MI | 25.2 GWh | 43.2 mi |
Chatham | Lowell, MI | 48.0 MWh | 40.7 mi |
Coopersville | Coopersville, MI | 39.6 GWh | 34.5 mi |
Croton | Newaygo, MI | 20.4 GWh | 3.8 mi |
Fremont Community Digester, LLC | Newaygo, MI | 10.9 GWh | 17.5 mi |
George Johnson | Hersey, MI | 19.1 GWh | 26.4 mi |
Grand Valley Solar Gardens | Allendale, MI | 4.3 GWh | 39.3 mi |
Hazel Solar, LLC | Howard City, MI | 3.8 GWh | 10.6 mi |
Kent County Waste to Energy Facility | Grand Rapids, MI | 98.4 GWh | 37.2 mi |
Lorin Industries | Muskegon, MI | 4.4 GWh | 34.8 mi |
Macbeth Solar | Montague, MI | 36.1 GWh | 36.4 mi |
Rogers | Big Rapids, MI | 23.3 GWh | 11.5 mi |
Vestaburg | Vestaburg, MI | 1.4 GWh | 36.4 mi |