Hardin County LFGTE
1598 Audubon Trace, Elizabethtown, KY 42701Plant Summary Information
Hardin County LFGTE is ranked #37 out of 54 power plants in Kentucky in terms of total annual net electricity generation.
Hardin County LFGTE is comprised of 3 generators and generated 2.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hardin County LFGTE |
---|---|
Utility Name | East Kentucky Power Coop, Inc |
Location | Hardin County, KY |
Initial Operation Date | January 2006 |
Last Update | Dec 2023 |
Annual Generation | 8.9 GWh |
Annual Consumption | 114.5 k MMBtu |
Ranked #6,256 out of 11,835 Power Plants Nationwide | |
Ranked #237 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #37 out of 54 Kentucky Power Plants | |
Ranked #4 out of 9 Kentucky Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Hardin County LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hardin County LFGTE.
Monthly Net Generation for Hardin County LFGTE
Hardin County LFGTE Details
Summary Information | |
---|---|
Plant Name | Hardin County LFGTE (56280) |
Plant Address | 1598 Audubon Trace, Elizabethtown, KY 42701 |
Utility | East Kentucky Power Coop, Inc (5580) |
Latitude, Longitude | 37.7258, -85.7258 |
Generation Dates on File | Jan 2006 to Dec 2023 |
Initial Operation Date | January 2006 |
Annual Generation | 8.9 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | East Kentucky Power Coop, Inc (5580) |
Grid Voltage | 14.40 kV |
Energy Storage | No |
Generator 1 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Hardin County LFGTE Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#227 | MM Albany Energy | Albany, NY | 9.7 GWh |
#228 | MM Tulare Energy | Visalia, CA | 9.7 GWh |
#229 | Hernando | Brooksville, FL | 9.7 GWh |
#230 | Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 9.5 GWh |
#231 | Frederick County LFGTE Facility | Winchester, VA | 9.4 GWh |
#232 | Ameresco Johnson Canyon | Gonzales, CA | 9.3 GWh |
#233 | Adrian Energy Associates LLC | Adrian, MI | 9.3 GWh |
#234 | New River Clean Energy | Beckley, WV | 9.1 GWh |
#235 | Veolia ES Blackfoot Landfill Facility | Winslow, IN | 9.0 GWh |
#236 | Ameresco Janesville | Janesville, WI | 9.0 GWh |
#238 | Norther Tier Landfill | Burlington, PA | 8.8 GWh |
#239 | G2 Energy Marion LLC | Ocala, FL | 8.7 GWh |
#240 | Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.5 GWh |
#241 | Horry Land Fill Gas Site | Conway, SC | 8.4 GWh |
#242 | Terreva Wayne County RNG, LLC | Dudley, NC | 8.2 GWh |
#243 | MM Taunton Energy | Taunton, MA | 8.1 GWh |
#244 | Sonoma Central Landfill Phase I | Petaluma, CA | 8.1 GWh |
#245 | Waste Management Northern Oaks LFGTE | Harrison, MI | 8.0 GWh |
#246 | CII Methane Management IV, LLC | Smithfield, NC | 7.9 GWh |
#247 | Prairie Bluff | Houston, MS | 7.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hardin County LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bluegrass Generating Station | LaGrange, KY | 36.5 GWh | 49 mi |
Cane Run | Louisville, KY | 4.3 TWh | 32.8 mi |
Cannelton Hydroelectric Plant | Hawesville, KY | 460.6 GWh | 54.8 mi |
Cox Waste to Energy | Campbellsville, KY | 924.0 MWh | 34.4 mi |
Dix Dam | Harrodsburg, KY | 44.0 GWh | 56 mi |
E W Brown | Harrodsburg, KY | 1.4 TWh | 55.5 mi |
Glasgow LFGTE | Glasgow, KY | 4.3 GWh | 52.6 mi |
Glover Creek Solar, LLC | Summer Shade, KY | 31.8 GWh | 57 mi |
Henryville Solar RES | Underwood, IN | 1.7 GWh | 60.2 mi |
IMPA Tell City Solar Park | Tell City, IN | 5.1 GWh | 57.3 mi |
Kentucky Mills | Hawesville, KY | 327.9 GWh | 53.7 mi |
Lanesville Solar RES | Lanesville, IN | 1.6 GWh | 40.3 mi |
LGE-KU Solar Share Facility Simpsonville | Simpsonville, KY | 1.0 MWh | 38.5 mi |
Mill Creek (KY) | Louisville, KY | 7.3 TWh | 24.7 mi |
Mother Ann Lee | Harrodsburg, KY | 6.2 GWh | 55.1 mi |
Ohio Falls | Shippingport Island, KY | 272.0 GWh | 38.6 mi |
Paddys Run | Louisville, KY | 82.6 GWh | 35 mi |
Tell City Solar Park | Tell City, IN | 1.6 GWh | 57.6 mi |
Trimble County | Bedford, KY | 9.0 TWh | 61.7 mi |
Troy Solar | Troy, IN | 88.9 GWh | 61.5 mi |