Hamlet Generating Facility
162 Cooperative Way, Hamlet, NC 28345Plant Summary Information
Hamlet Generating Facility is ranked #17 out of 30 natural gas power plants in North Carolina in terms of total annual net electricity generation.
Hamlet Generating Facility is comprised of 6 generators and generated 23.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hamlet Generating Facility |
---|---|
Utility Name | North Carolina El Member Corp |
Location | Richmond County, NC |
Initial Operation Date | December 2007 |
Last Update | Dec 2023 |
Annual Generation | 76.7 GWh |
Annual Consumption | 990.1 k MMBtu |
Ranked #3,459 out of 11,835 Power Plants Nationwide | |
Ranked #977 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #89 out of 862 North Carolina Power Plants | |
Ranked #17 out of 30 North Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas : 98.2% Distillate Fuel Oil : 1.8% |
Map of Hamlet Generating Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hamlet Generating Facility.
Monthly Net Generation for Hamlet Generating Facility
Hamlet Generating Facility Details
Summary Information | |
---|---|
Plant Name | Hamlet Generating Facility (56292) |
Plant Address | 162 Cooperative Way, Hamlet, NC 28345 |
Utility | North Carolina El Member Corp (13683) |
Latitude, Longitude | 34.84231, -79.73609 |
Generation Dates on File | Dec 2007 to Dec 2023 |
Initial Operation Date | December 2007 |
Annual Generation | 76.7 GWh |
Fuel Types | Natural Gas : 98.2% Distillate Fuel Oil : 1.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | County Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PIEDMONT NATURAL GAS |
Natural Gas Storage | No |
Generator ES1 Details Operating December 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 56.5 MW |
Winter Capacity | 61.1 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 56.5 MW |
Net Winter Capacity With Natural Gas | 61.1 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ES2 Details Operating December 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Hamlet 13.8 KV G2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Hamlet 13.8 KV G2 |
Nameplate Capacity | 57.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 56.5 MW |
Winter Capacity | 61.1 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 56.5 MW |
Net Winter Capacity With Natural Gas | 61.1 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ES3 Details Operating December 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Hamlet 13.8 KV G3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Hamlet 13.8 KV G3 |
Nameplate Capacity | 57.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 56.5 MW |
Winter Capacity | 61.1 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 56.5 MW |
Net Winter Capacity With Natural Gas | 61.1 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ES4 Details Operating December 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 56.5 MW |
Winter Capacity | 61.1 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 56.5 MW |
Net Winter Capacity With Natural Gas | 61.1 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ES5 Details Operating December 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 56.5 MW |
Winter Capacity | 61.1 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 56.5 MW |
Net Winter Capacity With Natural Gas | 61.1 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ES6 Details Operating July 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Hamlet 13.8 KV G6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Hamlet 13.8 KV G6 |
Nameplate Capacity | 57.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 56.5 MW |
Winter Capacity | 61.1 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 56.5 MW |
Net Winter Capacity With Natural Gas | 61.1 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Hamlet Generating Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#967 | Rokeby | Lincoln, NE | 80.3 GWh |
#968 | DeRidder Mill | DeRidder, LA | 389.0 GWh |
#969 | Sowega Power | Baconton, GA | 77.2 GWh |
#970 | Wolf Hills Energy | Bristol, VA | 77.1 GWh |
#971 | Cargill Corn Milling Division | Eddyville, IA | 76.3 GWh |
#972 | Camden Plant Holding LLC | Camden, NJ | 76.0 GWh |
#973 | Gibson City Energy Center LLC | Gibson City, IL | 75.8 GWh |
#974 | River Valley | Panama, OK | 541.9 GWh |
#975 | NCSU Cates Cogeneration Plant | Raleigh, NC | 76.4 GWh |
#976 | Ford Utilities Center | Albuquerque, NM | 75.7 GWh |
#978 | Neil Simpson II | Gillette, WY | 685.7 GWh |
#979 | Gilroy Power Plant | Gilroy, CA | 74.5 GWh |
#980 | Cleveland Works | Cleveland, OH | 205.0 GWh |
#981 | Essex | Essex, MO | 74.3 GWh |
#982 | WestRock (TX) | Evadale, TX | 406.8 GWh |
#983 | Dan E Karn | Essexville, MI | 78.8 GWh |
#984 | Corpus Christi | Corpus Christi, TX | 72.9 GWh |
#985 | UMCP CHP Plant | College Park, MD | 75.5 GWh |
#986 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh |
#987 | Summit Lake | Creston, IA | 72.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hamlet Generating Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anson County Generation Facility | Lilesville, NC | 92.2 GWh | 13.7 mi |
Blewett | Lilesville, NC | 116.1 GWh | 12.6 mi |
County Home Solar LLC | Rockingham, NC | 9.6 GWh | 5.8 mi |
ESA Hamlet NC , LLC | Hamlet, NC | 8.1 GWh | 4.4 mi |
Hamlet Solar Energy Storage | Hamlet, NC | 252.0 MWh | 0.3 mi |
Hickson Solar, LLC | Wallace, SC | 4.7 GWh | 11.3 mi |
Innovative Solar 37 LLC | Morven, NC | 118.6 GWh | 11.8 mi |
Innovative Solar 65 | Laurinburg, NC | 9.0 GWh | 14.6 mi |
McLean Homestead | Laurinburg, NC | 4.0 GWh | 14.1 mi |
Mills Anson Farm | Lilesville, NC | 8.7 GWh | 14.3 mi |
North Carolina Solar III LLC | Gibson, NC | 8.9 GWh | 11.3 mi |
Oakboro Farm | Laurinburg, NC | 8.3 GWh | 11.7 mi |
Old Wire Farm | Laurel Hill, NC | 10.1 GWh | 12.7 mi |
Pecan PV1 | Cordova, NC | 9.2 GWh | 7 mi |
Polk Farm | Hamlet, NC | 11.1 GWh | 7.2 mi |
Rock Farm | Rockingham, NC | 9.2 GWh | 11.1 mi |
Rockingham Solar, LLC | Marston, NC | 9.5 GWh | 12.1 mi |
Sellers Farm Solar | Hamlet, NC | 10.6 GWh | 4.9 mi |
Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh | 0.3 mi |
Smith Solar Farm | Gibson, NC | 10.5 GWh | 11.1 mi |