Hamilton Solar Power Plant
3974 SW 69th Dr, Jasper, FL 32052Plant Summary Information
Hamilton Solar Power Plant is ranked #33 out of 199 solar farms in Florida in terms of total annual net electricity generation.
Hamilton Solar Power Plant generated 32.3 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Hamilton Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Hamilton County, FL |
Initial Operation Date | December 2018 |
Last Update | Jan 2025 |
Annual Generation | 153.9 GWh |
Annual Consumption | 556.3 k MMBtu |
Ranked #2,683 out of 11,979 Power Plants Nationwide | |
Ranked #409 out of 5,765 Solar Power Plants Nationwide | |
Ranked #104 out of 307 Florida Power Plants | |
Ranked #33 out of 199 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Hamilton Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hamilton Solar Power Plant.
Monthly Net Generation for Hamilton Solar Power Plant
Hamilton Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Hamilton Solar Power Plant (61807) |
Plant Address | 3974 SW 69th Dr, Jasper, FL 32052 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 30.44432, -83.18694 |
Generation Dates on File | Dec 2018 to Jan 2025 |
Initial Operation Date | December 2018 |
Annual Generation | 153.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 109.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hamilton Solar Power Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#399 | Cove Mountain Solar | Beryl, UT | 155.4 GWh |
#400 | Grizzly Ridge Solar | Hamilton County, TX | 155.0 GWh |
#401 | Ellis Solar LLC | Midlothian, TX | 154.9 GWh |
#402 | RE Astoria 2 | Rosamond, CA | 154.6 GWh |
#403 | FPL Etonia Creek | Palatka, FL | 154.6 GWh |
#404 | Gutenberg Solar | Garysburg, NC | 154.6 GWh |
#405 | Crescent Dunes Solar Energy | Tonopah, NV | 154.4 GWh |
#406 | Powells Creek Solar - Hybrid | Alton, VA | 154.3 GWh |
#407 | Sabal Palm Solar Center | Loxahatchee, FL | 154.1 GWh |
#408 | Sandy Creek Solar Power Plant | Panama City, FL | 154.0 GWh |
#410 | Pelican Solar Center | Ft. Pierce, FL | 153.0 GWh |
#411 | Ibis | Palm Bay, FL | 152.9 GWh |
#412 | Dileo Solar | Clifton, TX | 152.6 GWh |
#413 | Immokalee | Immokalee, FL | 152.5 GWh |
#414 | Allora Solar, LLC | Gilbert, SC | 152.0 GWh |
#415 | River Bend Solar, LLC | Florence, AL | 151.7 GWh |
#416 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.6 GWh |
#417 | SR DeSoto II | DeSoto, GA | 151.6 GWh |
#418 | Blake Solar Plant | Charles Town, WV | 151.6 GWh |
#419 | Nature Trail | TBD, FL | 151.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hamilton Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buckeye Florida LP | Perry, FL | 270.5 GWh | 32.9 mi |
Echo River Solar | Live Oak, FL | 148.6 GWh | 21.8 mi |
Georges Lake | TBD, FL | 26.5 GWh | 10.1 mi |
Lowndes Cowart | Valdosta, GA | 1.1 GWh | 25.8 mi |
Lowndes IDA | Valdosta, GA | 2.9 GWh | 27.1 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 16.9 mi |
Moody Air Force Base Solar | Valdosta, GA | 68.3 GWh | 35.5 mi |
Norton Creek | TBD, FL | 23.6 GWh | 10.1 mi |
PCA-Valdosta Mill | Valdosta, GA | 306.6 GWh | 18.6 mi |
Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh | 27.7 mi |
Perry Solar Facility | Perry, FL | 7.2 GWh | 31.6 mi |
Sunshine Gateway Solar Energy Center | Lake City, FL | 131.4 GWh | 28.1 mi |
Suwannee River | Live Oak, FL | 42.3 GWh | 4.7 mi |
Suwannee Solar Facility | Live Oak, FL | 16.7 GWh | 4.8 mi |
Swift Creek Chemical Complex | White Springs, FL | 61.0 GWh | 19.2 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 158.8 GWh | 13.1 mi |
Valdosta | Valdosta, GA | 1.5 GWh | 25.4 mi |
Valdosta Prison | Valdosta, GA | 1.8 GWh | 32.2 mi |
Valdosta Water Treatment Plant | Valdosta, GA | 42.0 MWh | 32.7 mi |
Winquepin Renewable Energy Center | Lee, FL | 107.5 GWh | 13 mi |