Hamilton Solar Power Plant
3974 SW 69th Dr, Jasper, FL 32052Plant Summary Information
Hamilton Solar Power Plant is ranked #24 out of 171 solar farms in Florida in terms of total annual net electricity generation.
Hamilton Solar Power Plant generated 40.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Hamilton Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Hamilton County, FL |
Initial Operation Date | December 2018 |
Last Update | Aug 2024 |
Annual Generation | 152.0 GWh |
Annual Consumption | 573.7 k MMBtu |
Ranked #2,642 out of 11,835 Power Plants Nationwide | |
Ranked #362 out of 5,643 Solar Power Plants Nationwide | |
Ranked #94 out of 279 Florida Power Plants | |
Ranked #24 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Hamilton Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hamilton Solar Power Plant.
Monthly Net Generation for Hamilton Solar Power Plant
Hamilton Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Hamilton Solar Power Plant (61807) |
Plant Address | 3974 SW 69th Dr, Jasper, FL 32052 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 30.44432, -83.18694 |
Generation Dates on File | Dec 2018 to Aug 2024 |
Initial Operation Date | December 2018 |
Annual Generation | 152.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 109.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hamilton Solar Power Plant Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#352 | Spring Grove I | Spring Grove, VA | 155.4 GWh |
#353 | Hardeetown Solar Power Plant | Chiefland, FL | 154.6 GWh |
#354 | Gutenberg Solar | Garysburg, NC | 153.7 GWh |
#355 | Twin Rivers Solar Power Plant | Jasper, FL | 153.7 GWh |
#356 | Sabal Palm Solar Center | Loxahatchee, FL | 153.7 GWh |
#357 | Powells Creek Solar - Hybrid | Alton, VA | 153.1 GWh |
#358 | SR Perry | Perry, GA | 153.1 GWh |
#359 | Pelican Solar Center | Ft. Pierce, FL | 152.8 GWh |
#360 | Charlie Creek Solar Power Plant | Wauchula, FL | 152.8 GWh |
#361 | Badger Hollow II | Cobb, WI | 152.3 GWh |
#363 | Mulligan Solar, LLC | Broadwell, IL | 151.9 GWh |
#364 | Apex Solar | Dillon, MT | 151.7 GWh |
#365 | River Bend Solar, LLC | Florence, AL | 151.5 GWh |
#366 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.4 GWh |
#367 | Duette Solar Power Plant | Parrish, FL | 151.2 GWh |
#368 | Immokalee | Immokalee, FL | 150.7 GWh |
#369 | Columbia Solar Power Plant | Fort White, FL | 150.5 GWh |
#370 | Orange Blossom Solar Center | Vero Beach, FL | 150.2 GWh |
#371 | Chestnut Solar | Enfield, NC | 150.1 GWh |
#372 | Cereal City Solar, LLC | Battle Creek, MI | 149.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hamilton Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buckeye Florida LP | Perry, FL | 270.5 GWh | 32.9 mi |
Echo River Solar | Live Oak, FL | 158.9 GWh | 21.8 mi |
Hildreth Solar Power Plant | O'Brien, FL | 166.6 GWh | 39.6 mi |
Lowndes Cowart | Valdosta, GA | 1.1 GWh | 25.8 mi |
Lowndes IDA | Valdosta, GA | 2.9 GWh | 27.1 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 16.9 mi |
Moody Air Force Base Solar | Valdosta, GA | 75.6 GWh | 35.5 mi |
PCA-Valdosta Mill | Valdosta, GA | 306.6 GWh | 18.6 mi |
Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh | 27.7 mi |
Perry Solar Facility | Perry, FL | 7.2 GWh | 31.6 mi |
Quitman Solar | Quitman, GA | 340.1 GWh | 39 mi |
Sunshine Gateway Solar Energy Center | Lake City, FL | 130.6 GWh | 28.1 mi |
Suwannee River | Live Oak, FL | 42.3 GWh | 4.7 mi |
Suwannee Solar Facility | Live Oak, FL | 16.7 GWh | 4.8 mi |
Swift Creek Chemical Complex | White Springs, FL | 71.9 GWh | 19.2 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 153.7 GWh | 13.1 mi |
Valdosta | Valdosta, GA | 1.5 GWh | 25.4 mi |
Valdosta Prison | Valdosta, GA | 1.8 GWh | 32.2 mi |
Valdosta Water Treatment Plant | Valdosta, GA | 42.0 MWh | 32.7 mi |
Winquepin Renewable Energy Center | Lee, FL | 71.0 GWh | 13 mi |