H M Jackson
31411 116th SE Extended, Sultan, WA 98294Plant Summary Information
H M Jackson is ranked #43 out of 131 power plants in Washington in terms of total annual net electricity generation.
H M Jackson is comprised of 4 generators and generated 102.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | H M Jackson |
---|---|
Utility Name | PUD 1 of Snohomish County |
Location | Snohomish County, WA |
Initial Operation Date | June 1984 |
Last Update | Dec 2022 |
Annual Generation | 458.6 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,427 out of 11,249 Power Plants Nationwide | |
Ranked #116 out of 1,354 Water Power Plants Nationwide | |
Ranked #43 out of 131 Washington Power Plants | |
Ranked #23 out of 69 Washington Water Power Plants | |
Fuel Types | Water |
Map of H M Jackson
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for H M Jackson.
Monthly Net Generation for H M Jackson
H M Jackson Details
Summary Information | |
---|---|
Plant Name | H M Jackson (7588) |
Plant Address | 31411 116th SE Extended Sultan, WA 98294 |
Utility | PUD 1 of Snohomish County (17470) |
Latitude, Longitude | 47.9084, -121.8144 |
Generation Dates on File | Jan 2002 to Dec 2022 |
Initial Operation Date | June 1984 |
Annual Generation | 458.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Sultan River |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD 1 of Snohomish County (17470) WA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 47.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 44 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating June 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 47.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 44 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating June 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 8.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 7 MW |
Winter Capacity | 8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating June 1984
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 8.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 7 MW |
Winter Capacity | 8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
H M Jackson Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#106 | R C Kirkwood | Groveland, CA | 487.1 GWh |
#107 | Apalachia | Reliance, TN | 486.7 GWh |
#108 | Hartwell Lake | Hartwell, GA | 474.6 GWh |
#109 | Walter F George | Ft. Gaines, GA | 473.5 GWh |
#110 | Bartletts Ferry | Salem, AL | 470.8 GWh |
#111 | Smithland Hydroelectric Plant | Smithland, KY | 467.3 GWh |
#112 | Chelan | Wenatchee, WA | 465.1 GWh |
#113 | Camino | Camino, CA | 464.4 GWh |
#114 | Center Hill | Lancaster, TN | 462.0 GWh |
#115 | Logan Martin Dam | Vincent, AL | 459.4 GWh |
#117 | Narrows (NC) | Badin, NC | 453.9 GWh |
#118 | Douglas Dam | Dandridge, TN | 451.8 GWh |
#119 | Caribou 2 | Belden, CA | 449.9 GWh |
#120 | Ross | Rockport, WA | 448.8 GWh |
#121 | Summer Falls Power Plant | Coulee City, WA | 442.3 GWh |
#122 | Cordell Hull | Carthage, TN | 437.5 GWh |
#123 | Dardanelle | Dardanelle, AR | 431.7 GWh |
#124 | Ryan | Great Falls, MT | 421.4 GWh |
#125 | Electra | Jackson, CA | 420.9 GWh |
#126 | Parker Dam | Parker, CA | 420.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding H M Jackson.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Microgrid | Arlington, WA | 641.0 MWh | 23.1 mi |
Black Creek | Snoqualmie, WA | 7.2 GWh | 25.3 mi |
Calligan Creek Hydroelectric Project | Snoqualmie, WA | 6.1 GWh | 22 mi |
Cedar Falls (WA) | North Bend, WA | 92.4 GWh | 33.8 mi |
Darrington | Darrington, WA | 17.8 GWh | 26.9 mi |
Fredonia | Mt Vernon, WA | 1.2 TWh | 47.4 mi |
Hancock Creek Hydroelectric Project | Snoqualmie, WA | 6.4 GWh | 23.9 mi |
HF Sinclair Puget Sound Refining | Anacortes, WA | 1.0 TWh | 51.9 mi |
Lower Baker | Concrete, WA | 359.6 GWh | 44.3 mi |
Sierra Pacific Burlington Facility | Mt Vernon, WA | 105.7 GWh | 46.9 mi |
Snoqualmie | Snoqualmie, WA | 52.5 GWh | 25.5 mi |
Snoqualmie 2 | Snoqualmie, WA | 144.2 GWh | 25.2 mi |
South Fork Tolt | North Bend, WA | 64.6 GWh | 14.5 mi |
Twin Falls Hydro | North Bend, WA | 79.1 GWh | 32.6 mi |
University of Washington Power Plant | Seattle, WA | 3.9 GWh | 28.7 mi |
Upper Baker | Concrete, WA | 309.6 GWh | 51.5 mi |
Weeks Falls | North Bend, WA | 14.0 GWh | 33.7 mi |
West Point Treatment Plant | Seattle, WA | 11.0 GWh | 34 mi |
WestRock (WA) | Tacoma, WA | 255.4 GWh | 52.8 mi |
Youngs Creek Hydroelectric Project | Monroe, WA | 16.6 GWh | 8.1 mi |