Guntersville
3464 Snow Point Rd., Guntersville, AL 35976Plant Summary Information
Guntersville is ranked #29 out of 75 power plants in Alabama in terms of total annual net electricity generation.
Guntersville is comprised of 4 generators and generated 133.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Guntersville |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Marshall County, AL |
Initial Operation Date | August 1939 |
Last Update | Dec 2023 |
Annual Generation | 453.4 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,375 out of 11,835 Power Plants Nationwide | |
Ranked #97 out of 1,371 Water Power Plants Nationwide | |
Ranked #29 out of 75 Alabama Power Plants | |
Ranked #5 out of 23 Alabama Water Power Plants | |
Fuel Types | Water |
Map of Guntersville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Guntersville.
Monthly Net Generation for Guntersville
Guntersville Details
Summary Information | |
---|---|
Plant Name | Guntersville (48) |
Plant Address | 3464 Snow Point Rd., Guntersville, AL 35976 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 34.42127, -86.39393 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1939 |
Annual Generation | 453.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Tennessee River |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) AL |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 2 Details Operating October 1939
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 28.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 30.6 MW |
Winter Capacity | 31.1 MW |
Minimum Load | 12.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1939 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating December 1939
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 28.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 29.8 MW |
Winter Capacity | 30.3 MW |
Minimum Load | 9.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1939 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1 Details Operating August 1939
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 28.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31.4 MW |
Minimum Load | 9.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1939 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating March 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 28.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31.3 MW |
Winter Capacity | 31.7 MW |
Minimum Load | 14.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Guntersville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#87 | Middle Fork | Foresthill, CA | 492.1 GWh |
#88 | Balch 2 | Balch Camp, CA | 489.7 GWh |
#89 | Ryan | Great Falls, MT | 486.3 GWh |
#90 | Merwin | Ariel, WA | 471.6 GWh |
#91 | Wolf Creek | Jamestown, KY | 470.5 GWh |
#92 | Narrows (NC) | Badin, NC | 462.5 GWh |
#93 | Jaybird | Camino, CA | 461.8 GWh |
#94 | Cannelton Hydroelectric Plant | Hawesville, KY | 460.6 GWh |
#95 | Ralston | Foresthill, CA | 459.9 GWh |
#96 | Lay Dam | Clanton, AL | 454.7 GWh |
#98 | Big Creek 4 | North Fork, CA | 452.9 GWh |
#99 | Cheoah | Tapoco, NC | 447.8 GWh |
#100 | Summer Falls Power Plant | Coulee City, WA | 447.2 GWh |
#101 | Fairfield Pumped Storage | Jenkinsville, SC | 445.8 GWh |
#102 | R C Kirkwood | Groveland, CA | 437.6 GWh |
#103 | Apalachia | Reliance, TN | 435.9 GWh |
#104 | Hawks Nest Hydro | Gauley Bridge, WV | 435.2 GWh |
#105 | Walter F George | Ft. Gaines, GA | 426.4 GWh |
#106 | Dardanelle | Dardanelle, AR | 426.2 GWh |
#107 | Flaming Gorge | Dutch John, UT | 413.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Guntersville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 83.0 MWh | 62 mi |
ANAD Solar Array | Anniston Army Depot, AL | 10.7 GWh | 60 mi |
Browns Ferry | Decatur, AL | 30.5 TWh | 45.6 mi |
Calhoun Energy Center | Eastaboga, AL | 270.0 GWh | 62.4 mi |
Cumblerland Land Holdings, LLC | Elkmont, AL | 28.6 GWh | 45.4 mi |
Decatur Energy Center | Decatur, AL | 3.0 TWh | 38.5 mi |
Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 10.7 GWh | 42.6 mi |
Elora Solar | Elora, TN | 309.7 GWh | 44.2 mi |
H Neely Henry Dam | Ohatchee, AL | 196.7 GWh | 48.1 mi |
Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh | 61.9 mi |
James H Miller Jr | Quinton, AL | 17.1 TWh | 66.5 mi |
Lewis Smith Dam | Jasper, AL | 233.4 GWh | 52.6 mi |
Morgan Energy Center | Decatur, AL | 4.5 TWh | 41 mi |
Nickajack | New Hope, TN | 509.6 GWh | 59.4 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 15.5 GWh | 18 mi |
Sand Valley Power Station | Collinsville, AL | 30.6 GWh | 30.6 mi |
TAI Huntsville Solar Hybrid | Huntsville, AL | 13.3 GWh | 31.2 mi |
Tims Ford | Winchester, TN | 41.7 GWh | 54 mi |
Weiss Dam | Leesburg, AL | 183.2 GWh | 40.4 mi |
Wheeler Dam | Town Creek, AL | 1.1 TWh | 62.2 mi |