Gunnison Solar
425 E 400 N, Gunnison, UT 84634Plant Summary Information
Gunnison Solar is ranked #45 out of 51 solar farms in Utah in terms of total annual net electricity generation.
Gunnison Solar generated 747.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gunnison Solar |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Sanpete County, UT |
Initial Operation Date | September 2022 |
Last Update | Dec 2023 |
Annual Generation | 3.9 GWh |
Annual Consumption | 13.8 k MMBtu |
Ranked #8,229 out of 11,852 Power Plants Nationwide | |
Ranked #3,202 out of 5,655 Solar Power Plants Nationwide | |
Ranked #101 out of 121 Utah Power Plants | |
Ranked #45 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Map of Gunnison Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gunnison Solar.
Monthly Net Generation for Gunnison Solar
Gunnison Solar Details
Summary Information | |
---|---|
Plant Name | Gunnison Solar (65618) |
Plant Address | 425 E 400 N, Gunnison, UT 84634 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 39.16743, -111.80102 |
Generation Dates on File | Sep 2022 to Dec 2023 |
Initial Operation Date | September 2022 |
Annual Generation | 3.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF21-612; QF21-612-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator 524 Details Operating September 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Tilt Angle | 52 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Gunnison Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3192 | Columbia Substation | Appling, GA | 3.9 GWh |
#3193 | Oxford | Oxford, MA | 3.9 GWh |
#3194 | Montague Road Solar | Amherst, MA | 3.9 GWh |
#3195 | County College of Morris | Randolph, NJ | 3.9 GWh |
#3196 | Gainey Solar, LLC | Clarkton, NC | 3.9 GWh |
#3197 | Panda Solar NC 4, LLC | Clarkton, NC | 3.9 GWh |
#3198 | Lux Solar, LLC | Kings Mountain, NC | 3.9 GWh |
#3199 | Goldenrod Solar | Pamplico, SC | 3.9 GWh |
#3200 | Laurinburg Solar, LLC (Heelstone) | Maxton, NC | 3.9 GWh |
#3201 | SV Gardner 1 (Lutz) CSG | Gardner, IL | 3.9 GWh |
#3203 | Kinston | Kinston, NC | 3.9 GWh |
#3204 | Sangerfield Solar CSG | Waterville, NY | 3.9 GWh |
#3205 | ZPD-PT Solar Project 2017-023 LLC Hybrid CSG | Southbridge, MA | 3.8 GWh |
#3206 | Frenchtown II Solar | Frenchtown, NJ | 3.9 GWh |
#3207 | Montana Solar Facility | El Paso, TX | 3.9 GWh |
#3208 | New Lisbon Solar | New Lisbon, WI | 3.9 GWh |
#3209 | Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.9 GWh |
#3210 | Wabasha Solar | Wabasha, MN | 3.9 GWh |
#3211 | Duke Building 98 | Indianapolis, IN | 3.9 GWh |
#3212 | Blacktip Solar | Scranton, SC | 3.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gunnison Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Castle Solar, LLC | Huntington, UT | 66.0 GWh | 44.9 mi |
Clover Creek Solar Community Solar | Mona, UT | 199.6 GWh | 46.7 mi |
Currant Creek | Mona, UT | 2.8 TWh | 45.5 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 59.3 mi |
Graphite Solar I | Wellington, UT | 193.0 GWh | 63.9 mi |
Hunter | Castle Dale, UT | 3.5 TWh | 41.4 mi |
Hunter Solar LLC (UT) | Clawson, UT | 270.1 GWh | 40.2 mi |
Huntington | Huntington, UT | 2.4 TWh | 41.3 mi |
Hydro Plant No 3 | east of Ephraim, UT | 2.8 GWh | 25.1 mi |
Intermountain Power Project | Delta, UT | 4.4 TWh | 47.9 mi |
Manti Lower | Manti, UT | 1.8 GWh | 11.4 mi |
Manti Upper | Manti, UT | 58.0 MWh | 11.4 mi |
Nebo Power Station | Payson, UT | 825.0 GWh | 61.9 mi |
Pavant Solar II LLC | Fillmore, UT | 102.4 GWh | 29 mi |
Pavant Solar III | Filmore, UT | 40.8 GWh | 30 mi |
Pavant Solar, LLC | Fillmore, UT | 110.8 GWh | 33.4 mi |
Payson | Payson, UT | 5.0 MWh | 61.8 mi |
Sigurd Solar LLC | Sigurd, UT | 204.5 GWh | 24.5 mi |
Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 42.0 GWh | 63.5 mi |
Unit 4 | Mt Pleasent, UT | 3.2 GWh | 33.1 mi |