Gulf Clean Energy Center
11999 Pate Street, Pensacola, FL 32514Plant Summary Information
Gulf Clean Energy Center is ranked #26 out of 279 power plants in Florida in terms of total annual net electricity generation.
Gulf Clean Energy Center is comprised of 8 generators and generated 995.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Gulf Clean Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Escambia County, FL |
Initial Operation Date | July 1959 |
Last Update | Aug 2024 |
Annual Generation | 2.7 TWh |
Annual Consumption | 36.4 M MMBtu |
Ranked #428 out of 11,835 Power Plants Nationwide | |
Ranked #258 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #26 out of 279 Florida Power Plants | |
Ranked #23 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Gulf Power Co (2013 to 2021) Florida Power & Light Co (2022 to 2023) |
Map of Gulf Clean Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gulf Clean Energy Center.
Monthly Net Generation for Gulf Clean Energy Center
Gulf Clean Energy Center Details
Summary Information | |
---|---|
Plant Name | Gulf Clean Energy Center (641) |
Plant Address | 11999 Pate Street, Pensacola, FL 32514 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 30.5661, -87.2244 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | July 1959 |
Annual Generation | 2.7 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Escambia River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | GULF SOUTH PIPELINE COMPANY LP |
Natural Gas Storage | No |
Generator 4 Details Operating July 1959
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 93.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1959 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating June 1961
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 93.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1961 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating May 1970
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 369.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 299 MW |
Winter Capacity | 299 MW |
Minimum Load | 220 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1970 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating August 1973
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 578 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 475 MW |
Winter Capacity | 475 MW |
Minimum Load | 280 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1973 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8A Details Operating December 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 243.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 236 MW |
Winter Capacity | 233 MW |
Minimum Load | 94 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 238 MW |
Net Winter Capacity With Natural Gas | 234 MW |
Net Summer Capacity With Oil | 221 MW |
Net Winter Capacity With Oil | 239 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 8B Details Operating December 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 243.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 236 MW |
Winter Capacity | 233 MW |
Minimum Load | 94 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 238 MW |
Net Winter Capacity With Natural Gas | 234 MW |
Net Summer Capacity With Oil | 221 MW |
Net Winter Capacity With Oil | 239 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 8C Details Operating December 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 243.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 231.1 MW |
Winter Capacity | 231.1 MW |
Minimum Load | 94 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 233 MW |
Net Winter Capacity With Natural Gas | 232 MW |
Net Summer Capacity With Oil | 217 MW |
Net Winter Capacity With Oil | 236 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 8D Details Operating December 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 243.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 231.1 MW |
Winter Capacity | 231.1 MW |
Minimum Load | 94 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 233 MW |
Net Winter Capacity With Natural Gas | 232 MW |
Net Summer Capacity With Oil | 217 MW |
Net Winter Capacity With Oil | 236 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Gulf Clean Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#248 | Silverhawk | North Las Vegas, NV | 2.8 TWh |
#249 | PSEG Sewaren Generating Station | Sewaren, NJ | 2.8 TWh |
#250 | Columbia Energy Center (SC) | Gaston, SC | 2.8 TWh |
#251 | Harquahala Generating Project | Tonopah, AZ | 2.7 TWh |
#252 | Rocky Mountain Energy Center | Keenesburg, CO | 2.7 TWh |
#253 | Port Westward | Clatskanie, OR | 2.7 TWh |
#254 | Emery Station | Clear Lake, IA | 2.7 TWh |
#255 | Holland Energy Facility | Beecher City, IL | 2.7 TWh |
#256 | James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh |
#257 | Kleen Energy Systems Project | Middletown, CT | 2.7 TWh |
#259 | Northeastern | Oologah, OK | 4.0 TWh |
#260 | State Line Combined Cycle | Joplin, MO | 2.7 TWh |
#261 | Red Oak Power LLC | Sayreville, NJ | 2.7 TWh |
#262 | Eastman Cogeneration Facility | Longview, TX | 2.7 TWh |
#263 | Gila River Power Block 3 | Gila Bend, AZ | 2.6 TWh |
#264 | Mankato Energy Center | Mankato, MN | 2.6 TWh |
#265 | Riverside (MN) | Minneapolis, MN | 2.6 TWh |
#266 | ANP Bellingham Energy Project | Bellingham, MA | 2.6 TWh |
#267 | Sunrise Power LLC | Fellows, CA | 2.6 TWh |
#268 | Colorado Bend Energy Center | Wharton, TX | 2.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gulf Clean Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Juniper Solar | TBD, FL | 70.6 GWh | 18.5 mi |
Blackwater River Solar Energy Center | Milton, FL | 143.0 GWh | 17.9 mi |
Canoe | Holt, FL | 106.4 GWh | 27.5 mi |
Cotton Creek Solar Energy Center | McDavid, FL | 144.3 GWh | 20.3 mi |
First City Solar Energy Center | McDavid, FL | 118.8 GWh | 25.4 mi |
Georgia-Pacific Brewton Mill | Brewton, AL | 490.5 GWh | 35.9 mi |
Gulf Coast Solar Center I | Valparaiso, FL | 56.9 GWh | 42.2 mi |
Gulf Coast Solar Center II | Navarre, FL | 79.3 GWh | 21.7 mi |
Gulf Coast Solar Center III | Bellview, FL | 84.0 GWh | 9.3 mi |
Hog Bayou Energy Center | Mobile, AL | 956.3 GWh | 51.1 mi |
International Paper Pensacola | Cantonment, FL | 336.2 GWh | 6.4 mi |
Kimberly Clark Mobile - CHP Plant | Mobile, AL | 365.5 GWh | 50.5 mi |
OE_ALD | Wing, AL | 161.1 GWh | 48.4 mi |
Pea Ridge | Pace, FL | 88.4 GWh | 5.6 mi |
Pensacola Florida Plant | Cantonment, FL | 461.9 GWh | 2.6 mi |
Perdido | Pensacola, FL | 17.4 GWh | 9.9 mi |
Santa Rosa Energy Center | Pace, FL | 1.5 TWh | 6.5 mi |
Sparkleberry | Molino, FL | 91.6 GWh | 18.4 mi |
Standby Generation Plant | Pensacola, FL | 5.0 MWh | 6.4 mi |
Theodore Cogen Facility | Theodore, AL | 1.6 TWh | 53.9 mi |