Grossmont HS Solar Project
1100 Murray Dr, El Cajon, CA 92020Plant Summary Information
Grossmont HS Solar Project is ranked #579 out of 747 solar farms in California in terms of total annual net electricity generation.
Grossmont HS Solar Project generated 615.0 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Grossmont HS Solar Project |
---|---|
Utility Name | MN8 Energy LLC |
Location | San Diego County, CA |
Initial Operation Date | December 2018 |
Last Update | Dec 2022 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.6 k MMBtu |
Ranked #9,180 out of 11,249 Power Plants Nationwide | |
Ranked #4,012 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,279 out of 1,501 California Power Plants | |
Ranked #579 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Solar Star California LXXVIII, LLC (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2022) |
Map of Grossmont HS Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grossmont HS Solar Project.
Monthly Net Generation for Grossmont HS Solar Project
Grossmont HS Solar Project Details
Summary Information | |
---|---|
Plant Name | Grossmont HS Solar Project (62987) |
Plant Address | 1100 Murray Dr El Cajon, CA 92020 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 32.81654, -116.99959 |
Generation Dates on File | Jan 2019 to Dec 2022 |
Initial Operation Date | December 2018 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 12.00 kV / 0.48 kV |
Energy Storage | No |
Generator GHSP Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 219 |
Tilt Angle | 10 |
DC Net Capacity | 1.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.5 MW |
Virtual Net Metering Agreement | No |
Grossmont HS Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4002 | Calabro Airport North Solar Project | Shirley, NY | 2.4 GWh |
#4003 | IKEA New Haven Rooftop PV & Fuel Cell | New Haven, CT | 3.9 GWh |
#4004 | BWC Pocasset River | Wareham, MA | 2.4 GWh |
#4005 | BWC Swan Pond River CSG | Rehoboth, MA | 2.4 GWh |
#4006 | DG AMP Solar Brewster | Brewster, OH | 2.4 GWh |
#4007 | US GSA - Sacramento | Sacramento, CA | 2.4 GWh |
#4008 | Chatham Landfill | Chatham, MA | 2.4 GWh |
#4009 | Tom Sifers Solar | Fraser, CO | 2.4 GWh |
#4010 | FELPS 7- Floresville West | Floresville, TX | 2.4 GWh |
#4011 | SR Kersey II | Kersey, CO | 2.4 GWh |
#4013 | Bethlehem - East | Selkirk, NY | 2.4 GWh |
#4014 | Bethlehem - West | Selkirk, NY | 2.4 GWh |
#4015 | Arba Solar, LLC | Snow Hill, NC | 2.4 GWh |
#4016 | Francisco St. Solar | Torrance, CA | 2.4 GWh |
#4017 | WED Kingstown Solar I, LLC - West | Richmond, RI | 2.4 GWh |
#4018 | Kearsarge Wilmington | Wilmington, MA | 2.4 GWh |
#4019 | AC Power | Delanco Township, NJ | 2.4 GWh |
#4020 | 435A Bergen Avenue | Kearney, NJ | 2.4 GWh |
#4021 | Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.4 GWh |
#4022 | EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grossmont HS Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AT&T - San Diego Trade Street | San Diego, CA | 6.6 GWh | 10.9 mi |
C P Kelco San Diego Plant | San Diego, CA | 111.9 GWh | 11.9 mi |
Childrens Hospital | San Diego, CA | 28.9 GWh | 8.9 mi |
County of San Diego COC Hybrid | San Diego, CA | 3.5 GWh | 7.7 mi |
Cuyamaca Peak Energy Plant | El Cajon, CA | 13.7 GWh | 2.1 mi |
Grossmont Hospital | La Mesa, CA | 31.5 GWh | 2.6 mi |
Illumina Way SD | San Diego, CA | 28.0 GWh | 12.3 mi |
Kyocera International Inc.(San Diego) | San Diego, CA | 11.6 GWh | 8.2 mi |
Miramar Energy Facility | San Diego, CA | 23.3 GWh | 10.5 mi |
MM San Diego-Miramar | San Diego, CA | 47.1 GWh | 9.7 mi |
Naval Hospital Medical Center | San Diego, CA | 20.7 GWh | 10.6 mi |
North City - Landfill Gas Engine North | San Diego, CA | 4.8 GWh | 12.3 mi |
North City - Landfill Gas Engines South | San Diego, CA | 3.1 GWh | 12.2 mi |
P Plant | San Diego, CA | 35.1 GWh | 12.7 mi |
PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.3 GWh | 4.8 mi |
San Diego Community College | San Diego, CA | 7.8 GWh | 9.8 mi |
San Diego State University | San Diego, CA | 62.4 GWh | 4.9 mi |
SDCCD - Miramar | San Diego, CA | 1.8 GWh | 9.4 mi |
Sycamore Energy LLC | Santee, CA | 22.9 GWh | 3.3 mi |
University of San Diego | San Diego, CA | 7.6 GWh | 11.6 mi |