Greenwood (MI)
7000 Kilgore, Avoca, MI 48006Plant Summary Information
Greenwood (MI) is ranked #13 out of 256 power plants in Michigan in terms of total annual net electricity generation.
Greenwood (MI) is comprised of 4 generators and generated 672.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Greenwood (MI) |
---|---|
Utility Name | DTE Electric Company |
Location | St. Clair County, MI |
Initial Operation Date | July 1979 |
Last Update | Sep 2024 |
Annual Generation | 1.5 TWh |
Annual Consumption | 17.4 M MMBtu |
Ranked #597 out of 11,852 Power Plants Nationwide | |
Ranked #376 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #13 out of 256 Michigan Power Plants | |
Ranked #8 out of 73 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Greenwood (MI)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Greenwood (MI).
Monthly Net Generation for Greenwood (MI)
Greenwood (MI) Details
Summary Information | |
---|---|
Plant Name | Greenwood (MI) (6035) |
Plant Address | 7000 Kilgore, Avoca, MI 48006 |
Utility | DTE Electric Company (5109) |
Latitude, Longitude | 43.1056, -82.6964 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | July 1979 |
Annual Generation | 1.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Transmission (56068) MI |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating July 1979
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 815.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 785 MW |
Winter Capacity | 785 MW |
Minimum Load | 155 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas / Distillate Fuel Oil / Waste/Other Oil / Residual Fuel Oil |
Startup Source | Natural Gas / Residual Fuel Oil / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / RFO |
---|---|
Switch When Operating | No |
Net Summer Capacity With Natural Gas | 785 MW |
Net Winter Capacity With Natural Gas | 785 MW |
Net Summer Capacity With Oil | 785 MW |
Net Winter Capacity With Oil | 785 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 11-1 Details Operating September 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 93 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1999 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 11-2 Details Operating September 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 93 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1999 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 11-3 Details Operating September 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 74 MW |
Winter Capacity | 92 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Greenwood (MI) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#366 | Santa Rosa Energy Center | Pace, FL | 1.5 TWh |
#367 | Crockett Cogen Project | Crockett, CA | 1.5 TWh |
#368 | Magnolia Power Project | Burbank, CA | 1.5 TWh |
#369 | Shell Chemical Appalachia LLC | Monaca, PA | 1.5 TWh |
#370 | Anclote | Holiday, FL | 1.5 TWh |
#371 | Walnut Energy Center | Turlock, CA | 1.5 TWh |
#372 | Pioneer Generation Station | Williston, ND | 1.5 TWh |
#373 | Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.5 TWh |
#374 | Emporia Energy Center | Emporia, KS | 1.5 TWh |
#375 | Effingham Energy Facility | Rincon, GA | 1.5 TWh |
#377 | Barney M Davis | Corpus Christi, TX | 1.4 TWh |
#378 | Anadarko Plant | Anadarko, OK | 1.4 TWh |
#379 | Westlake Plaquemine | Plaquemine, LA | 1.5 TWh |
#380 | Ennis Power Company LLC | Ennis, TX | 1.4 TWh |
#381 | West Deptford Energy Station | West Deptford, NJ | 1.4 TWh |
#382 | Urquhart | Beech Island, SC | 1.4 TWh |
#383 | S O Purdom | St Marks, FL | 1.4 TWh |
#384 | PPG Powerhouse C | Lake Charles, LA | 1.4 TWh |
#385 | Renaissance Power Plant | Carson City, MI | 1.4 TWh |
#386 | Rockingham County CT Station | Reidsville, NC | 1.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Greenwood (MI).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Belle River | China Twp, MI | 6.1 TWh | 25 mi |
Blue Elk VII Solar, LLC | Flint, MI | 474.0 MWh | 44 mi |
Blue Water Energy Center | East China, MI | 7.3 TWh | 25.4 mi |
Blue Water Renewables Inc | Kimball Township, MI | 24.6 GWh | 14.1 mi |
Caro | Caro, MI | 5.9 MWh | 40.4 mi |
Dean | East China, MI | 589.1 GWh | 25.3 mi |
Demille Solar Farm | Lapeer, MI | 34.6 GWh | 32.5 mi |
Eagle Valley (MI) | Orion, MI | 21.6 GWh | 39 mi |
Greenwood Solar Farm | Avoca, MI | 2.2 GWh | 0 mi |
Michigan Wind 1 | Ubly, MI | 131.9 GWh | 43.8 mi |
Michigan Wind 2 | Minden City, MI | 303.9 GWh | 38.6 mi |
Minden Wind Park | Minden City, MI | 108.5 GWh | 39.1 mi |
MSC Croswell | Croswell, MI | 24.3 MWh | 11.8 mi |
Pegasus Wind | Reese, MI | 368.1 GWh | 47.3 mi |
Pine Tree Acres | Lenox Twp, MI | 69.9 GWh | 23.7 mi |
Pine Tree Acres WM LFGTE | Lenox, MI | 89.6 GWh | 23.7 mi |
POET Biorefining Caro, LLC | Caro, MI | 15.9 GWh | 44 mi |
St Clair | East China Twp, MI | 290.0 MWh | 26.2 mi |
Turrill Solar Farm | Lapeer, MI | 25.1 GWh | 31.3 mi |
Ubly | Ubly, MI | 16.7 MWh | 44.3 mi |