Greenup Hydro
3263 Kenyon Road, Franklin Furnace, OH 45629Plant Summary Information
Greenup Hydro is ranked #42 out of 183 power plants in Ohio in terms of total annual net electricity generation.
Greenup Hydro is comprised of 3 generators and generated 89.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Greenup Hydro |
---|---|
Utility Name | City of Hamilton - (OH) |
Location | Scioto County, OH |
Initial Operation Date | December 1982 |
Last Update | Dec 2023 |
Annual Generation | 262.2 GWh |
Annual Consumption | 988.0 k MMBtu |
Ranked #1,993 out of 11,852 Power Plants Nationwide | |
Ranked #182 out of 1,371 Water Power Plants Nationwide | |
Ranked #42 out of 183 Ohio Power Plants | |
Ranked #1 out of 4 Ohio Water Power Plants | |
Fuel Types | Water |
Map of Greenup Hydro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Greenup Hydro.
Monthly Net Generation for Greenup Hydro
Greenup Hydro Details
Summary Information | |
---|---|
Plant Name | Greenup Hydro (4258) |
Plant Address | 3263 Kenyon Road, Franklin Furnace, OH 45629 |
Utility | City of Hamilton - (OH) (7977) |
Latitude, Longitude | 38.6472, -82.8594 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | December 1982 |
Annual Generation | 262.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Ohio River |
Ash Impoundment | No |
Transmission / Distribution Owner | East Kentucky Power Coop, Inc (5580) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | 112586233 |
Nameplate Capacity | 23.4 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 23.4 MW |
Winter Capacity | 23.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating December 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | 112586235 |
Nameplate Capacity | 23.4 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 23.4 MW |
Winter Capacity | 23.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating December 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | 112586237 |
Nameplate Capacity | 23.4 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 23.4 MW |
Winter Capacity | 23.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Greenup Hydro Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
City of Hamilton - (OH) | 960 N. Third Street, Hamilton, OH 45011 | Generator 1 | 51.40% |
American Mun Power-Ohio, Inc | 1111 Schrock Road, Suite 100, Columbus, OH 43229 | Generator 1 | 48.60% |
City of Hamilton - (OH) | 960 N. Third Street, Hamilton, OH 45011 | Generator 2 | 51.40% |
American Mun Power-Ohio, Inc | 1111 Schrock Road, Suite 100, Columbus, OH 43229 | Generator 2 | 48.60% |
City of Hamilton - (OH) | 960 N. Third Street, Hamilton, OH 45011 | Generator 3 | 51.40% |
American Mun Power-Ohio, Inc | 1111 Schrock Road, Suite 100, Columbus, OH 43229 | Generator 3 | 48.60% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#172 | Morrow Point | Montrose, CO | 273.9 GWh |
#173 | Belleville Dam | Belleville, WV | 272.2 GWh |
#174 | Ohio Falls | Shippingport Island, KY | 272.0 GWh |
#175 | Drum 2 | Alta, CA | 271.0 GWh |
#176 | Upper Baker | Concrete, WA | 270.8 GWh |
#177 | Moccasin | Moccasin, CA | 267.8 GWh |
#178 | Jones Bluff | Selma, AL | 267.2 GWh |
#179 | Jordan Dam | Wetumpka, AL | 263.3 GWh |
#180 | Pit 7 | Montgomery Creek, CA | 263.2 GWh |
#181 | Lower Baker | Concrete, WA | 262.8 GWh |
#183 | American Falls | American Falls, ID | 262.2 GWh |
#184 | Thomson | Carlton, MN | 258.7 GWh |
#185 | Ozark | Ozark, AR | 253.1 GWh |
#186 | Spier Falls | Gansevoort, NY | 252.9 GWh |
#187 | Exchequer | Snelling, CA | 250.6 GWh |
#188 | Jefferies | Moncks Corner, SC | 247.6 GWh |
#189 | Tiger Creek | Pioneer, CA | 246.0 GWh |
#190 | Cochrane | Great Falls, MT | 244.7 GWh |
#191 | Hudson Falls Hydroelectric Project | South Glens Falls, NY | 242.3 GWh |
#192 | Blakely Mountain | Royal, AR | 234.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Greenup Hydro.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Sandy | Louisa, KY | 1.2 TWh | 35.4 mi |
Big Sandy Peaker Plant | Kenona, WV | 325.0 GWh | 25.4 mi |
Ceredo Generating Station | Huntington, WV | 327.3 GWh | 26.1 mi |
Gavin Power, LLC | Cheshire, OH | 12.0 TWh | 44.7 mi |
Green Valley LFGTE | Ashland, KY | 16.9 GWh | 17.5 mi |
H L Spurlock | Maysville, KY | 7.8 TWh | 51.8 mi |
Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh | 6.6 mi |
Haverhill North Cogeneration Facility | Franklin Furnace, OH | 353.4 GWh | 3.9 mi |
John E Amos | St Albans, WV | 9.1 TWh | 57.3 mi |
Kyger Creek | Cheshire, OH | 4.7 TWh | 43.5 mi |
Morehead Generating Facility | Morehead, KY | 3.9 GWh | 48.7 mi |
Mountaineer | New Haven, WV | 5.6 TWh | 54.8 mi |
New Market Solar | Sardinia, OH | 66.3 GWh | 58.3 mi |
Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 207.8 GWh | 47.2 mi |
Racine | Racine, OH | 215.3 GWh | 54.5 mi |
Riverside Generating LLC | Catlettsburg, KY | 612.1 GWh | 34.4 mi |
Rolling Hills Generating | Wilkesville, OH | 2.3 TWh | 41.4 mi |
Salt City Solar Project - Hybrid | Circleville, OH | 100.1 GWh | 53.3 mi |
Willowbrook Solar I, LLC | Morystown, OH | 28.8 GWh | 52.4 mi |
Winfield | Winfield, WV | 110.5 GWh | 51.7 mi |