Green Country Energy LLC
12307 S. Florence Ave., Jenks, OK 74037Plant Summary Information
Green Country Energy LLC is ranked #5 out of 126 power plants in Oklahoma in terms of total annual net electricity generation.
Green Country Energy LLC is comprised of 6 generators and generated 1.4 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Green Country Energy LLC |
---|---|
Utility Name | Green Country OP Services LLC |
Location | Tulsa County, OK |
Initial Operation Date | February 2002 |
Last Update | Aug 2024 |
Annual Generation | 4.1 TWh |
Annual Consumption | 33.6 M MMBtu |
Ranked #270 out of 11,835 Power Plants Nationwide | |
Ranked #148 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 126 Oklahoma Power Plants | |
Ranked #5 out of 32 Oklahoma Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Green Country Energy LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green Country Energy LLC.
Monthly Net Generation for Green Country Energy LLC
Green Country Energy LLC Details
Summary Information | |
---|---|
Plant Name | Green Country Energy LLC (55146) |
Plant Address | 12307 S. Florence Ave., Jenks, OK 74037 |
Utility | Green Country OP Services LLC (7597) |
Latitude, Longitude | 35.9833, -95.9346 |
Generation Dates on File | Jan 2002 to Aug 2024 |
Initial Operation Date | February 2002 |
Annual Generation | 4.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-149-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of Oklahoma (15474) OK |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Enable Midstream Partners (Pipeline 37) ONEOK |
Natural Gas Storage | No |
Generator CTG1 Details Operating February 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G841 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 179.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 155 MW |
Winter Capacity | 167 MW |
Minimum Load | 125 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating February 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G842 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 179.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 155 MW |
Winter Capacity | 167 MW |
Minimum Load | 125 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating February 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G843 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 179.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 155 MW |
Winter Capacity | 167 MW |
Minimum Load | 125 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating February 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G841 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 106 MW |
Minimum Load | 72 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG2 Details Operating February 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G842 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 106 MW |
Minimum Load | 72 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG3 Details Operating February 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G843 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 106 MW |
Minimum Load | 72 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Green Country Energy LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#138 | Central Alabama Generating Station | Billingsley, AL | 4.3 TWh |
#139 | Astoria Energy | New York, NY | 4.3 TWh |
#140 | ExxonMobil Beaumont Refinery | Beaumont, TX | 4.4 TWh |
#141 | Astoria Energy II | Astoria, NY | 4.2 TWh |
#142 | Woodbridge Energy Center | Keasbey, NJ | 4.2 TWh |
#143 | Rowan | Salisbury, NC | 4.2 TWh |
#144 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.2 TWh |
#145 | Ratcliffe | De Kalb, MS | 4.2 TWh |
#146 | Hunterstown Power Plant | Gettysburg, PA | 4.2 TWh |
#147 | Cane Island | Intercession City, FL | 4.2 TWh |
#149 | Pastoria Energy Facility, LLC | Lebec, CA | 4.1 TWh |
#150 | Dell Power Station | Dell, AR | 4.1 TWh |
#151 | Tracy | Sparks, NV | 4.0 TWh |
#152 | L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh |
#153 | Delta Energy Center | Pittsburg, CA | 4.0 TWh |
#154 | John S Rainey | Starr, SC | 4.0 TWh |
#155 | Tenaska Frontier Generation Station | Shiro, TX | 4.0 TWh |
#156 | Hermiston Power Partnership | Hermiston, OR | 4.0 TWh |
#157 | Asheville | Arden, NC | 4.0 TWh |
#158 | Perryville Power Station | Sterlington, LA | 3.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green Country Energy LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Chouteau | Pryor, OK | 6.9 TWh | 40.2 mi |
Cushing | Cushing, OK | 575.0 MWh | 47 mi |
Eufaula Dam | Porum, OK | 216.1 GWh | 56.9 mi |
Fort Gibson | Fort Gibson, OK | 140.4 GWh | 40.4 mi |
Georgia-Pacific Muskogee | Muskogee, OK | 373.6 GWh | 39.9 mi |
GREC | Chouteau, OK | 3.4 TWh | 38.8 mi |
Keystone Dam | Sand Springs, OK | 92.8 GWh | 21.2 mi |
Markham | Locust Grove, OK | 123.5 GWh | 45.4 mi |
Muskogee | Fort Gibson, OK | 2.6 TWh | 39.4 mi |
Northeastern | Oologah, OK | 4.0 TWh | 33.6 mi |
Oneta Energy Center | Broken Arrow, OK | 5.7 TWh | 13.4 mi |
Pawhuska | Pawhuska, OK | 375.0 MWh | 52.7 mi |
Pensacola | Langley, OK | 228.0 GWh | 60 mi |
Riverside (OK) | Jenks, OK | 1.2 TWh | 1.6 mi |
Stillwater Energy Center | Stillwater, OK | 88.4 GWh | 62.8 mi |
Tenkiller Ferry | Gore, OK | 136.1 GWh | 56.3 mi |
Tulsa | Tulsa, OK | 214.3 GWh | 9.7 mi |
Tulsa LFG LLC | Sand Springs, OK | 16.7 GWh | 18.7 mi |
Webbers Falls | Webbers Falls, OK | 127.2 GWh | 52.1 mi |
Weleetka | Weleetka, OK | 7.1 GWh | 47 mi |