Green City Recovery, LLC
493 Double Culvert Road, Georgetown, KY 40324Plant Summary Information
Green City Recovery, LLC is ranked #49 out of 54 power plants in Kentucky in terms of total annual net electricity generation.
Green City Recovery, LLC is comprised of 2 generators and generated 449.2 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Green City Recovery, LLC |
---|---|
Utility Name | Green City Recovery, LLC |
Location | Scott County, KY |
Initial Operation Date | January 2016 |
Last Update | Dec 2023 |
Annual Generation | 1.7 GWh |
Annual Consumption | 17.4 k MMBtu |
Ranked #10,212 out of 11,835 Power Plants Nationwide | |
Ranked #284 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #49 out of 54 Kentucky Power Plants | |
Ranked #9 out of 9 Kentucky Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Green City Recovery, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green City Recovery, LLC.
Monthly Net Generation for Green City Recovery, LLC
Green City Recovery, LLC Details
Summary Information | |
---|---|
Plant Name | Green City Recovery, LLC (60703) |
Plant Address | 493 Double Culvert Road, Georgetown, KY 40324 |
Utility | Green City Recovery, LLC (60428) |
Latitude, Longitude | 38.34528, -84.54889 |
Generation Dates on File | Jan 2016 to Dec 2023 |
Initial Operation Date | January 2016 |
Annual Generation | 1.7 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Kentucky Utilities Co (10171) KY |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 1 Details Operating January 2016
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 2019
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Green City Recovery, LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Toyota Motor Manufacturing, Kentucky, Inc. | 1001 Cherry Blossom Way, Georgetown, KY 40324 | Generator 1 | 100.00% |
Toyota Motor Manufacturing, Kentucky, Inc. | 1001 Cherry Blossom Way, Georgetown, KY 40324 | Generator 2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#274 | Laurel Ridge LFGTE | Lily, KY | 3.4 GWh |
#275 | Beecher Gas Recovery | Beecher, IL | 3.2 GWh |
#276 | Sunnyvale City of WPCP | Sunnyvale, CA | 9.7 GWh |
#277 | Granby LFG | Granby, MA | 2.9 GWh |
#278 | St Joseph Landfill Generating Station | St Joseph, MO | 2.9 GWh |
#279 | Berkeley County Landfill | Moncks Corner, SC | 2.5 GWh |
#280 | Pennsauken Landfill | Pennsauken, NJ | 2.4 GWh |
#281 | Chautauqua LFGTE Facility | Jamestown, NY | 2.2 GWh |
#282 | Bristol Plant | Bristol, VA | 2.3 GWh |
#283 | Noble Hill Landfill | Willard, MO | 1.8 GWh |
#285 | Alpha Ridge LFG | Marriottsville, MD | 1.5 GWh |
#286 | North City - Landfill Gas Engines South | San Diego, CA | 1.7 GWh |
#287 | Port Charlotte Energy LLC | Punta Gorda, FL | 1.3 GWh |
#288 | SMMPA Methane Energy Facility | Mora, MN | 1.3 GWh |
#289 | GRS Arbor Hills | Northville, MI | 1.2 GWh |
#290 | Ameresco Stafford | Stafford, VA | 1.2 GWh |
#291 | Woodbine Landfill Plant | Woodbine, NJ | 809.0 MWh |
#292 | POET Biorefining - Chancellor | Chancellor, SD | 23.4 GWh |
#293 | MAS ASB Cogen Plant | Atlanta, GA | 39.2 GWh |
#294 | Cedar Hills | Maple Valley, WA | 454.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green City Recovery, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 47.8 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 36.1 mi |
Bluegrass Generating Station | LaGrange, KY | 36.5 GWh | 46.9 mi |
Cooperative Solar One | Winchester, KY | 13.1 GWh | 27.2 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 28.3 mi |
Dix Dam | Harrodsburg, KY | 44.0 GWh | 39.5 mi |
E W Brown | Harrodsburg, KY | 1.4 TWh | 39.5 mi |
East Bend | Union, KY | 2.5 TWh | 41.9 mi |
Ghent | Ghent, KY | 9.8 TWh | 38.4 mi |
H L Spurlock | Maysville, KY | 8.0 TWh | 46.5 mi |
J K Smith | Winchester, KY | 629.8 GWh | 40.1 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 44.5 mi |
LGE-KU Solar Share Facility Simpsonville | Simpsonville, KY | 1.0 MWh | 46.6 mi |
Markland | Florence, IN | 394.7 GWh | 37.5 mi |
Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh | 36.9 mi |
Mother Ann Lee | Harrodsburg, KY | 6.2 GWh | 36.9 mi |
Paris (KY) | Paris, KY | 337.1 MWh | 19.4 mi |
Pendleton County LFGTE | Butler, KY | 23.1 GWh | 28 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 35 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 35 mi |