Green Beanworks B PV
7804 E. Avenue J, Lancaster, CA 93535Plant Summary Information
Green Beanworks B PV is ranked #357 out of 747 solar farms in California in terms of total annual net electricity generation.
Green Beanworks B PV generated 1.7 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Green Beanworks B PV |
---|---|
Utility Name | AES Distributed Energy |
Location | Los Angeles County, CA |
Initial Operation Date | December 2018 |
Last Update | Dec 2022 |
Annual Generation | 6.8 GWh |
Annual Consumption | 24.7 k MMBtu |
Ranked #6,904 out of 11,249 Power Plants Nationwide | |
Ranked #2,252 out of 5,158 Solar Power Plants Nationwide | |
Ranked #967 out of 1,501 California Power Plants | |
Ranked #357 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Green Beanworks B, LLC (2016 to 2017) Sustainable Power Group, LLC (2018 to 2020) AES Distributed Energy (2021 to 2022) |
Map of Green Beanworks B PV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green Beanworks B PV.
Monthly Net Generation for Green Beanworks B PV
Green Beanworks B PV Details
Summary Information | |
---|---|
Plant Name | Green Beanworks B PV (61339) |
Plant Address | 7804 E. Avenue J Lancaster, CA 93535 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 34.68804, -117.98954 |
Generation Dates on File | Dec 2018 to Dec 2022 |
Initial Operation Date | December 2018 |
Annual Generation | 6.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-1469-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator GBWXB Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 3.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Green Beanworks B PV Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2242 | Brick Church Solar | Brunswick, NY | 6.8 GWh |
#2243 | Deerfield CSG Solar | Deerfield, MA | 6.8 GWh |
#2244 | Cafferty Hill Solar | Owego, NY | 6.8 GWh |
#2245 | RE Dillard 1 LLC | Sloughhouse, CA | 6.8 GWh |
#2246 | Stanford Campus Solar | Stanford, CA | 6.8 GWh |
#2247 | Ivanhoe Solar | Visalia, CA | 6.8 GWh |
#2248 | Soluga Farms IV | Godwin, NC | 6.8 GWh |
#2249 | IGS KSBD | Highland, CA | 6.8 GWh |
#2250 | ENGIE 2019 ProjectCo-MA1, LLC | Agawam, MA | 6.8 GWh |
#2251 | Gamble Solar | Bostic, NC | 6.8 GWh |
#2253 | Gratis Road Solar Facility | Monroe, GA | 6.8 GWh |
#2254 | New Bedford (MA) Plymouth | Plymouth, MA | 6.7 GWh |
#2255 | EMWD - San Jacinto RES BCT | San Jacinto, CA | 6.7 GWh |
#2256 | Bellisario Solar 2 | Lapeer, NY | 6.7 GWh |
#2257 | Bluewater CDEC 1 | Bluewater, NM | 6.7 GWh |
#2258 | CES Agawam Tuckahoe Solar Hybrid | Agawam, MA | 6.7 GWh |
#2259 | Chambers Road Solar | Big Flats, NY | 6.7 GWh |
#2260 | Sweet Tea Solar, LLC | New Bern, NC | 6.7 GWh |
#2261 | Kinsley II Landfill Solar System | Sewell, NJ | 6.7 GWh |
#2262 | Marmas Solar CSG | St. Cloud, MN | 6.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green Beanworks B PV.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arrache 4006 | Palmdale, CA | 2.3 GWh | 4.2 mi |
Arrache 4013 | Palmdale, CA | 3.1 GWh | 4.4 mi |
Arrache 8083 | Palmdale, CA | 3.7 GWh | 4.9 mi |
AVS Lancaster 1 | Lancaster, CA | 9.8 GWh | 4.3 mi |
Green Beanworks D PV | Palmdale, CA | 7.3 GWh | 5.7 mi |
Heliocentric | Palmdale, CA | 2.1 GWh | 2.6 mi |
L-8 Solar Project | Palmdale, CA | 3.0 GWh | 2.5 mi |
Lancaster | Lancaster, CA | 9.0 GWh | 3.9 mi |
Lancaster Baptist Church | Lancaster, CA | 1.2 GWh | 4 mi |
Lancaster Solar 1 | Lancaster, CA | 3.3 GWh | 6.3 mi |
Little Rock Pham Solar | Palmdale, CA | 8.8 GWh | 6.5 mi |
Ma | Lancaster, CA | 3.1 GWh | 4.2 mi |
Morgan Lancaster 1 | Lancaster, CA | 2.5 GWh | 5.7 mi |
One Ten Partners PV | Palmdale, CA | 5.4 GWh | 5.8 mi |
SEPV 1 | Palmdale, CA | 3.4 GWh | 5.6 mi |
SEPV 18 | Palmdale, CA | 5.1 GWh | 6 mi |
SEPV Palmdale East | Palmdale, CA | 26.2 GWh | 5.9 mi |
Solar Oasis LLC | Palmdale, CA | 57.1 GWh | 5.6 mi |
US-TOPCO (Soccer Center) | Lancaster, CA | 7.7 GWh | 5.5 mi |
Vinam | Lancaster, CA | 3.4 GWh | 4.3 mi |