Graphite Solar I
1197 East Main St, Wellington, UT 84542Plant Summary Information
Graphite Solar I is ranked #27 out of 121 power plants in Utah in terms of total annual net electricity generation.
Graphite Solar I generated 36.1 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Graphite Solar I |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Carbon County, UT |
Initial Operation Date | June 2022 |
Last Update | Jan 2025 |
Annual Generation | 197.1 GWh |
Annual Consumption | 704.5 k MMBtu |
Ranked #2,373 out of 11,979 Power Plants Nationwide | |
Ranked #309 out of 5,765 Solar Power Plants Nationwide | |
Ranked #27 out of 121 Utah Power Plants | |
Ranked #14 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Map of Graphite Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Graphite Solar I.
Monthly Net Generation for Graphite Solar I
Graphite Solar I Details
Summary Information | |
---|---|
Plant Name | Graphite Solar I (64186) |
Plant Address | 1197 East Main St, Wellington, UT 84542 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 39.54844, -110.71209 |
Generation Dates on File | Jun 2022 to Jan 2025 |
Initial Operation Date | June 2022 |
Annual Generation | 197.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 394 Details Operating June 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 104 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Graphite Solar I Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#299 | Techren Solar I LLC | Boulder, NV | 200.4 GWh |
#300 | Rocket Solar, LLC | Corinne, UT | 200.3 GWh |
#301 | Desert Harvest, LLC | Desert Center, CA | 200.3 GWh |
#302 | Lamesa Solar | Lamesa, TX | 200.3 GWh |
#303 | SR Arlington II | Blakely, GA | 199.5 GWh |
#304 | Pearl River Solar Park LLC | Morton, MS | 198.6 GWh |
#305 | Badger Hollow II | Cobb, WI | 198.4 GWh |
#306 | Oak Solar | Gaston, NC | 198.2 GWh |
#307 | BPL Crown Solar LLC | Chilton, TX | 197.9 GWh |
#308 | Pioneer Solar (CO), LLC | Bennett, CO | 197.3 GWh |
#310 | OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh |
#311 | Coniglio Solar | Wolfe City, TX | 196.7 GWh |
#312 | Lapetus | Andrews, TX | 196.4 GWh |
#313 | Solverde 1 | Lancaster, CA | 195.0 GWh |
#314 | Arche Energy Project, LLC | Fulton, OH | 193.9 GWh |
#315 | BPL Sol Solar LLC | Chilton, TX | 193.8 GWh |
#316 | Red Mesa Solar Project | Red Mesa, UT | 192.8 GWh |
#317 | Robins Air Force Base Solar | Macon, GA | 192.5 GWh |
#318 | Bell Ridge Solar | Trenton, FL | 191.8 GWh |
#319 | North Star Solar Project | North Branch, MN | 190.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Graphite Solar I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bartholomew | Springville, UT | 1.7 GWh | 59.8 mi |
BYU Central Heating Plant | Provo, UT | 110.5 GWh | 69.2 mi |
Castle Solar, LLC | Huntington, UT | 92.5 GWh | 21 mi |
Clover Creek Solar Community Solar | Mona, UT | 201.5 GWh | 65.7 mi |
Currant Creek | Mona, UT | 2.8 TWh | 65.6 mi |
Gunnison Solar | Gunnison, UT | 3.9 GWh | 63.9 mi |
Hunter | Castle Dale, UT | 4.4 TWh | 30.9 mi |
Hunter Solar LLC (UT) | Clawson, UT | 270.8 GWh | 33.4 mi |
Huntington | Huntington, UT | 2.8 TWh | 22.8 mi |
Hydro Plant No 3 | east of Ephraim, UT | 2.8 GWh | 40.8 mi |
Manti Lower | Manti, UT | 1.8 GWh | 52.6 mi |
Manti Upper | Manti, UT | 58.0 MWh | 52.6 mi |
Nebo Power Station | Payson, UT | 812.3 GWh | 64.6 mi |
Payson | Payson, UT | 5.0 MWh | 64.6 mi |
Spanish Fork | Spanish Fork, UT | 11.5 GWh | 59.9 mi |
Spanish Fork Community Solar | Spanish Fork, UT | 7.2 GWh | 63.2 mi |
Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 45.2 GWh | 58.6 mi |
Sunnyside Cogen Associates | Sunnyside, UT | 336.3 GWh | 17.1 mi |
Unit 4 | Mt Pleasent, UT | 3.2 GWh | 37.6 mi |
Whitehead | Springville, UT | 9.5 GWh | 65.1 mi |