Granite Peak Solar Plant
900 East 300 North, Milford, UT 84751Plant Summary Information
Granite Peak Solar Plant is ranked #41 out of 51 solar farms in Utah in terms of total annual net electricity generation.
Granite Peak Solar Plant generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Granite Peak Solar Plant |
---|---|
Utility Name | Evergreen Wind, LLC |
Location | Beaver County, UT |
Initial Operation Date | August 2015 |
Last Update | Dec 2023 |
Annual Generation | 6.1 GWh |
Annual Consumption | 21.5 k MMBtu |
Ranked #7,251 out of 11,852 Power Plants Nationwide | |
Ranked #2,513 out of 5,655 Solar Power Plants Nationwide | |
Ranked #92 out of 121 Utah Power Plants | |
Ranked #41 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Wind O&M, LLC (2013 to 2019) Evergreen Wind, LLC (2020 to 2023) |
Map of Granite Peak Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Granite Peak Solar Plant.
Monthly Net Generation for Granite Peak Solar Plant
Granite Peak Solar Plant Details
Summary Information | |
---|---|
Plant Name | Granite Peak Solar Plant (58604) |
Plant Address | 900 East 300 North, Milford, UT 84751 |
Utility | Evergreen Wind, LLC (59155) |
Latitude, Longitude | 38.40278, -112.98889 |
Generation Dates on File | Aug 2015 to Dec 2023 |
Initial Operation Date | August 2015 |
Annual Generation | 6.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-799-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator GPSP1 Details Operating August 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Granite Peak Solar Plant Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2503 | Milford Flat Solar Plant | Milford, UT | 6.1 GWh |
#2504 | Fitchburg Renewables | Fitchburg, MA | 6.1 GWh |
#2505 | TWE New Bern Solar Project, LLC | New Bern, NC | 6.1 GWh |
#2506 | Brush Solar Center | Unity, OR | 6.1 GWh |
#2507 | West Riverside Energy Center | Beloit, WI | 4.8 TWh |
#2508 | Chambers Road Solar | Big Flats, NY | 6.1 GWh |
#2509 | Ransomville Solar 1, LLC | Ransomville, NY | 6.1 GWh |
#2510 | Segunda II (CSG) | Streator, IL | 6.1 GWh |
#2511 | Dresser Hill CSG | Southbridge, MA | 6.1 GWh |
#2512 | Shasta Solar Farm | Fall River Mills, CA | 6.1 GWh |
#2514 | Telegraph Rd #1 Community Solar Farm | Pike, NY | 6.1 GWh |
#2515 | DG Dighton LLC CSG | Dighton, MA | 6.0 GWh |
#2516 | Amherst Community Solar | Amherst, NY | 6.0 GWh |
#2517 | Hayhurst New Mexico Solar | Malaga, NM | 6.0 GWh |
#2518 | Richmond NMCA | Wood River Junction, RI | 6.0 GWh |
#2519 | Sunset Reservoir North Basin | San Francisco, CA | 6.0 GWh |
#2520 | Wright Cuddyer CSG | St. Michael, MN | 6.0 GWh |
#2521 | Anderson 5 | Anderson, IN | 6.0 GWh |
#2522 | Wheatland 2A Solar | Scottsville, NY | 6.0 GWh |
#2523 | Cuba 2.5ac, LLC | Cuba, NM | 6.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Granite Peak Solar Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 132.2 GWh | 39.7 mi |
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 23 mi |
Blundell | Milford, UT | 248.2 GWh | 9.4 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 29.7 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 24.6 mi |
Escalante Solar I, LLC | Milford, UT | 212.8 GWh | 8.7 mi |
Escalante Solar II, LLC | Milford, UT | 213.5 GWh | 7.1 mi |
Escalante Solar III, LLC | Milford, UT | 210.4 GWh | 6.6 mi |
Greenville Solar Plant | Milford, UT | 4.3 GWh | 17.1 mi |
Laho Solar Plant | Milford, UT | 6.1 GWh | 8.1 mi |
Milford 2 | Milford, UT | 6.5 GWh | 1 mi |
Milford Flat Solar Plant | Milford, UT | 6.1 GWh | 7.8 mi |
Milford Solar 1 | Milford, UT | 257.2 GWh | 6.3 mi |
Milford Wind Corridor I LLC | Milford, UT | 337.9 GWh | 9.6 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 158.5 GWh | 13 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 13.8 mi |
South Milford Solar Plant | Milford, UT | 7.1 GWh | 7.2 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 20.1 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 29.1 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 36.2 mi |