Granite Mountain Solar East, LLC
4353 North Shooting Range Road, Cedar City, UT 84721Plant Summary Information
Granite Mountain Solar East, LLC is ranked #21 out of 121 power plants in Utah in terms of total annual net electricity generation.
Granite Mountain Solar East, LLC generated 71.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Granite Mountain Solar East, LLC |
---|---|
Utility Name | Clearway Renewable Operation & Maintenance LLC |
Location | Iron County, UT |
Initial Operation Date | September 2016 |
Last Update | Aug 2024 |
Annual Generation | 211.2 GWh |
Annual Consumption | 782.8 k MMBtu |
Ranked #2,239 out of 11,835 Power Plants Nationwide | |
Ranked #250 out of 5,643 Solar Power Plants Nationwide | |
Ranked #21 out of 121 Utah Power Plants | |
Ranked #8 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Granite Mountain Solar East LLC (2014 to 2014) Dominion Renewable Energy (2015 to 2020) Clearway Renewable Operation & Maintenance LLC (2021 to 2023) |
Map of Granite Mountain Solar East, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Granite Mountain Solar East, LLC.
Monthly Net Generation for Granite Mountain Solar East, LLC
Granite Mountain Solar East, LLC Details
Summary Information | |
---|---|
Plant Name | Granite Mountain Solar East, LLC (59946) |
Plant Address | 4353 North Shooting Range Road, Cedar City, UT 84721 |
Utility | Clearway Renewable Operation & Maintenance LLC (64629) |
Latitude, Longitude | 37.77509, -113.2264 |
Generation Dates on File | Aug 2016 to Aug 2024 |
Initial Operation Date | September 2016 |
Annual Generation | 211.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 15-954-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GMSE Details Operating September 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 101.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Granite Mountain Solar East, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#240 | Wapello Solar LLC | Wapello, IA | 219.2 GWh |
#241 | Black Bear Solar 1 | Montgomery, AL | 218.6 GWh |
#242 | Albemarle Beach Solar | Roper, NC | 217.5 GWh |
#243 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#244 | Iron Springs Solar, LLC | Cedar City, UT | 214.0 GWh |
#245 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#246 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#247 | Escalante Solar II, LLC | Milford, UT | 212.9 GWh |
#248 | Assembly Solar II LLC | Lennon, MI | 212.7 GWh |
#249 | Escalante Solar I, LLC | Milford, UT | 212.6 GWh |
#251 | Chicot Solar | Lake Village, AR | 210.7 GWh |
#252 | Escalante Solar III, LLC | Milford, UT | 209.7 GWh |
#253 | Cutlass Solar 1 LLC | Richmond, TX | 209.1 GWh |
#254 | River Ferry Solar 1 | West Union, IL | 208.6 GWh |
#255 | Searcy Solar Hybrid | Searcy, AR | 208.2 GWh |
#256 | Sigurd Solar LLC | Sigurd, UT | 207.6 GWh |
#257 | Taylor County Solar | Butler, GA | 206.7 GWh |
#258 | Galloway 2 Solar Farm | Paint Rock, TX | 206.0 GWh |
#259 | Hecate Energy Highland LLC | Buford, OH | 204.2 GWh |
#260 | Wagyu | Damon, TX | 202.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Granite Mountain Solar East, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 122.6 GWh | 6.7 mi |
Beryl Solar Plant | Beryl, UT | 6.1 GWh | 24.8 mi |
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 27.8 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 32 mi |
Cedar Valley Solar Plant | Cedar City, UT | 5.9 GWh | 7.8 mi |
Cove Mountain Solar | Beryl, UT | 156.5 GWh | 23.9 mi |
Cove Mountain Solar 2 | Beryl, UT | 317.3 GWh | 24.4 mi |
Enterprise Solar, LLC | Newcastle, UT | 230.1 GWh | 23 mi |
Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh | 2.3 mi |
Fiddler's Canyon #2 | Cedar City, UT | 6.9 GWh | 3.4 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.3 GWh | 3.1 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 127.8 GWh | 5.5 mi |
Iron Springs Solar, LLC | Cedar City, UT | 214.0 GWh | 5.5 mi |
Quichapa 1 | Cedar City, UT | 7.6 GWh | 8.1 mi |
Quichapa 2 | Cedar City, UT | 7.4 GWh | 7.8 mi |
Quichapa 3 | Cedar City, UT | 7.5 GWh | 8.7 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 31.7 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 26.7 mi |
Three Peaks Power | Cedar City, UT | 186.9 GWh | 6.1 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 19.1 mi |