Grand Meadow
228 Industrial Park, Dexter, MN 55926Plant Summary Information
Grand Meadow is ranked #39 out of 695 power plants in Minnesota in terms of total annual net electricity generation.
Grand Meadow generated 101.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Grand Meadow |
---|---|
Utility Name | Northern States Power Co - Minnesota |
Location | Mower County, MN |
Initial Operation Date | December 2008 |
Last Update | Dec 2022 |
Annual Generation | 309.4 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,862 out of 11,249 Power Plants Nationwide | |
Ranked #584 out of 1,329 Wind Power Plants Nationwide | |
Ranked #39 out of 695 Minnesota Power Plants | |
Ranked #24 out of 122 Minnesota Wind Power Plants | |
Fuel Types | Wind |
Map of Grand Meadow
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grand Meadow.
Monthly Net Generation for Grand Meadow
Grand Meadow Details
Summary Information | |
---|---|
Plant Name | Grand Meadow (56994) |
Plant Address | 228 Industrial Park Dexter, MN 55926 |
Utility | Northern States Power Co - Minnesota (13781) |
Latitude, Longitude | 43.7189, -92.705 |
Generation Dates on File | Jan 2009 to Dec 2022 |
Initial Operation Date | December 2008 |
Annual Generation | 309.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Great River Energy (7570) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator WND67 Details Operating December 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP GDMNSP GDMEADOW_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP GDMNSP GDMEADOW_UNIT |
Nameplate Capacity | 100.5 MW |
Summer Capacity | 100.5 MW |
Winter Capacity | 100.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 67 |
Turbine Details | |
Number Of Turbines | 67 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Grand Meadow Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#574 | Spring Valley Wind Project | Ely, NV | 316.5 GWh |
#575 | Buffalo Gap 3 Wind Farm | Nolan, TX | 315.8 GWh |
#576 | MinnDakota Wind LLC | Ivanhoe, MN | 315.5 GWh |
#577 | Meadow Creek Project Company | Idaho Falls, ID | 313.8 GWh |
#578 | Majestic II Wind | Panhandle, TX | 313.7 GWh |
#579 | Gratiot County Wind LLC | Breckenridge, MI | 313.5 GWh |
#580 | Kossuth County Wind | Lu Verne, IA | 312.5 GWh |
#581 | Blackstone Wind Farm LLC | Ransom, IL | 312.0 GWh |
#582 | Pinyon Pine I | Mojave, CA | 310.5 GWh |
#583 | Northwest Ohio Wind | Haviland, OH | 312.3 GWh |
#585 | Farmers City Wind LLC | Tarkio, MO | 306.2 GWh |
#586 | Meadow Lake Wind Farm III LLC | Lafayette, IN | 305.5 GWh |
#587 | Shiloh IV Wind Project LLC | Birds Landing, CA | 303.3 GWh |
#588 | Kibby Wind Facility | Chain of Ponds, ME | 301.9 GWh |
#589 | Tatanka Wind Power LLC | Ashley, ND | 300.8 GWh |
#590 | Lone Tree Wind, LLC | Tiskilwa, IL | 300.6 GWh |
#591 | Twin Buttes II Wind | Lamar, CO | 300.5 GWh |
#592 | Black Oak Wind Farm | Sauk Centre, MN | 299.9 GWh |
#593 | Campbell Hill Windpower | Glenrock, WY | 299.7 GWh |
#594 | Mustang Hills LLC | Mojave, CA | 297.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grand Meadow.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Wind Farm | Adams, MN | 46.4 GWh | 11.4 mi |
Blooming Prairie | Blooming Prairie, MN | 178.0 MWh | 20 mi |
Dodge Holdco Solar CSG | Kasson, MN | 6.2 GWh | 21.1 mi |
G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 117.7 GWh | 19.4 mi |
Hayfield Solar I LLC CSG | Hayfield, MN | 1.7 GWh | 14.6 mi |
Hayfield Solar III LLC CSG | Hayfield, MN | 1.9 GWh | 15.9 mi |
Hwy 14 Holdco Solar CSG | Byron, MN | 7.4 GWh | 21.7 mi |
Lange Solar | Byron, MN | 2.0 GWh | 21.6 mi |
Mower County Wind Energy Center | Grand Meadow, MN | 356.7 GWh | 9 mi |
Novel Byron Solar CSG | Byron, MN | 1.8 GWh | 20.6 mi |
Novel DeCook Solar CSG | Byron, MN | 1.9 GWh | 20.7 mi |
Novel Schmoll Farms Solar CSG | Dodge Center, MN | 1.9 GWh | 19 mi |
Pioneer Prairie Wind Farm | McIntire, IA | 847.3 GWh | 16.9 mi |
Pleasant Valley (MN) | Dexter, MN | 126.6 GWh | 5.7 mi |
Pleasant Valley Wind Farm | Dexter, MN | 946.8 GWh | 6.8 mi |
Prairie Star Wind Farm | Grand Meadow, MN | 367.6 GWh | 4.5 mi |
Spring Valley | Spring Valley, MN | 269.9 MWh | 15.9 mi |
Turtle Creek Wind Farm LLC | St. Ansgar, IA | 716.0 GWh | 21.1 mi |
Tweite Community Solar LLC | Byron, MN | 2.0 GWh | 21.2 mi |
Wapsipinicon Wind Project | Dexter, MN | 355.0 GWh | 5.8 mi |