Grand Meadow

228 Industrial Park, Dexter, MN 55926

Plant Summary Information

Grand Meadow is ranked #32 out of 739 power plants in Minnesota in terms of total annual net electricity generation.

Grand Meadow generated 92.9 GWh during the 3-month period between September 2023 to December 2023.

Plant NameGrand Meadow
Utility NameNorthern States Power Co - Minnesota
LocationMower County, MN
Initial Operation DateDecember 2008
Last Update Dec 2023
Annual Generation 325.9 GWh
Annual Consumption 1.2 M MMBtu
Ranked #1,791 out of 11,979 Power Plants Nationwide
Ranked #541 out of 1,359 Wind Power Plants Nationwide
Ranked #32 out of 739 Minnesota Power Plants
Ranked #18 out of 125 Minnesota Wind Power Plants
Fuel Types Wind

Map of Grand Meadow

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grand Meadow.

Create Your Account Today

Monthly Net Generation for Grand Meadow

50k50k40k40k30k30k20k20k10k10k00200920092010201020112011201220122013201320142014201520152016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Grand Meadow Details

Summary Information
Plant NameGrand Meadow (56994)
Plant Address228 Industrial Park, Dexter, MN 55926
UtilityNorthern States Power Co - Minnesota (13781)
Latitude, Longitude43.7189, -92.705
Generation Dates on FileJan 2009 to Dec 2023
Initial Operation DateDecember 2008
Annual Generation 325.9 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerGreat River Energy (7570)
Grid Voltage 161.00 kV
Energy StorageNo

Generator WND67 Details Operating December 2008

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationNSP GDMNSP GDMEADOW_UNIT
RTO ISO Location Designation For Reporting Wholesale Sales DataNSP GDMNSP GDMEADOW_UNIT
Nameplate Capacity100.5 MW
Summer Capacity100.5 MW
Winter Capacity100.5 MW
Minimum Load1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2008
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys67
Turbine Details
Number Of Turbines67
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed18 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet262

Grand Meadow Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#531Midland WindKewane, IL330.1 GWh
#532Tuolumne Wind ProjectGoldendale, WA329.8 GWh
#533Loraine Windpark Project LLCLoraine, TX329.5 GWh
#534Vansycle II Wind Energy CenterAthena, OR329.2 GWh
#535Reloj del Sol Wind FarmSan Ygnacio, TX328.8 GWh
#536Prairie Winds ND1Minot, ND328.2 GWh
#537Benton County Wind FarmEarl Park, IN327.5 GWh
#538Tatanka Wind Power LLCAshley, ND327.2 GWh
#539Palmas Wind, LLCRio Hondo, TX326.4 GWh
#540Lakefield Wind Project LLCLakefield, MN326.1 GWh
#542Baffin WindSarita, TX323.5 GWh
#543Deerfield Wind Energy 2Port Hope, MI323.5 GWh
#544Cloud County Wind FarmConcordia, KS323.1 GWh
#545Rosewater Wind FarmChalmers, IN322.6 GWh
#546Los Vientos Wind 1ASebastian, TX322.4 GWh
#547Macksburg Wind ProjectMacksburg, IA322.3 GWh
#548Settlers Trail Wind Farm LLCSheldon, IL321.4 GWh
#549Crossroads Wind FarmCanton, OK319.0 GWh
#550Campbell County Wind FarmPollock, SD318.8 GWh
#551Shady Oaks Wind FarmCompton, IL318.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Grand Meadow.

Plant NamePlant LocationAnnual GenerationDistance
Adams Wind FarmAdams, MN29.3 GWh11.4 mi
Blooming PrairieBlooming Prairie, MN167.0 MWh20 mi
Dodge Holdco Solar CSGKasson, MN6.5 GWh21.1 mi
Fillmore County Solar ProjectSpring Valley, MN5.8 GWh20.9 mi
G McNeilus Wind Farm Dodge CenterDodge Center, MN83.1 GWh19.4 mi
Hayfield Solar I LLC CSGHayfield, MN1.8 GWh14.6 mi
Hayfield Solar III LLC CSGHayfield, MN2.1 GWh15.9 mi
Louise SolarTaopi, MN6.8 GWh10.9 mi
Mower County Wind Energy CenterGrand Meadow, MN316.0 GWh9 mi
Novel Byron Solar CSGByron, MN1.8 GWh20.6 mi
Novel DeCook Solar CSGByron, MN1.9 GWh20.7 mi
Novel Schmoll Farms Solar CSGDodge Center, MN2.1 GWh19 mi
Pioneer Prairie Wind FarmMcIntire, IA904.7 GWh16.9 mi
Pleasant Valley (MN)Dexter, MN104.1 GWh5.7 mi
Pleasant Valley Wind FarmDexter, MN746.8 GWh6.8 mi
Prairie Star Wind FarmGrand Meadow, MN259.1 GWh4.5 mi
Spring ValleySpring Valley, MN149.0 MWh15.9 mi
Turtle Creek Wind Farm LLCSt. Ansgar, IA765.9 GWh21.1 mi
Tweite Community Solar LLCByron, MN2.1 GWh21.2 mi
Wapsipinicon Wind ProjectDexter, MN217.0 GWh5.8 mi