Grand Meadow
228 Industrial Park, Dexter, MN 55926Plant Summary Information
Grand Meadow is ranked #32 out of 736 power plants in Minnesota in terms of total annual net electricity generation.
Grand Meadow generated 92.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Grand Meadow |
---|---|
Utility Name | Northern States Power Co - Minnesota |
Location | Mower County, MN |
Initial Operation Date | December 2008 |
Last Update | Dec 2023 |
Annual Generation | 325.9 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,755 out of 11,852 Power Plants Nationwide | |
Ranked #524 out of 1,345 Wind Power Plants Nationwide | |
Ranked #32 out of 736 Minnesota Power Plants | |
Ranked #18 out of 125 Minnesota Wind Power Plants | |
Fuel Types | Wind |
Map of Grand Meadow
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grand Meadow.
Monthly Net Generation for Grand Meadow
Grand Meadow Details
Summary Information | |
---|---|
Plant Name | Grand Meadow (56994) |
Plant Address | 228 Industrial Park, Dexter, MN 55926 |
Utility | Northern States Power Co - Minnesota (13781) |
Latitude, Longitude | 43.7189, -92.705 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | December 2008 |
Annual Generation | 325.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Great River Energy (7570) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator WND67 Details Operating December 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP GDMNSP GDMEADOW_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP GDMNSP GDMEADOW_UNIT |
Nameplate Capacity | 100.5 MW |
Summer Capacity | 100.5 MW |
Winter Capacity | 100.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 67 |
Turbine Details | |
Number Of Turbines | 67 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Grand Meadow Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#514 | Hoopeston Wind LLC | Rossville, IL | 334.1 GWh |
#515 | Rugby Wind Power Project | Barton, ND | 333.2 GWh |
#516 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 331.4 GWh |
#517 | Tuolumne Wind Project | Goldendale, WA | 329.8 GWh |
#518 | Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh |
#519 | Stoneray Power Partners, LLC | Woodstock, MN | 329.4 GWh |
#520 | Vansycle II Wind Energy Center | Athena, OR | 329.2 GWh |
#521 | Prairie Winds ND1 | Minot, ND | 328.2 GWh |
#522 | Benton County Wind Farm | Earl Park, IN | 327.5 GWh |
#523 | Palmas Wind, LLC | Rio Hondo, TX | 326.0 GWh |
#525 | Baffin Wind | Sarita, TX | 323.5 GWh |
#526 | Penascal Wind Power LLC | Sarita, TX | 323.2 GWh |
#527 | Duran Mesa LLC | Duran, NM | 323.1 GWh |
#528 | Macksburg Wind Project | Macksburg, IA | 322.3 GWh |
#529 | Settlers Trail Wind Farm LLC | Sheldon, IL | 321.4 GWh |
#530 | Black Rock Wind | Elk Garden, WV | 319.8 GWh |
#531 | Campbell County Wind Farm | Pollock, SD | 318.8 GWh |
#532 | Shady Oaks Wind Farm | Compton, IL | 318.8 GWh |
#533 | Goshen Phase II | Idaho Falls, ID | 316.8 GWh |
#534 | Bennington Wind | Minonk, IL | 316.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grand Meadow.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Wind Farm | Adams, MN | 29.3 GWh | 11.4 mi |
Blooming Prairie | Blooming Prairie, MN | 167.0 MWh | 20 mi |
Dodge Holdco Solar CSG | Kasson, MN | 6.5 GWh | 21.1 mi |
G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 83.1 GWh | 19.4 mi |
Hayfield Solar I LLC CSG | Hayfield, MN | 1.8 GWh | 14.6 mi |
Hayfield Solar III LLC CSG | Hayfield, MN | 2.1 GWh | 15.9 mi |
Hwy 14 Holdco Solar CSG | Byron, MN | 7.1 GWh | 21.7 mi |
Lange Solar | Byron, MN | 1.4 GWh | 21.6 mi |
Mower County Wind Energy Center | Grand Meadow, MN | 316.0 GWh | 9 mi |
Novel Byron Solar CSG | Byron, MN | 1.8 GWh | 20.6 mi |
Novel DeCook Solar CSG | Byron, MN | 1.9 GWh | 20.7 mi |
Novel Schmoll Farms Solar CSG | Dodge Center, MN | 2.1 GWh | 19 mi |
Pioneer Prairie Wind Farm | McIntire, IA | 834.2 GWh | 16.9 mi |
Pleasant Valley (MN) | Dexter, MN | 104.1 GWh | 5.7 mi |
Pleasant Valley Wind Farm | Dexter, MN | 746.8 GWh | 6.8 mi |
Prairie Star Wind Farm | Grand Meadow, MN | 259.1 GWh | 4.5 mi |
Spring Valley | Spring Valley, MN | 149.0 MWh | 15.9 mi |
Turtle Creek Wind Farm LLC | St. Ansgar, IA | 710.0 GWh | 21.1 mi |
Tweite Community Solar LLC | Byron, MN | 2.1 GWh | 21.2 mi |
Wapsipinicon Wind Project | Dexter, MN | 217.0 GWh | 5.8 mi |