Grand Coulee
n/a, Grand Coulee, WA 99133Plant Summary Information
Grand Coulee is ranked #35 out of 11,852 power plants nationwide in terms of total annual net electricity generation.
Grand Coulee is comprised of 33 generators and generated 4.1 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Grand Coulee |
---|---|
Utility Name | U S Bureau of Reclamation |
Location | Grant County, WA |
Initial Operation Date | March 1941 |
Last Update | Sep 2024 |
Annual Generation | 15.0 TWh |
Annual Consumption | 53.9 M MMBtu |
Ranked #35 out of 11,852 Power Plants Nationwide | |
Ranked #2 out of 1,371 Water Power Plants Nationwide | |
Ranked #1 out of 134 Washington Power Plants | |
Ranked #1 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Grand Coulee
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grand Coulee.
Monthly Net Generation for Grand Coulee
Grand Coulee Details
Summary Information | |
---|---|
Plant Name | Grand Coulee (6163) |
Plant Address | , Grand Coulee, WA 99133 |
Utility | U S Bureau of Reclamation (2518) |
Latitude, Longitude | 47.95751, -118.97732 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | March 1941 |
Annual Generation | 15.0 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 525.00 kV |
Energy Storage | Yes |
Generator LS1 Details Operating March 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1941 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator LS2 Details Operating March 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1941 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating September 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1941 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating January 1942
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1942 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 1 Details Operating April 1942
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1942 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating November 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1943 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 8 Details Operating February 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 1943 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 6 Details Operating August 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1943 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating February 1944
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 1944 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 7 Details Operating October 1947
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1947 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 9 Details Operating April 1948
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1948 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 18 Details Operating May 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1949 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 17 Details Operating July 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1949 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 16 Details Operating September 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1949 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 13 Details Operating October 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 15 Details Operating April 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 14 Details Operating July 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator LS3 Details Operating January 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 12 Details Operating April 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 11 Details Operating June 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 10 Details Operating September 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator PG7 Details Operating October 1973
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator PG8 Details Operating November 1973
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 19 Details Operating September 1975
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 600 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 690 MW |
Winter Capacity | 690 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 21 Details Operating December 1976
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 600 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 690 MW |
Winter Capacity | 690 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1976 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 20 Details Operating April 1976
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 600 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 690 MW |
Winter Capacity | 690 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1976 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 22 Details Operating May 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 805 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 805 MW |
Winter Capacity | 805 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 23 Details Operating November 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 805 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 805 MW |
Winter Capacity | 805 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 24 Details Operating May 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 805 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 805 MW |
Winter Capacity | 805 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator PG11 Details Operating November 1983
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 53.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator PG9 Details Operating April 1983
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 53.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator PG10 Details Operating June 1983
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 53.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator PG12 Details Operating April 1984
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 53.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Grand Coulee Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#3 | Chief Joseph | Bridgeport, WA | 9.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.8 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grand Coulee.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Nielson Solar | Lind, WA | 40.7 GWh | 71.2 mi |
Chelan | Wenatchee, WA | 305.8 GWh | 48.7 mi |
Chief Joseph | Bridgeport, WA | 9.0 TWh | 30.8 mi |
Kettle Falls Generating Station | Kettle Falls, WA | 335.1 GWh | 60.7 mi |
Little Falls (WA) | Ford, WA | 175.8 GWh | 50 mi |
Long Lake | Ford, WA | 413.0 GWh | 53.5 mi |
Main Canal Headworks | Coulee City, WA | 118.7 GWh | 27.9 mi |
Meyers Falls | Kettle Falls, WA | 9.8 GWh | 61 mi |
Monroe Street | Spokane, WA | 89.1 GWh | 75.2 mi |
Nine Mile | Nine Mile, WA | 118.3 GWh | 68 mi |
Northeast (WA) | Spokane, WA | 112.0 MWh | 76.1 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 69.8 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 68.6 mi |
Rattlesnake Flat | Ritzville, WA | 384.3 GWh | 72.8 mi |
Rock Island | Wenatchee, WA | 2.0 TWh | 66.9 mi |
Rocky Reach | Wenatchee, WA | 4.8 TWh | 67.9 mi |
Spokane Waste to Energy | Spokane, WA | 131.5 GWh | 72.1 mi |
Summer Falls Power Plant | Coulee City, WA | 447.2 GWh | 34.7 mi |
Upper Falls | Spokane, WA | 59.9 GWh | 75.3 mi |
Wells | Pateros, WA | 3.4 TWh | 41.1 mi |