GPS Cabazon Wind LLC

19020 N Indian Avenue, North Palm Springs, CA 92230

Plant Summary Information

GPS Cabazon Wind LLC is ranked #76 out of 107 wind farms in California in terms of total annual net electricity generation.

GPS Cabazon Wind LLC generated 4.0 GWh during the 3-month period between September 2022 to December 2022.

Plant NameGPS Cabazon Wind LLC
Utility NameHuntsman Wind
LocationRiverside County, CA
Initial Operation DateJanuary 1999
Last Update Dec 2022
Annual Generation 19.3 GWh
Annual Consumption 77.0 k MMBtu
Ranked #5,007 out of 11,249 Power Plants Nationwide
Ranked #1,056 out of 1,329 Wind Power Plants Nationwide
Ranked #700 out of 1,501 California Power Plants
Ranked #76 out of 107 California Wind Power Plants
Fuel Types Wind
Previous Operators FPL Energy Cabazon Wind (2013 to 2017)
GlidePath Power Operations LLC (2018 to 2020)
Huntsman Wind (2021 to 2022)

Map of GPS Cabazon Wind LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for GPS Cabazon Wind LLC.

Create Your Account Today

Monthly Net Generation for GPS Cabazon Wind LLC

GPS Cabazon Wind LLC Details

Summary Information
Plant NameGPS Cabazon Wind LLC (50552)
Plant Address19020 N Indian Avenue North Palm Springs, CA 92230
UtilityHuntsman Wind (64407)
Latitude, Longitude33.91499, -116.71026
Generation Dates on FileJan 2001 to Dec 2022
Initial Operation DateJanuary 1999
Annual Generation 19.3 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 115.00 kV
Energy StorageNo

Generator WGNS Details Operating January 1999

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity38.9 MW
Summer Capacity38.9 MW
Winter Capacity38.9 MW
Minimum Load2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1999
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys52
Multiple FuelsNo
Turbine Details
Number Of Turbines52
Predominant Turbine ManufacturerZond
Predominant Turbine Model NumberZ-48
Design Wind Speed20 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet213

GPS Cabazon Wind LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#1046EDF Renewable Windfarm V IncBirds Landing, CA21.7 GWh
#1047Minot Wind ProjectMinot, ND21.6 GWh
#1048Threemile CanyonBoardman, OR21.5 GWh
#1049Sand Ranch Windfarm LLCEcho, OR21.4 GWh
#1050Coram Energy LLCTehachapi, CA21.3 GWh
#1051Four Mile Canyon Windfarm LLCEcho, OR20.6 GWh
#1052Oregon Trail Windfarm LLCEcho, OR20.4 GWh
#1053Jersey-Atlantic Wind FarmAtlantic City, NJ20.3 GWh
#1054CiscoBrewster, MN19.6 GWh
#1055Wind TurbineCasco, WI19.5 GWh
#1057Four Corners Windfarm LLCEcho, OR19.2 GWh
#1058Orchard Windfarm 4, LLCLexington, OR19.0 GWh
#1059Lakota Ridge LLCHendricks, MN19.0 GWh
#1060Cassia WindHagerman, ID18.9 GWh
#1061Medicine BowMedicine Bow, WY18.2 GWh
#1062Orchard Windfarm 3, LLCLexington, OR18.0 GWh
#1063Fairmont WindFairmont, MN17.9 GWh
#1064Orchard Windfarm 2, LLCLexington, OR17.8 GWh
#1065Buffalo Mountain Energy CenterOliver Springs, TN17.7 GWh
#1066Jericho PowerBerlin, NH17.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding GPS Cabazon Wind LLC.

Plant NamePlant LocationAnnual GenerationDistance
Cabazon Wind PartnersCabazon, CA103.7 GWh1.4 mi
Coachella Hills WindPalm Springs, CA191.1 GWh7.5 mi
Foundation NWNACabazon, CA23.1 GWh2.2 mi
Foundation RRMCabazon, CA8.4 GWh6 mi
Garnet Wind Energy CenterNorth Palm Springs, CA12.9 GWh7.4 mi
Green Power INorth Palm Springs, CA605.4 MWh1 mi
Indigo Energy FacilityNorth Palm Springs, CA43.9 GWh9 mi
Karen Avenue Wind FarmNorth Palm Springs, CA27.1 GWh8.5 mi
Mountain View I&2North Palm Springs, CA287.8 GWh8.4 mi
Mountain View IIINorth Palm Springs, CA55.6 GWh6.8 mi
North Palm Springs 1APalm Springs, CA5.3 GWh6.7 mi
North Palm Springs 4APalm Springs, CA9.7 GWh8.5 mi
Painted Hills Wind ParkWhitewater, CA197.6 GWh5.5 mi
San Gorgonio Farms Wind FarmWhitewater, CA66.1 GWh5.5 mi
San Gorgonio Westwinds II LLCNorth Palm Springs, CA115.3 GWh7.7 mi
San Gorgonio Windplant WPP1993North Palm Springs, CA170.5 GWh7.8 mi
Sentinel Energy Center, LLCDesert Hot Springs, CA622.1 GWh8.1 mi
Wagner Wind LLCPalm Springs, CA15.0 GWh8.9 mi
Whitewater Hill Wind PartnersNorth Palm Springs, CA142.7 GWh5.3 mi
Whitewater Hydro PlantCalifornia, CA400.0 MWh4.2 mi