444 Bone Road, Idaho Falls, ID 83427Plant Summary Information
Goshen Phase II is ranked #13 out of 141 power plants in Idaho in terms of total annual net electricity generation.
Goshen Phase II generated 73.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Goshen Phase II |
---|---|
Utility Name | AE Power Services LLC |
Location | Bonneville County, ID |
Initial Operation Date | September 2010 |
Last Update | Dec 2023 |
Annual Generation | 316.8 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,786 out of 11,852 Power Plants Nationwide | |
Ranked #533 out of 1,345 Wind Power Plants Nationwide | |
Ranked #13 out of 141 Idaho Power Plants | |
Ranked #1 out of 33 Idaho Wind Power Plants | |
Fuel Types | Wind |
Map of Goshen Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Goshen Phase II.
Monthly Net Generation for Goshen Phase II
Goshen Phase II Details
Summary Information | |
---|---|
Plant Name | Goshen Phase II (57211) |
Plant Address | 444 Bone Road, Idaho Falls, ID 83427 |
Utility | AE Power Services LLC (55963) |
Latitude, Longitude | 43.46706, -111.83638 |
Generation Dates on File | Sep 2010 to Dec 2023 |
Initial Operation Date | September 2010 |
Annual Generation | 316.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG10-53 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) ID |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Jointly Owned |
Nameplate Capacity | 124.5 MW |
Summer Capacity | 124.5 MW |
Winter Capacity | 124.5 MW |
Minimum Load | 1.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 83 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 83 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5-82.5 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Goshen Phase II Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Leeward Asset Management, LLC | 6688 N. Central Expressway, Suite 500, Dallas, TX 75206 | 50.00% |
BP Wind Energy North America Inc | 201 Helios Way, Houston, TX 77079 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#523 | Palmas Wind, LLC | Rio Hondo, TX | 326.0 GWh |
#524 | Grand Meadow | Dexter, MN | 325.9 GWh |
#525 | Baffin Wind | Sarita, TX | 323.5 GWh |
#526 | Penascal Wind Power LLC | Sarita, TX | 323.2 GWh |
#527 | Duran Mesa LLC | Duran, NM | 323.1 GWh |
#528 | Macksburg Wind Project | Macksburg, IA | 322.3 GWh |
#529 | Settlers Trail Wind Farm LLC | Sheldon, IL | 321.4 GWh |
#530 | Black Rock Wind | Elk Garden, WV | 319.8 GWh |
#531 | Campbell County Wind Farm | Pollock, SD | 318.8 GWh |
#532 | Shady Oaks Wind Farm | Compton, IL | 318.8 GWh |
#534 | Bennington Wind | Minonk, IL | 316.6 GWh |
#535 | Anacacho Wind Farm, LLC | Brackettville, TX | 316.4 GWh |
#536 | Mower County Wind Energy Center | Grand Meadow, MN | 316.0 GWh |
#537 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 315.9 GWh |
#538 | Shady Oaks Wind 2 | Compton, IL | 315.8 GWh |
#539 | Oakfield Wind Project | City of Oakfield, ME | 315.4 GWh |
#540 | Glenrock | Glenrock, WY | 314.1 GWh |
#541 | Sand Bluff Wind Farm | Big Spring, TX | 313.3 GWh |
#542 | Elkhorn Valley Wind Farm | Union, OR | 312.3 GWh |
#543 | Post Wind Farm LP | Fluvanna, TX | 311.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Goshen Phase II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashton | Ashton, ID | 30.2 GWh | 45.5 mi |
Bannock County LFG to Energy | Pocatello, ID | 12.8 GWh | 54 mi |
Birch Creek Power | Terreton, ID | 9.2 GWh | 58.7 mi |
BYUI Central Energy Facility | Rexburg, ID | 39.4 GWh | 24.3 mi |
Cedar Creek Wind, LLC | Shelley, ID | 226.0 GWh | 14.7 mi |
Chester Diversion Hydroelectric Project | Chester, ID | 7.8 GWh | 40.1 mi |
City Power Plant | Idaho Falls, ID | 39.1 GWh | 10.6 mi |
Falls River Hydro | Ashton, ID | 44.2 GWh | 47.5 mi |
Felt | Felt, ID | 26.7 GWh | 41.4 mi |
Gem State | Idaho Falls, ID | 104.1 GWh | 13.7 mi |
Horse Butte Wind I, LLC | Iona, ID | 149.4 GWh | 7.8 mi |
Kettle Butte Digester, LLC | Roberts, ID | 9.2 GWh | 25 mi |
Lower No 1 | Idaho Falls, ID | 39.6 GWh | 11.3 mi |
Lower No 2 | Idaho Falls, ID | 4.5 GWh | 11.3 mi |
Meadow Creek Project Company | Idaho Falls, ID | 266.2 GWh | 4.3 mi |
Palisades Dam | Palisades, ID | 564.6 GWh | 32.9 mi |
Simplot Leasing Don Plant | Pocatello, ID | 69.6 GWh | 52 mi |
Soda | Soda Springs, ID | 16.5 GWh | 57.3 mi |
Upper Power Plant | Idaho Falls, ID | 7.0 GWh | 12.3 mi |
Wolverine Creek | Idaho Falls, ID | 134.7 GWh | 3.3 mi |