Google Moffett Park Solar Project
237 Moffett Park Dr, Sunnyvale, CA 94089Plant Summary Information
Google Moffett Park Solar Project is ranked #527 out of 747 solar farms in California in terms of total annual net electricity generation.
Google Moffett Park Solar Project generated 774.5 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Google Moffett Park Solar Project |
---|---|
Utility Name | Google, Inc. |
Location | Santa Clara County, CA |
Initial Operation Date | March 2021 |
Last Update | Dec 2022 |
Annual Generation | 3.0 GWh |
Annual Consumption | 11.2 k MMBtu |
Ranked #8,774 out of 11,249 Power Plants Nationwide | |
Ranked #3,673 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,219 out of 1,501 California Power Plants | |
Ranked #527 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Google Moffett Park Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Google Moffett Park Solar Project.
Monthly Net Generation for Google Moffett Park Solar Project
Google Moffett Park Solar Project Details
Summary Information | |
---|---|
Plant Name | Google Moffett Park Solar Project (65568) |
Plant Address | 237 Moffett Park Dr Sunnyvale, CA 94089 |
Utility | Google, Inc. (64846) |
Latitude, Longitude | 37.40531, -122.0175 |
Generation Dates on File | Mar 2021 to Dec 2022 |
Initial Operation Date | March 2021 |
Annual Generation | 3.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) CA |
Grid Voltage | 0.48 kV |
Energy Storage | Yes |
Generator GMSP1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
East West Fixed Tilt | Yes |
---|---|
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1 MW |
Virtual Net Metering Agreement | No |
Generator GMSP2 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 165 |
Tilt Angle | 3 |
DC Net Capacity | 0.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.9 MW |
Virtual Net Metering Agreement | No |
Generator GMSPB Details Operating March 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 12H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 1.1 |
---|---|
Maximum Charge Rate | 0.6 MW |
Maximum Discharge Rate | 0.6 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.8 |
Storage Enclosure Type | CS |
Excess Wind And Solar Generation | Yes |
Google Moffett Park Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3663 | Gilbert Solar Facility I, LLC | Gilbert, AZ | 3.1 GWh |
#3664 | Harmony Road Solar | Huntley, IL | 3.1 GWh |
#3665 | Hickory Grove #2 | Horseheads, NY | 3.1 GWh |
#3666 | Castor Solar | Dustin Acres, CA | 3.1 GWh |
#3667 | Medford DPC Solar | Medford, WI | 3.1 GWh |
#3668 | Citizens Agawam Landfill Solar | Agawam, MA | 3.1 GWh |
#3669 | 2081 Terzian Solar Project | Reedley, CA | 3.1 GWh |
#3670 | Lakeland Solar Energy LLC | Lakeland, GA | 3.1 GWh |
#3671 | Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 3.1 GWh |
#3672 | Colonial Pipeline Allentown Chesterfield | Chesterfield, NJ | 3.1 GWh |
#3674 | Drinkwater Solar | Saint Johnsville, NY | 3.1 GWh |
#3675 | Pima Community College - East Campus | Tucson, AZ | 3.1 GWh |
#3676 | County of Dutchess, NY (Airport) | Wappinger Falls, NY | 3.1 GWh |
#3677 | Oregon University System OIT Klamath Falls | Klamath Falls, OR | 3.1 GWh |
#3678 | CED Champaign Solar LLC | Champaign, IL | 3.1 GWh |
#3679 | Minke Solar | Molalla, OR | 3.0 GWh |
#3680 | SR Houston | Houston, MS | 3.0 GWh |
#3681 | Charlotte Solar LLC VT | Charlotte, VT | 3.0 GWh |
#3682 | Grassland 1&2 Solar Project | Davis, CA | 3.0 GWh |
#3683 | Mtn. Solar 1 | Watkins, CO | 3.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Google Moffett Park Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agnews Power Plant | San Jose, CA | 26.9 GWh | 5 mi |
APP Prune A-D | Cupertino, CA | 23.5 GWh | 5.1 mi |
Apple Campus 2 Fuel Cell | Cupertino, CA | 23.4 GWh | 5.2 mi |
AT&T Holger | San Jose, CA | 9.1 GWh | 4.1 mi |
Donald Von Raesfeld Power Plant | Santa Clara, CA | 968.3 GWh | 4.2 mi |
Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 38.0 GWh | 2 mi |
EQX011 Duane Fuel Cell | Santa Clara, CA | 30.0 GWh | 3.9 mi |
Gianera | Santa Clara, CA | 7.8 GWh | 2.7 mi |
Intel Santa Clara | Santa Clara, CA | 8.0 GWh | 3.3 mi |
JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 9.7 GWh | 0.6 mi |
Juniper Networks Sunnyvale | Sunnyvale, CA | 6.9 GWh | 0.5 mi |
Los Esteros Critical Energy Center | San Jose, CA | 194.5 GWh | 4.9 mi |
Maxim | San Jose, CA | 8.0 GWh | 3.7 mi |
Mission College Blvd. Fuel Cell | Santa Clara, CA | 37.5 GWh | 3.3 mi |
Santa Clara Cogen | Santa Clara, CA | 31.3 GWh | 4.9 mi |
SC 1 Data Center, Phase 2 | Santa Clara, CA | 132.0 MWh | 5.1 mi |
SJ/SC WPCP | San Jose, CA | 80.6 GWh | 4.4 mi |
Sunnyvale City of WPCP | Sunnyvale, CA | 9.2 GWh | 1 mi |
Yahoo! - HQ | Sunnyvale, CA | 6.7 GWh | 0.8 mi |
Zero Waste Energy Development Co LLC | San Jose, CA | 2.6 GWh | 4 mi |