Google Moffett Park Solar Project
237 Moffett Park Dr, Sunnyvale, CA 94089Plant Summary Information
Google Moffett Park Solar Project is ranked #562 out of 799 solar farms in California in terms of total annual net electricity generation.
Google Moffett Park Solar Project generated 372.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Google Moffett Park Solar Project |
---|---|
Utility Name | Google, Inc. |
Location | Santa Clara County, CA |
Initial Operation Date | March 2021 |
Last Update | Dec 2023 |
Annual Generation | 2.7 GWh |
Annual Consumption | 9.6 k MMBtu |
Ranked #9,280 out of 11,835 Power Plants Nationwide | |
Ranked #4,070 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,284 out of 1,569 California Power Plants | |
Ranked #562 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Google Moffett Park Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Google Moffett Park Solar Project.
Monthly Net Generation for Google Moffett Park Solar Project
Google Moffett Park Solar Project Details
Summary Information | |
---|---|
Plant Name | Google Moffett Park Solar Project (65568) |
Plant Address | 237 Moffett Park Dr, Sunnyvale, CA 94089 |
Utility | Google, Inc. (64846) |
Latitude, Longitude | 37.40531, -122.0175 |
Generation Dates on File | Mar 2021 to Dec 2023 |
Initial Operation Date | March 2021 |
Annual Generation | 2.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) CA |
Grid Voltage | 0.48 kV |
Energy Storage | Yes |
Generator GMSP1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | No |
---|---|
East West Fixed Tilt | Yes |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1 MW |
Virtual Net Metering Agreement | No |
Generator GMSP2 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 165 |
Tilt Angle | 3 |
DC Net Capacity | 0.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.9 MW |
Virtual Net Metering Agreement | No |
Generator GMSPB Details Operating March 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 1.1 |
---|---|
Maximum Charge Rate | 0.6 MW |
Maximum Discharge Rate | 0.6 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.8 |
Storage Enclosure Type | CS |
Excess Wind And Solar Generation | P |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65568 / 65568 |
Direct Support Gen Id | GMSP1 / GMSP2 |
Support T D Asset | No |
Google Moffett Park Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4060 | Division 1 | Lancaster, CA | 2.7 GWh |
#4061 | Deer Creek 2 | Shingle Springs, CA | 2.7 GWh |
#4062 | Onyx - Lamphear Road CSG | Rome, NY | 2.7 GWh |
#4063 | Freeman Avenue | Andersonville, GA | 2.7 GWh |
#4064 | Westminster | Westminster, VT | 2.7 GWh |
#4065 | Kettleman Solar Project | Lodi, CA | 2.7 GWh |
#4066 | West Bridgewater AB CSG | West Bridgewater, MA | 2.7 GWh |
#4067 | Onyx - Saratoga Springs Landfill Solar CSG | Saratoga Springs, NY | 2.7 GWh |
#4068 | L-8 Solar Project | Palmdale, CA | 2.7 GWh |
#4069 | Prologis L.P | Tracy, CA | 2.7 GWh |
#4071 | Fall River Solar CSG | Fall River, MA | 2.7 GWh |
#4072 | Villa Roma Rd #2 | Delaware, NY | 2.7 GWh |
#4073 | Newton Rumford Landfill | Newton, MA | 2.7 GWh |
#4074 | Town of Uxbridge MA at Commerce Dr | Uxbridge, MA | 2.7 GWh |
#4075 | Regal Ware | West Bend, WI | 2.7 GWh |
#4076 | GD West Greenwich Victory I, LLC | West Greenwich, RI | 2.7 GWh |
#4077 | Whistling Winds DPC Solar | New Lisbon, WI | 2.7 GWh |
#4078 | Barrette Outdoor Living, Inc. | Egg Harbor City, NJ | 2.7 GWh |
#4079 | Mira Loma | Mira Loma, CA | 2.7 GWh |
#4080 | MO33 CSG | Gaithersburg, MD | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Google Moffett Park Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agnews Power Plant | San Jose, CA | 35.7 GWh | 5 mi |
APP Prune A-D | Cupertino, CA | 27.1 GWh | 5.1 mi |
Apple Campus 2 PV | Cupertino, CA | 15.6 GWh | 5.2 mi |
AT&T Holger | San Jose, CA | 7.2 GWh | 4.1 mi |
Donald Von Raesfeld Power Plant | Santa Clara, CA | 869.8 GWh | 4.2 mi |
Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 35.9 GWh | 2 mi |
EQX011 Duane Fuel Cell | Santa Clara, CA | 20.6 GWh | 3.9 mi |
Gianera | Santa Clara, CA | 9.9 GWh | 2.7 mi |
Intel Santa Clara | Santa Clara, CA | 7.3 GWh | 3.3 mi |
JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 8.8 GWh | 0.6 mi |
Juniper Networks Sunnyvale | Sunnyvale, CA | 5.6 GWh | 0.5 mi |
Los Esteros Critical Energy Center | San Jose, CA | 218.4 GWh | 4.9 mi |
Maxim | San Jose, CA | 6.6 GWh | 3.7 mi |
Mission College Blvd. Fuel Cell | Santa Clara, CA | 38.2 GWh | 3.3 mi |
Santa Clara Cogen | Santa Clara, CA | 15.3 GWh | 4.9 mi |
SC 1 Data Center, Phase 2 | Santa Clara, CA | 201.0 MWh | 5.1 mi |
SJ/SC WPCP | San Jose, CA | 81.5 GWh | 4.4 mi |
Sunnyvale City of WPCP | Sunnyvale, CA | 9.7 GWh | 1 mi |
Yahoo! - HQ | Sunnyvale, CA | 4.1 GWh | 0.8 mi |
Zero Waste Energy Development Co LLC | San Jose, CA | 2.3 GWh | 4 mi |