Goodnoe Hills
1332 Hoctor Road, Goldendale, WA 98620Plant Summary Information
Goodnoe Hills is ranked #17 out of 23 wind farms in Washington in terms of total annual net electricity generation.
Goodnoe Hills generated 39.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Goodnoe Hills |
---|---|
Utility Name | PacifiCorp |
Location | Klickitat County, WA |
Initial Operation Date | June 2008 |
Last Update | Dec 2023 |
Annual Generation | 223.9 GWh |
Annual Consumption | 823.2 k MMBtu |
Ranked #2,185 out of 11,852 Power Plants Nationwide | |
Ranked #666 out of 1,345 Wind Power Plants Nationwide | |
Ranked #62 out of 134 Washington Power Plants | |
Ranked #17 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Goodnoe Hills
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Goodnoe Hills.
Monthly Net Generation for Goodnoe Hills
Goodnoe Hills Details
Summary Information | |
---|---|
Plant Name | Goodnoe Hills (56666) |
Plant Address | 1332 Hoctor Road, Goldendale, WA 98620 |
Utility | PacifiCorp (14354) |
Latitude, Longitude | 45.78183, -120.52115 |
Generation Dates on File | Jun 2008 to Dec 2023 |
Initial Operation Date | June 2008 |
Annual Generation | 223.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 103.4 MW |
Summer Capacity | 94 MW |
Winter Capacity | 94 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 47 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 47 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V110-2.0 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 285.4 |
Goodnoe Hills Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#656 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 228.9 GWh |
#657 | Wessington Springs | Wessington Springs, SD | 228.5 GWh |
#658 | Gratiot County Wind LLC | Breckenridge, MI | 228.1 GWh |
#659 | Pioneer Wind Park, LLC | Glenrock, WY | 226.3 GWh |
#660 | Cedar Creek Wind, LLC | Shelley, ID | 226.0 GWh |
#661 | Blackstone Wind Farm LLC | Ransom, IL | 225.9 GWh |
#662 | Forest Creek Wind Farm LLC | Big Springs, TX | 225.4 GWh |
#663 | San Roman Wind I, LLC | Los Fresnos, TX | 224.1 GWh |
#664 | Armenia Mountain Wind Farm | Mainesburg, PA | 224.0 GWh |
#665 | Broken Bow Wind LLC | Broken Bow, NE | 224.0 GWh |
#667 | Lake Benton I | Lake Benton, MN | 223.1 GWh |
#668 | Reloj del Sol Wind Farm | San Ygnacio, TX | 222.5 GWh |
#669 | Stony Creek Wind Farm NY | Strykersville, NY | 221.7 GWh |
#670 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 221.4 GWh |
#671 | Brookfield Tehachapi 1 | Mojave, CA | 220.4 GWh |
#672 | Prairie Hill Wind Project | Mart, TX | 219.9 GWh |
#673 | Rockland Wind Farm | American Falls, ID | 219.4 GWh |
#674 | Twin Buttes Wind Project | Lamar, CO | 219.0 GWh |
#675 | Independence Wind Farm | Manchester, IA | 218.4 GWh |
#676 | Cassadaga Wind Farm | Cherry Creek, NY | 218.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Goodnoe Hills.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 16.1 mi |
Big Horn Wind II | Bickleton, WA | 108.9 GWh | 14.1 mi |
Big Horn Wind Project | Bickelton, WA | 475.9 GWh | 13.3 mi |
Biglow Canyon Wind Farm | Wasco, OR | 949.7 GWh | 9.7 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 15.2 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 8.6 mi |
John Day | Rufus, OR | 6.9 TWh | 9.5 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 255.0 GWh | 16.8 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 15.6 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 15 mi |
Klondike Windpower III | Wasco, OR | 692.4 GWh | 13.7 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 15.5 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 12.9 mi |
Lund Hill Solar | Bickleton, WA | 349.0 GWh | 10.9 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 12.5 mi |
Tuolumne Wind Project | Goldendale, WA | 329.8 GWh | 15.3 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 12.2 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 8.9 mi |
Windy Flats Wind Project | Centerville, WA | 567.8 GWh | 15.5 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 14.1 mi |