14874 Holiday Ave, Rosamond, CA 93560Plant Summary Information
Golden Field Solar III, LLC is ranked #22 out of 801 solar farms in California in terms of total annual net electricity generation.
Golden Field Solar III, LLC generated 148.3 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Golden Field Solar III, LLC |
---|---|
Utility Name | Golden Field Solar III, LLC |
Location | Kern County, CA |
Initial Operation Date | December 2020 |
Last Update | Oct 2024 |
Annual Generation | 528.0 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,241 out of 11,866 Power Plants Nationwide | |
Ranked #55 out of 5,672 Solar Power Plants Nationwide | |
Ranked #72 out of 1,571 California Power Plants | |
Ranked #22 out of 801 California Solar Power Plants | |
Fuel Types | Solar |
Map of Golden Field Solar III, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Golden Field Solar III, LLC.
Monthly Net Generation for Golden Field Solar III, LLC
Golden Field Solar III, LLC Details
Summary Information | |
---|---|
Plant Name | Golden Field Solar III, LLC (63859) |
Plant Address | 14874 Holiday Ave, Rosamond, CA 93560 |
Utility | Golden Field Solar III, LLC (63545) |
Latitude, Longitude | 34.847, -118.395 |
Generation Dates on File | Jan 2021 to Oct 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 528.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG20-54-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator RCTR Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 192 MW |
Summer Capacity | 192 MW |
Winter Capacity | 192 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 240 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Golden Field Solar III, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#45 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 565.5 GWh |
#46 | Oberon II Solar Project | Desert Center, CA | 555.9 GWh |
#47 | AV Solar Ranch One | Lancaster, CA | 570.9 GWh |
#48 | Eiffel Solar Project | Paris, TX | 567.6 GWh |
#49 | Blythe Mesa Solar II | Blythe, CA | 545.4 GWh |
#50 | Dodge Flat | Reno, NV | 544.6 GWh |
#51 | Oberon Solar Project | Desert Center, CA | 529.1 GWh |
#52 | Fox Squirrel Solar | Mt Sterling, OH | 543.5 GWh |
#53 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#54 | Sun Valley Solar Project | Abbott, TX | 542.5 GWh |
#56 | ENGIE Long Draw Solar LLC | Gail, TX | 532.6 GWh |
#57 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 528.8 GWh |
#58 | Dunn's Bridge 1 Solar | Wheatfield, IN | 528.3 GWh |
#59 | Yellowbud Solar, LLC | Williamsport, OH | 517.9 GWh |
#60 | Azure Sky Solar | Haskell, TX | 507.2 GWh |
#61 | Phoebe Solar | Kermit, TX | 512.7 GWh |
#62 | Techren Solar II LLC | Boulder, NV | 502.5 GWh |
#63 | Galloway 1 Solar Farm | Paint Rock, TX | 500.9 GWh |
#64 | Daggett 2 | Daggett, CA | 491.4 GWh |
#65 | Pisgah Ridge Solar, LLC | Richland, TX | 496.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Golden Field Solar III, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AV Solar Ranch One | Lancaster, CA | 570.9 GWh | 4.9 mi |
BigBeau Solar, LLC | Rosamond, CA | 323.7 GWh | 5.1 mi |
Catalina Solar 2, LLC | Rosamond, CA | 45.0 GWh | 3.4 mi |
Chaparral Springs | Rosamond, CA | 442.5 GWh | 4.6 mi |
Estrella Solar & Storage | Lancaster, CA | 99.2 GWh | 5.2 mi |
Golden Fields Solar I, LLC | Rosamond, CA | 140.9 GWh | 0.7 mi |
Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh | 2.9 mi |
Kingbird B Solar, LLC | Rosamond, CA | 55.6 GWh | 2.9 mi |
North Rosamond Solar LLC | Rosamond, CA | 392.8 GWh | 1.3 mi |
Pacific Wind LLC | Rosamond, CA | 264.0 GWh | 3.7 mi |
Rabbitbrush Solar, LLC | Rosamond, CA | 256.1 GWh | 4.4 mi |
Raceway Solar & Storage | Lancaster, CA | 218.0 GWh | 6.2 mi |
RE Astoria | Rosamond, CA | 231.1 GWh | 3.6 mi |
RE Astoria 2 | Rosamond, CA | 159.6 GWh | 4.9 mi |
RE Garland A | Rosamond, CA | 47.9 GWh | 6.1 mi |
Solar Star 1 | Rosamond, CA | 871.1 GWh | 2.1 mi |
Solar Star 2 | Rosamond, CA | 712.0 GWh | 2.4 mi |
Solar Star California, XLI, LLC | Rosamond, CA | 147.8 GWh | 0.7 mi |
Valentine Solar, LLC | Rosamond, CA | 289.8 GWh | 4 mi |
Willow Spring Solar, LLC | Rosamond, CA | 236.0 GWh | 3.7 mi |