Golden Field Solar III, LLC
14874 Holiday Ave, Rosamond, CA 93560Plant Summary Information
Golden Field Solar III, LLC is ranked #23 out of 799 solar farms in California in terms of total annual net electricity generation.
Golden Field Solar III, LLC generated 167.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Golden Field Solar III, LLC |
---|---|
Utility Name | Golden Field Solar III, LLC |
Location | Kern County, CA |
Initial Operation Date | December 2020 |
Last Update | Sep 2024 |
Annual Generation | 512.4 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,275 out of 11,852 Power Plants Nationwide | |
Ranked #57 out of 5,655 Solar Power Plants Nationwide | |
Ranked #78 out of 1,570 California Power Plants | |
Ranked #23 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Golden Field Solar III, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Golden Field Solar III, LLC.
Monthly Net Generation for Golden Field Solar III, LLC
Golden Field Solar III, LLC Details
Summary Information | |
---|---|
Plant Name | Golden Field Solar III, LLC (63859) |
Plant Address | 14874 Holiday Ave, Rosamond, CA 93560 |
Utility | Golden Field Solar III, LLC (63545) |
Latitude, Longitude | 34.847, -118.395 |
Generation Dates on File | Jan 2021 to Sep 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 512.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG20-54-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator RCTR Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 192 MW |
Summer Capacity | 192 MW |
Winter Capacity | 192 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 240 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Golden Field Solar III, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#47 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.5 GWh |
#48 | Lumina II Solar Project | Snyder, TX | 553.5 GWh |
#49 | Solar Blue | Lemoore, CA | 560.8 GWh |
#50 | Oberon Solar Project | Desert Center, CA | 535.4 GWh |
#51 | Dodge Flat | Reno, NV | 542.9 GWh |
#52 | Hecate Energy Frye Solar LLC | Kress, TX | 547.6 GWh |
#53 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#54 | Sun Valley Solar Project | Abbott, TX | 534.8 GWh |
#55 | ENGIE Long Draw Solar LLC | Gail, TX | 528.7 GWh |
#56 | Eiffel Solar Project | Paris, TX | 521.6 GWh |
#58 | Phoebe Solar | Kermit, TX | 514.1 GWh |
#59 | Dunn's Bridge 1 Solar | Wheatfield, IN | 513.4 GWh |
#60 | Azure Sky Solar | Haskell, TX | 505.2 GWh |
#61 | Techren Solar II LLC | Boulder, NV | 507.0 GWh |
#62 | Yellowbud Solar, LLC | Williamsport, OH | 501.3 GWh |
#63 | Galloway 1 Solar Farm | Paint Rock, TX | 495.7 GWh |
#64 | Centinela Solar Energy | Calexico, CA | 491.6 GWh |
#65 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 490.0 GWh |
#66 | Taygete II Energy Project | Coyanosa, TX | 488.0 GWh |
#67 | RE Maplewood | McCamey, TX | 481.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Golden Field Solar III, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AV Solar Ranch One | Lancaster, CA | 571.8 GWh | 4.9 mi |
BigBeau Solar, LLC | Rosamond, CA | 311.5 GWh | 5.1 mi |
Catalina Solar 2, LLC | Rosamond, CA | 45.0 GWh | 3.4 mi |
Chaparral Springs | Rosamond, CA | 440.3 GWh | 4.6 mi |
Estrella Solar & Storage | Lancaster, CA | 87.9 GWh | 5.2 mi |
Golden Fields Solar I, LLC | Rosamond, CA | 139.5 GWh | 0.7 mi |
Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh | 2.9 mi |
Kingbird B Solar, LLC | Rosamond, CA | 55.6 GWh | 2.9 mi |
North Rosamond Solar LLC | Rosamond, CA | 387.7 GWh | 1.3 mi |
Pacific Wind LLC | Rosamond, CA | 264.0 GWh | 3.7 mi |
Rabbitbrush Solar, LLC | Rosamond, CA | 256.9 GWh | 4.4 mi |
Raceway Solar & Storage | Lancaster, CA | 191.9 GWh | 6.2 mi |
RE Astoria | Rosamond, CA | 233.5 GWh | 3.6 mi |
RE Astoria 2 | Rosamond, CA | 160.7 GWh | 4.9 mi |
RE Garland A | Rosamond, CA | 47.9 GWh | 6.1 mi |
Solar Star 1 | Rosamond, CA | 870.3 GWh | 2.1 mi |
Solar Star 2 | Rosamond, CA | 708.8 GWh | 2.4 mi |
Solar Star California, XLI, LLC | Rosamond, CA | 148.3 GWh | 0.7 mi |
Valentine Solar, LLC | Rosamond, CA | 283.2 GWh | 4 mi |
Willow Spring Solar, LLC | Rosamond, CA | 234.2 GWh | 3.7 mi |