Golden Acorn Casino
1800 Golden Acorn Way, Campo, CA 91906Plant Summary Information
Golden Acorn Casino is ranked #92 out of 108 wind farms in California in terms of total annual net electricity generation.
Golden Acorn Casino generated 673.0 MWh during the 3-month period between May 2024 to August 2024.
Plant Name | Golden Acorn Casino |
---|---|
Utility Name | Foundation HA Energy Generation, LLC |
Location | San Diego County, CA |
Initial Operation Date | July 2014 |
Last Update | Aug 2024 |
Annual Generation | 4.3 GWh |
Annual Consumption | 15.4 k MMBtu |
Ranked #7,971 out of 11,835 Power Plants Nationwide | |
Ranked #1,234 out of 1,343 Wind Power Plants Nationwide | |
Ranked #1,113 out of 1,569 California Power Plants | |
Ranked #92 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Foundation CA Fund VII Manager, LLC (2013 to 2019) Foundation HA Energy Generation, LLC (2020 to 2023) |
Map of Golden Acorn Casino
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Golden Acorn Casino.
Monthly Net Generation for Golden Acorn Casino
Golden Acorn Casino Details
Summary Information | |
---|---|
Plant Name | Golden Acorn Casino (59328) |
Plant Address | 1800 Golden Acorn Way, Campo, CA 91906 |
Utility | Foundation HA Energy Generation, LLC (56930) |
Latitude, Longitude | 32.70211, -116.35459 |
Generation Dates on File | Jul 2014 to Aug 2024 |
Initial Operation Date | July 2014 |
Annual Generation | 4.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-749-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Amusement, Gambling, and Recreation Industries (713) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 480.00 kV |
Energy Storage | No |
Generator GAC1 Details Operating July 2014
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.85-82.5 |
Design Wind Speed | 16.1 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262 |
Golden Acorn Casino Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1224 | NLMU Wind | New London, IA | 4.7 GWh |
#1225 | Bowling Green Wind | Bowling Green, OH | 4.6 GWh |
#1226 | WCROC Wind Farm | Morris, MN | 4.6 GWh |
#1227 | Westridge Windfarm LLC | Woodstock, MN | 4.5 GWh |
#1228 | UMM Wind Turbine | Morris, MN | 4.5 GWh |
#1229 | Windwalkers LLC | Kensett, IA | 4.4 GWh |
#1230 | Greenback Energy | Pipestone, MN | 4.4 GWh |
#1231 | Iowa Distributed Wind Generation Project | Algona, IA | 4.3 GWh |
#1232 | City of Soledad Water Reclamation | Soledad, CA | 4.3 GWh |
#1233 | Coram Tehachapi | Tehachapi, CA | 4.3 GWh |
#1235 | LE Wind Turbine 1 | Euclid, OH | 4.2 GWh |
#1236 | Stahl Wind Energy | Pipestone, MN | 4.2 GWh |
#1237 | Carstensen Wind | Pipestone, MN | 4.2 GWh |
#1238 | Foundation CDCR LAC | Lancaster, CA | 4.2 GWh |
#1239 | Two Dot Wind Broadview East LLC | Broadview, MT | 4.2 GWh |
#1240 | Bulldog | Orient, IA | 4.2 GWh |
#1241 | WED Portsmouth One, LLC | Portsmouth, RI | 4.2 GWh |
#1242 | Notus Wind 1 | E. Falmouth, MA | 4.1 GWh |
#1243 | T-Bone Wind (10) LLC | Dumas, TX | 4.1 GWh |
#1244 | Carleton College | Northfield, MN | 4.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Golden Acorn Casino.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CalPeak Power Border Peaker Plant | San Diego, CA | 13.2 GWh | 35.6 mi |
Centinela State Prison | Sacramento, CA | 18.1 GWh | 34.3 mi |
Cuyamaca Peak Energy Plant | El Cajon, CA | 12.1 GWh | 36.5 mi |
El Cajon Energy Center | El Cajon, CA | 7.6 GWh | 36.5 mi |
Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh | 33.8 mi |
Jacumba Solar Farm | Jacumba, CA | 43.2 GWh | 14.3 mi |
Kumeyaay Wind | Campo, CA | 145.1 GWh | 0.7 mi |
Larkspur Energy Facility | San Diego, CA | 38.7 GWh | 35.6 mi |
Ocotillo Express LLC | Ocotillo, CA | 539.0 GWh | 18.3 mi |
Ocotillo Wells | Borrego Springs, CA | 86.8 GWh | 29.9 mi |
Otay Mesa Generating Project | San Diego, CA | 2.4 TWh | 33.7 mi |
Pio Pico Energy Center | San Diego, CA | 100.1 GWh | 33.9 mi |
San Diego - EMDF at San Diego | San Diego, CA | 4.8 GWh | 33.8 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 34.3 mi |
SEPV Imperial Dixieland West | Imperial, CA | 7.0 GWh | 34 mi |
Seville 1 | Ocotillo Wells, CA | 50.3 GWh | 34.6 mi |
Seville 2 | Ocotillo Wells, CA | 83.0 GWh | 34.7 mi |
Tule Wind LLC | Boulevard, CA | 342.5 GWh | 4.6 mi |
USG 1 | El Centro, CA | 2.7 GWh | 29.6 mi |
USG 2 | El Centro, CA | 1.6 GWh | 29.2 mi |