Gold Creek
700 Capital Ave., Juneau, AK 99801Plant Summary Information
Gold Creek is ranked #22 out of 33 hydroelectric power plants in Alaska in terms of total annual net electricity generation.
Gold Creek is comprised of 8 generators and generated 2.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gold Creek |
---|---|
Utility Name | Alaska Electric Light & Power Co. |
Location | Juneau City and Borough, AK |
Initial Operation Date | September 1906 |
Last Update | Dec 2023 |
Annual Generation | 9.1 GWh |
Annual Consumption | 33.1 k MMBtu |
Ranked #6,183 out of 11,835 Power Plants Nationwide | |
Ranked #997 out of 1,371 Water Power Plants Nationwide | |
Ranked #52 out of 130 Alaska Power Plants | |
Ranked #22 out of 33 Alaska Water Power Plants | |
Fuel Types | Water : 99.9% |
Previous Operator |
Alaska Electric Light&Power Co (2013 to 2020) Alaska Electric Light & Power Co. (2021 to 2023) |
Map of Gold Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gold Creek.
Monthly Net Generation for Gold Creek
Gold Creek Details
Summary Information | |
---|---|
Plant Name | Gold Creek (63) |
Plant Address | 700 Capital Ave., Juneau, AK 99801 |
Utility | Alaska Electric Light & Power Co. (213) |
Latitude, Longitude | 58.3107, -134.4174 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | September 1906 |
Annual Generation | 9.1 GWh |
Fuel Types | Water : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | |
Balancing Authority | () |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Gold Creek |
Ash Impoundment | No |
Transmission / Distribution Owner | Alaska Electric Light&Power Co (213) AK |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 2 Details Operating November 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1914 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating November 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1914 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1 Details Operating September 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator IC1 Details Standby June 1952
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | June 1952 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator IC2 Details Standby August 1954
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 1954 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator IC3 Details Standby August 1961
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator IC4 Details Standby September 1963
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | September 1963 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator IC5 Details Standby October 1966
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | October 1966 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Gold Creek Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#987 | Superior Falls | Ironwood, MI | 9.2 GWh |
#988 | Pleasant Valley Hydro | Bishop, CA | 9.2 GWh |
#989 | Upper Sterling | Rock Falls, IL | 9.2 GWh |
#990 | Knife Falls | Cloquet, MN | 9.2 GWh |
#991 | Birch Creek Power | Terreton, ID | 9.2 GWh |
#992 | Barber Dam | Boise, ID | 9.2 GWh |
#993 | Winton | Winton, MN | 9.1 GWh |
#994 | Ephratah | Saint Johnsville, NY | 9.1 GWh |
#995 | Eel Weir | Oswegatchie, NY | 9.1 GWh |
#996 | Marshfield 6 | Marshfield, VT | 9.1 GWh |
#998 | Saxon Falls | Saxon, WI | 9.1 GWh |
#999 | Strawberry Creek | Bedford, WY | 9.0 GWh |
#1000 | Big Pine Creek | Big Pine, CA | 9.0 GWh |
#1001 | Copenhagen Plant | Copenhagen, NY | 9.0 GWh |
#1002 | Low Line Rapids | Kimberly, ID | 8.9 GWh |
#1003 | Drop 5 | Montrose, CO | 8.9 GWh |
#1004 | Crystal Springs | Filer, ID | 8.9 GWh |
#1005 | Weeks Falls | North Bend, WA | 8.8 GWh |
#1006 | Kasidaya Creek Hydro | Skagway, AK | 8.8 GWh |
#1007 | Oswegatchie | Edwards, NY | 8.8 GWh |
Nearby Power Plants
Below are closest 16 power plants surrounding Gold Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angoon | Angoon, AK | 1.8 GWh | 56.4 mi |
Annex Creek | Juneau, AK | 8.4 GWh | 11.5 mi |
Blue Lake Hydro | Sitka, AK | 80.3 GWh | 92 mi |
Goat Lake Hydro | Skagway, AK | 15.8 GWh | 89.3 mi |
Green Lake | Sitka, AK | 41.8 GWh | 95.2 mi |
Gustavus | Gustavus, AK | 319.0 MWh | 47.3 mi |
Haines | Haines, AK | 242.0 MWh | 73.8 mi |
Hoonah | Hoonah, AK | 4.2 GWh | 39.5 mi |
Kake | Kake, AK | 1.5 GWh | 94.9 mi |
Kasidaya Creek Hydro | Skagway, AK | 8.8 GWh | 82.6 mi |
Lake Dorothy Hydroelectric Project | Juneau, AK | 88.6 GWh | 14.3 mi |
Pelican | Pelican, AK | 1.6 GWh | 70.1 mi |
Petersburg | Petersburg, AK | 780.0 MWh | 116.9 mi |
Salmon Creek 1 | Juneau, AK | 28.8 GWh | 2 mi |
Skagway | Skagway, AK | 4.0 GWh | 85.3 mi |
Snettisham | Juneau, AK | 302.1 GWh | 27.4 mi |