Goal Line LP
555 N. Tulip Street, Escondido, CA 92025Plant Summary Information
Goal Line LP is ranked #188 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Goal Line LP is comprised of 2 generators and generated 9.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Goal Line LP |
---|---|
Utility Name | Goal Line LP |
Location | San Diego County, CA |
Initial Operation Date | August 1994 |
Last Update | Sep 2024 |
Annual Generation | 13.1 GWh |
Annual Consumption | 119.7 k MMBtu |
Ranked #5,544 out of 11,852 Power Plants Nationwide | |
Ranked #1,519 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #783 out of 1,570 California Power Plants | |
Ranked #188 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Goal Line LP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Goal Line LP.
Monthly Net Generation for Goal Line LP
Goal Line LP Details
Summary Information | |
---|---|
Plant Name | Goal Line LP (54749) |
Plant Address | 555 N. Tulip Street, Escondido, CA 92025 |
Utility | Goal Line LP (22269) |
Latitude, Longitude | 33.1185, -117.0995 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | August 1994 |
Annual Generation | 13.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG Details Operating August 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | GOALLINE_6_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CAISO SP-15 |
Nameplate Capacity | 41.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1994 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG Details Operating August 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 10.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9.4 MW |
Winter Capacity | 9.4 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Goal Line LP Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1509 | EQX003 Secaucus Rd Fuel Cell | Secaucus, NJ | 13.4 GWh |
#1510 | Plant No 2 Orange County | Huntington Beach, CA | 59.0 GWh |
#1511 | Michigan City | Michigan City, IN | 1.3 TWh |
#1512 | Covanta Niagara I, LLC | Niagara Falls, NY | 183.6 GWh |
#1513 | CalPeak Power Border Peaker Plant | San Diego, CA | 13.2 GWh |
#1514 | HVCC Cogen Plant | Troy, NY | 13.2 GWh |
#1515 | Interstate Paper LLC Riceboro | Riceboro, GA | 103.9 GWh |
#1516 | One Patriot | Foxborough, MA | 13.1 GWh |
#1517 | Digital Fairfield | Trumbull, CT | 13.1 GWh |
#1518 | Clearwater Power Plant | Corona, CA | 13.1 GWh |
#1520 | POET Biorefining - Leipsic, LLC | Leipsic, OH | 13.0 GWh |
#1521 | UNH 7.9 MW Plant | Durham, NH | 48.5 GWh |
#1522 | Montville Station | Uncasville, CT | 36.2 GWh |
#1523 | Wheaton | Eau Claire, WI | 30.9 GWh |
#1524 | Elkton | Elkton, VA | 13.0 GWh |
#1525 | Fairmont (MN) | Fairmont, MN | 13.0 GWh |
#1526 | Bradley Energy Center | Windsor Locks, CT | 12.9 GWh |
#1527 | Jameson Gas Processing Plant | Silver, TX | 12.9 GWh |
#1528 | Lewis & Clark | Richland, MT | 12.7 GWh |
#1529 | George Neal North | Sergeant Bluff, IA | 798.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Goal Line LP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bear Valley | Escondido, CA | 2.7 GWh | 5.8 mi |
CalPeak Power Enterprise Peaker Plant | Escondido, CA | 5.5 GWh | 1.1 mi |
Carlsbad Energy Center | Carlsbad, CA | 254.2 GWh | 13.6 mi |
Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh | 12.8 mi |
Escondido Energy Center | Escondido, CA | 23.3 GWh | 1.2 mi |
GEN005 Antibody Fuel Cell | Oceanside, CA | 16.3 GWh | 13.2 mi |
Genentech-Oceanside Hybrid | Oceanside, CA | 5.0 GWh | 13.2 mi |
Gilead Oceanside Solar Project | Oceanside, CA | 2.3 GWh | 13.5 mi |
Kilroy Solar | San Diego, CA | 6.7 GWh | 14.8 mi |
Life Technologies Carlsbad | Carlsbad, CA | 7.6 GWh | 10.9 mi |
NLP Granger | Valley Center, CA | 6.1 GWh | 10.8 mi |
Palomar Energy | Escondido, CA | 1.2 TWh | 1.1 mi |
San Diego - NCRC at Vista | Vista, CA | 2.8 GWh | 10.3 mi |
SDCCD - Miramar | San Diego, CA | 1.5 GWh | 14.7 mi |
SDCWA - Twin Oaks | San Marcos, CA | 117.0 MWh | 7.5 mi |
Vallecitos Water District | San Marcos, CA | 3.4 GWh | 7.9 mi |
Valley Center | Valley Center, CA | 3.5 GWh | 10.1 mi |
Valley Center 1 | Valley Center, CA | 3.9 GWh | 9.8 mi |
Valley Center 2 | Valley Center, CA | 6.8 GWh | 9.8 mi |
Watkins Manufacturing Co. | San Diego, CA | 4.9 GWh | 8.1 mi |