Gloucester Solar
9375 John Clayton Memorial Hig, Gloucester, VA 23061Plant Summary Information
Gloucester Solar is ranked #42 out of 94 solar farms in Virginia in terms of total annual net electricity generation.
Gloucester Solar generated 6.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gloucester Solar |
---|---|
Utility Name | Dominion Energy Inc. |
Location | Gloucester County, VA |
Initial Operation Date | April 2019 |
Last Update | Dec 2023 |
Annual Generation | 37.5 GWh |
Annual Consumption | 133.3 k MMBtu |
Ranked #4,246 out of 11,835 Power Plants Nationwide | |
Ranked #904 out of 5,643 Solar Power Plants Nationwide | |
Ranked #93 out of 211 Virginia Power Plants | |
Ranked #42 out of 94 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Dominion Energy Inc (2019 to 2021) Dominion Energy Inc. (2022 to 2023) |
Map of Gloucester Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gloucester Solar.
Monthly Net Generation for Gloucester Solar
Gloucester Solar Details
Summary Information | |
---|---|
Plant Name | Gloucester Solar (63031) |
Plant Address | 9375 John Clayton Memorial Hig, Gloucester, VA 23061 |
Utility | Dominion Energy Inc. (5248) |
Latitude, Longitude | 37.45, -76.45 |
Generation Dates on File | Apr 2019 to Dec 2023 |
Initial Operation Date | April 2019 |
Annual Generation | 37.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GLSO Details Operating April 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 19.9 MW |
Summer Capacity | 19.8 MW |
Winter Capacity | 19.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 9 |
DC Net Capacity | 27.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Gloucester Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#894 | Mt. Home Solar 1, LLC | Pocatello, ID | 38.2 GWh |
#895 | Nellis Solar PV II | North Las Vegas, NV | 38.0 GWh |
#896 | RE Rosamond Two LLC | Rosamond, CA | 38.0 GWh |
#897 | Fusion Solar Center LLC | Baltic, CT | 37.9 GWh |
#898 | Elk Hill Solar 1 | Mercersburg, PA | 37.9 GWh |
#899 | Westlands Solar PV Farm | Huron, CA | 37.8 GWh |
#900 | Caden Energix Wytheville LLC | Wytheville, VA | 37.8 GWh |
#901 | Apple Data Center - PV2 | Conover, NC | 37.8 GWh |
#902 | Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh |
#903 | Gates Solar Station | Huron, CA | 37.5 GWh |
#905 | O'Brien Solar Fields | Fitchburg, WI | 37.4 GWh |
#906 | Energix Nokesville, LLC | Nokesville, VA | 37.3 GWh |
#907 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 37.2 GWh |
#908 | San Joaquin Solar | Helm, CA | 37.2 GWh |
#909 | Stillwater Facility | Fallon, NV | 123.7 GWh |
#910 | Lyons Road | Owosso, MI | 36.9 GWh |
#911 | Whitetail Solar 2 | St. Thomas, PA | 36.7 GWh |
#912 | Wildwood Solar II | Wasco, CA | 36.6 GWh |
#913 | East Point Energy Center, LLC | Sharon Springs, NY | 36.4 GWh |
#914 | CoTAL Solar Farm | Tallahassee, FL | 36.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gloucester Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayview | Bayview, VA | 1.5 GWh | 29.2 mi |
Belle Haven Diesel Generation Facility | Belle Haven, VA | 121.0 MWh | 36.8 mi |
Carvers Creek Solar | Gloucester, VA | 6.9 GWh | 11.5 mi |
Cavalier Solar | Smithfield, VA | 93.7 GWh | 33.7 mi |
Colonial Trail West | Spring Grove, VA | 282.3 GWh | 32.9 mi |
Correctional Solar LLC | Barhamsville, VA | 30.1 GWh | 21.7 mi |
Essex Solar Center | Dunnsville, VA | 35.2 GWh | 32.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 24.2 mi |
Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh | 29.8 mi |
King & Queen | Little Plymouth, VA | 53.8 GWh | 22.8 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 18.8 mi |
Puller Solar | Topping, VA | 27.7 GWh | 8.5 mi |
Rappahannock Solar, LLC | White Stone, VA | 3.2 GWh | 14.8 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 18.4 mi |
Spring Grove I | Spring Grove, VA | 155.4 GWh | 32.1 mi |
Surry | Surry, VA | 13.8 TWh | 23.9 mi |
Tangier | Tangier, VA | 88.0 MWh | 36.2 mi |
Waste Management Bethel LFGTE | Hampton, VA | 37.4 GWh | 25.8 mi |
Waste Management Middle Peninsula LFGTE | Glenns, VA | 50.0 GWh | 10.7 mi |
WestRock-West Point Mill | West Point, VA | 525.4 GWh | 20.4 mi |