Gloucester Solar
9375 John Clayton Memorial Hig, Gloucester, VA 23061Plant Summary Information
Gloucester Solar is ranked #45 out of 100 solar farms in Virginia in terms of total annual net electricity generation.
Gloucester Solar generated 6.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gloucester Solar |
---|---|
Utility Name | Dominion Energy Inc. |
Location | Gloucester County, VA |
Initial Operation Date | April 2019 |
Last Update | Dec 2023 |
Annual Generation | 37.5 GWh |
Annual Consumption | 133.3 k MMBtu |
Ranked #4,317 out of 11,979 Power Plants Nationwide | |
Ranked #959 out of 5,765 Solar Power Plants Nationwide | |
Ranked #95 out of 216 Virginia Power Plants | |
Ranked #45 out of 100 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Dominion Energy Inc (2019 to 2021) Dominion Energy Inc. (2022 to 2023) |
Map of Gloucester Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gloucester Solar.
Monthly Net Generation for Gloucester Solar
Gloucester Solar Details
Summary Information | |
---|---|
Plant Name | Gloucester Solar (63031) |
Plant Address | 9375 John Clayton Memorial Hig, Gloucester, VA 23061 |
Utility | Dominion Energy Inc. (5248) |
Latitude, Longitude | 37.45, -76.45 |
Generation Dates on File | Apr 2019 to Dec 2023 |
Initial Operation Date | April 2019 |
Annual Generation | 37.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GLSO Details Operating April 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 19.9 MW |
Summer Capacity | 19.8 MW |
Winter Capacity | 19.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 9 |
DC Net Capacity | 27.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Gloucester Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#949 | RE Rosamond Two LLC | Rosamond, CA | 38.0 GWh |
#950 | West Memphis Solar, LLC | Crawfordsville, AR | 37.9 GWh |
#951 | Elk Hill Solar 1 | Mercersburg, PA | 37.9 GWh |
#952 | Westlands Solar PV Farm | Huron, CA | 37.8 GWh |
#953 | Caden Energix Wytheville LLC | Wytheville, VA | 37.8 GWh |
#954 | Apple Data Center - PV2 | Conover, NC | 37.8 GWh |
#955 | Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh |
#956 | Bayou Galion Solar Project | Mer Rouge, LA | 37.6 GWh |
#957 | Dunns Bridge II Solar | San Pierre, IN | 37.5 GWh |
#958 | Gates Solar Station | Huron, CA | 37.5 GWh |
#960 | O'Brien Solar Fields | Fitchburg, WI | 37.4 GWh |
#961 | Energix Nokesville, LLC | Nokesville, VA | 37.3 GWh |
#962 | Nellis Solar PV II | North Las Vegas, NV | 37.3 GWh |
#963 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 37.2 GWh |
#964 | San Joaquin Solar | Helm, CA | 37.2 GWh |
#965 | Stillwater Facility | Fallon, NV | 123.7 GWh |
#966 | Lyons Road | Owosso, MI | 36.9 GWh |
#967 | AES Lawai Solar Hybrid | Lawai, HI | 36.3 GWh |
#968 | Whitetail Solar 2 | St. Thomas, PA | 36.7 GWh |
#969 | Wildwood Solar II | Wasco, CA | 36.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gloucester Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayview | Bayview, VA | 1.5 GWh | 29.2 mi |
Bookers Mill Solar | Farnham, VA | 18.7 GWh | 29 mi |
Carvers Creek Solar | Gloucester, VA | 48.0 GWh | 11.5 mi |
Cavalier Solar | Smithfield, VA | 207.6 GWh | 33.7 mi |
Cavalier Solar A2 | Smithfield, VA | 17.3 GWh | 33.7 mi |
Colonial Trail West | Spring Grove, VA | 282.4 GWh | 32.9 mi |
Correctional Solar LLC | Barhamsville, VA | 30.1 GWh | 21.7 mi |
Essex Solar Center | Dunnsville, VA | 35.9 GWh | 32.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 24.2 mi |
Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh | 29.8 mi |
King & Queen | Little Plymouth, VA | 53.8 GWh | 22.8 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 18.8 mi |
Puller Solar | Topping, VA | 27.7 GWh | 8.5 mi |
Rappahannock Solar, LLC | White Stone, VA | 3.2 GWh | 14.8 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 18.4 mi |
Spring Grove I | Spring Grove, VA | 158.9 GWh | 32.1 mi |
Surry | Surry, VA | 12.9 TWh | 23.9 mi |
Waste Management Bethel LFGTE | Hampton, VA | 37.4 GWh | 25.8 mi |
Waste Management Middle Peninsula LFGTE | Glenns, VA | 50.0 GWh | 10.7 mi |
WestRock-West Point Mill | West Point, VA | 510.3 GWh | 20.4 mi |