Glenwood Landing
400 Shore Road, Glenwood Landing, NY 11547Plant Summary Information
Glenwood Landing is ranked #33 out of 116 natural gas power plants in New York in terms of total annual net electricity generation.
Glenwood Landing is comprised of 3 generators and generated 9.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Glenwood Landing |
---|---|
Utility Name | National Grid Generation LLC |
Location | Nassau County, NY |
Initial Operation Date | April 1967 |
Last Update | Dec 2023 |
Annual Generation | 154.4 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #2,619 out of 11,835 Power Plants Nationwide | |
Ranked #804 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #68 out of 832 New York Power Plants | |
Ranked #33 out of 116 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of Glenwood Landing
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Glenwood Landing.
Monthly Net Generation for Glenwood Landing
Glenwood Landing Details
Summary Information | |
---|---|
Plant Name | Glenwood Landing (7869) |
Plant Address | 400 Shore Road, Glenwood Landing, NY 11547 |
Utility | National Grid Generation LLC (56505) |
Latitude, Longitude | 40.8275, -73.6478 |
Generation Dates on File | Jan 2006 to Dec 2023 |
Initial Operation Date | April 1967 |
Annual Generation | 154.4 GWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Hempstead Harbor |
Ash Impoundment | |
Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | IROQUOIS GAS TRANSMISSION SYS LP |
Natural Gas Storage | No |
Generator GT1 Details Standby April 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23712 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23712 |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 12.6 MW |
Winter Capacity | 17.6 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | April 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator GT4 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24219 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24219 |
Nameplate Capacity | 53 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 42.6 MW |
Winter Capacity | 47 MW |
Minimum Load | 37 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 42.6 MW |
Net Winter Capacity With Natural Gas | 47 MW |
Net Summer Capacity With Oil | 42.6 MW |
Net Winter Capacity With Oil | 47 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 24220 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 24220 |
Nameplate Capacity | 53 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 42.5 MW |
Winter Capacity | 47 MW |
Minimum Load | 37 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 42.5 MW |
Net Winter Capacity With Natural Gas | 47 MW |
Net Summer Capacity With Oil | 42.5 MW |
Net Winter Capacity With Oil | 47 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Glenwood Landing Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#794 | Wallingford Energy | Wallingford, CT | 161.3 GWh |
#795 | Otsego Mill Power Plant | Otsego, MI | 161.2 GWh |
#796 | PE Berkeley | Berkeley, CA | 161.2 GWh |
#797 | Paris (WI) | Union Grove, WI | 160.2 GWh |
#798 | Toray Plastic America's CHP Plant | North Kingstown, RI | 157.3 GWh |
#799 | Lieberman | Mooringsport, LA | 155.8 GWh |
#800 | Smarr Energy Center | Forsyth, GA | 155.7 GWh |
#801 | Kern River Cogeneration | Bakersfield, CA | 155.5 GWh |
#802 | Sarpy County | Bellevue, NE | 161.8 GWh |
#803 | Westrock Hodge (LA) | Hodge, LA | 412.2 GWh |
#805 | CF Industries Yazoo City Complex | Yazoo City, MS | 153.6 GWh |
#806 | Kenilworth Energy Facility | Kenilworth, NJ | 152.8 GWh |
#807 | SJRR Power LLC | Houston, TX | 152.2 GWh |
#808 | Frederickson | Tacoma, WA | 159.6 GWh |
#809 | Limon Generating Station | Limon, CO | 153.7 GWh |
#810 | Marquette Energy Center | Marquette, MI | 152.6 GWh |
#811 | International Paper Prattville Mill | Prattville, AL | 608.4 GWh |
#812 | Fulton (AR) | Fulton, AR | 148.8 GWh |
#813 | Lederle Laboratories | Pearl River, NY | 148.3 GWh |
#814 | North Omaha | Omaha, NE | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Glenwood Landing.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Albert Einstein College of Medicine | Bronx, NY | 34.0 MWh | 10.6 mi |
Altice - Hicksville | Hicksville, NY | 16.9 GWh | 8.8 mi |
Bethpage Power Plant | Hicksville, NY | 594.8 GWh | 9.6 mi |
Bloom-Altice Fuel Cell | Bethpage,, NY | 14.4 GWh | 9.2 mi |
Bronx Zoo | New York, NY | 20.4 GWh | 12 mi |
Charles P Keller | Rockville Centre, NY | 24.0 MWh | 11.7 mi |
Covanta Hempstead | Westbury, NY | 585.4 GWh | 6.8 mi |
Fordham University | Bronx, NY | 48.0 MWh | 12.7 mi |
Fuel Cell 3245 Yates Avenue | Bronx, NY | 43.3 GWh | 11.3 mi |
Glenwood | Glenwood Landing, NY | 568.0 MWh | 0 mi |
Montefieor Medical Center Moses Division | Bronx, NY | 28.7 GWh | 12.7 mi |
Montefiore - Westchester Square | Bronx, NY | 3.0 MWh | 10.5 mi |
Montefiore Mount Vernon Hospital | Mount Vernon, NY | 55.0 MWh | 12.7 mi |
Mount Sinai South Nassau Hospital | Oceanside, NY | 24.5 MWh | 12.2 mi |
NY - PANYNJ - LaGuardia - Rooftop | Queens, NY | 1.5 GWh | 12.5 mi |
NY Times Daily Production Facility | Flushing, NY | 19.0 MWh | 10.2 mi |
NYPH-Queens | Flushing, NY | 64.0 MWh | 10.7 mi |
Plant No 1 Freeport | Freeport, NY | 20.0 MWh | 12.2 mi |
Riverbay | New York, NY | 169.0 GWh | 9.7 mi |
St. Mary's Hospital For Children | Bayside, NY | 36.0 MWh | 7.3 mi |