Glass House Camarillo Cultivation
645 W Laguna Road, Camarillo, CA 93012Plant Summary Information
Glass House Camarillo Cultivation is ranked #98 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Glass House Camarillo Cultivation is comprised of 3 generators and generated 13.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Glass House Camarillo Cultivation |
---|---|
Utility Name | Glass House Camarillo Cultivation |
Location | Ventura County, CA |
Initial Operation Date | August 2012 |
Last Update | Dec 2023 |
Annual Generation | 45.4 GWh |
Annual Consumption | 448.9 k MMBtu |
Ranked #3,991 out of 11,852 Power Plants Nationwide | |
Ranked #1,126 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #496 out of 1,570 California Power Plants | |
Ranked #98 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Houweling's Tomatoes (2013 to 2020) Glass House Camarillo Cultivation (2021 to 2023) |
Map of Glass House Camarillo Cultivation
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Glass House Camarillo Cultivation.
Monthly Net Generation for Glass House Camarillo Cultivation
Glass House Camarillo Cultivation Details
Summary Information | |
---|---|
Plant Name | Glass House Camarillo Cultivation (58432) |
Plant Address | 645 W Laguna Road, Camarillo, CA 93012 |
Utility | Glass House Camarillo Cultivation (64570) |
Latitude, Longitude | 34.17972, -119.08306 |
Generation Dates on File | Jan 2013 to Dec 2023 |
Initial Operation Date | August 2012 |
Annual Generation | 45.4 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | QF12-413-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 16.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator COG1 Details Operating August 2012
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SCE |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SCE |
Nameplate Capacity | 4.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Minimum Load | 3.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2012 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator COG2 Details Operating August 2012
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SCE |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SCE |
Nameplate Capacity | 4.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Minimum Load | 3.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2012 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator COG3 Details Operating September 2013
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SCE |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SCE |
Nameplate Capacity | 4.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Minimum Load | 3.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2013 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Glass House Camarillo Cultivation Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1116 | Barrow | Barrow, AK | 46.7 GWh |
#1117 | Louisiana Tech University Power Plant | Ruston, LA | 46.6 GWh |
#1118 | Spencer | Denton, TX | 46.6 GWh |
#1119 | T J Labbe Electric Generating | Lafayette, LA | 46.5 GWh |
#1120 | Montclair State University Cogen | Little Falls, NJ | 47.0 GWh |
#1121 | NRG Rockford II Energy Center | Rockford, IL | 46.4 GWh |
#1122 | AMEA Peaking | Sylacauga, AL | 46.3 GWh |
#1123 | East Campus Steam Plant | University Park, PA | 46.0 GWh |
#1124 | Hargis-Hebert Electric Generating | Lafayette, LA | 46.0 GWh |
#1125 | HTW Plant 303 COGEN | Salt Lake City, UT | 45.7 GWh |
#1127 | Feather River Energy Center | Yuba City, CA | 45.2 GWh |
#1128 | Blacksand Generating Facility | Brea, CA | 45.1 GWh |
#1129 | Otter Creek Ethanol Poet - Ashton | Ashton, IA | 44.8 GWh |
#1130 | R M Schahfer | Wheatfield, IN | 1.7 TWh |
#1131 | Coalinga Cogeneration Facility | Coalinga, CA | 44.4 GWh |
#1132 | King City Power Plant | King City, CA | 44.1 GWh |
#1133 | LCEC Generation LLVC | Lovington, NM | 44.1 GWh |
#1134 | Aberdeen CT | Aberdeen, SD | 44.3 GWh |
#1135 | South Energy Center | Gainesville, FL | 44.0 GWh |
#1136 | Osawatomie | Miami, KS | 44.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Glass House Camarillo Cultivation.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20701 Plummer PV, LLC | Chatsworth, CA | 2.4 GWh | 28.8 mi |
CA - Ventura Co CCD - Moorpark College | Moorpark, CA | 1.8 GWh | 16.5 mi |
CA-Ventura Co CCD-Oxnard College Canopy | Ventura, CA | 2.8 GWh | 4.3 mi |
Calabasas Gas to Energy Facility | Agoura, CA | 47.4 GWh | 20.6 mi |
California State Univ at Channel Islands | Camarillo, CA | 7.7 GWh | 2.6 mi |
CSUCI Site Authority | Camarillo, CA | 2.6 GWh | 2.4 mi |
E F Oxnard Energy Facility | Oxnard, CA | 8.2 GWh | 4.9 mi |
East Portal Generator | Chatsworth, CA | 4.0 GWh | 26.8 mi |
Kaiser - Woodland Hills | Woodland Hills, CA | 17.7 GWh | 28.2 mi |
Las Virgenes | Calabasas, CA | 6.7 GWh | 22 mi |
Las Virgenes Municipal Water District | Calabasas, CA | 1.6 GWh | 22 mi |
McGrath Peaker | Oxnard, CA | 11.4 GWh | 9.5 mi |
Ormond Beach | Oxnard, CA | 68.8 GWh | 6 mi |
Oxnard | Oxnard, CA | 481.6 GWh | 4.9 mi |
Oxnard Paper Mill | Oxnard, CA | 191.7 GWh | 6.3 mi |
Oxnard Wastewater Treatment Plant | Oxnard, CA | 5.3 GWh | 6.4 mi |
Prairie | Chatsworth, CA | 2.9 GWh | 28.8 mi |
Springville Hydroelectric | Camarillo, CA | 363.0 MWh | 3.2 mi |
SunEdison Procter & Gamble Oxnard | Oxnard, CA | 1.5 GWh | 3.4 mi |
Ventura Solar | Fillmore, CA | 6.2 GWh | 18.4 mi |