Gilroy Peaking Energy Center
1400 Pacheco Pass Hwy, Gilroy, CA 95020Plant Summary Information
Gilroy Peaking Energy Center is ranked #136 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Gilroy Peaking Energy Center is comprised of 3 generators and generated 3.5 GWh during the 3-month period between August 2023 to November 2023.
Plant Name | Gilroy Peaking Energy Center |
---|---|
Utility Name | Calpine Gilroy Cogen LP |
Location | Santa Clara County, CA |
Initial Operation Date | November 2001 |
Last Update | Nov 2023 |
Annual Generation | 27.2 GWh |
Annual Consumption | 315.9 k MMBtu |
Ranked #4,660 out of 11,835 Power Plants Nationwide | |
Ranked #1,304 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #640 out of 1,569 California Power Plants | |
Ranked #136 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Gilroy Peaking Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilroy Peaking Energy Center.
Monthly Net Generation for Gilroy Peaking Energy Center
Gilroy Peaking Energy Center Details
Summary Information | |
---|---|
Plant Name | Gilroy Peaking Energy Center (55810) |
Plant Address | 1400 Pacheco Pass Hwy, Gilroy, CA 95020 |
Utility | Calpine Gilroy Cogen LP (3028) |
Latitude, Longitude | 36.999, -121.5363 |
Generation Dates on File | Jun 2002 to Nov 2023 |
Initial Operation Date | November 2001 |
Annual Generation | 27.2 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-287-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Reclaimed SCWRA water |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | PACIFIC GAS |
Natural Gas Storage | No |
Generator S3 Details Operating November 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 38 MW |
Winter Capacity | 38 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator S4 Details Operating November 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 38 MW |
Winter Capacity | 38 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator S5 Details Operating February 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 38 MW |
Winter Capacity | 38 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Gilroy Peaking Energy Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Gilroy Energy Center LLC | 5975 Lambie Road, Suisun, CA 94585 | Generator S3 | 100.00% |
Gilroy Energy Center LLC | 5975 Lambie Road, Suisun, CA 94585 | Generator S4 | 100.00% |
Gilroy Energy Center LLC | 5975 Lambie Road, Suisun, CA 94585 | Generator S5 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1294 | Gaylord Container Bogalusa | Bogalusa, LA | 406.1 GWh |
#1295 | Pleasants Power Station | Willow Island, WV | 2.2 TWh |
#1296 | Riverview Energy Center | Antioch, CA | 27.9 GWh |
#1297 | Equinix Lundy Ave. Fuel Cell | San Jose, CA | 27.8 GWh |
#1298 | CSUF Trigeneration | Fullerton, CA | 33.9 GWh |
#1299 | University of Iowa Main Power Plant | Iowa City, IA | 49.2 GWh |
#1300 | Argus Cogen Plant | Trona, CA | 254.9 GWh |
#1301 | INEOS Naperville Cogeneration Plant | Naperville, IL | 27.6 GWh |
#1302 | Grossmont Hospital | La Mesa, CA | 27.5 GWh |
#1303 | CIP II/AR Bridgewater Holdings - NJCOE | Bridgewater, NJ | 27.4 GWh |
#1305 | B Braun Medical | Irvine, CA | 27.2 GWh |
#1306 | APP Prune A-D | Cupertino, CA | 27.1 GWh |
#1307 | PSEG Burlington Generating Station | Burlington, NJ | 27.6 GWh |
#1308 | Mondelez Global LLC | Rockford, IL | 26.9 GWh |
#1309 | Sagamore Plant Cogeneration | Lafayette, IN | 26.9 GWh |
#1310 | Gilbert | Milford, NJ | 26.8 GWh |
#1311 | Childrens Hospital | San Diego, CA | 26.7 GWh |
#1312 | Fuel Cell 18A Sneden Avenue | Staten Island, NY | 26.7 GWh |
#1313 | Opryland USA | Nashville, TN | 26.7 GWh |
#1314 | HSCo CHP | Hartford, CT | 26.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gilroy Peaking Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Santa Cruz Energy | Watsonville, CA | 18.8 GWh | 16.4 mi |
Cabrillo College | Aptos, CA | 13.0 MWh | 21.3 mi |
Dinosaur Point | Los Banos, CA | 7.9 GWh | 20.4 mi |
Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 4.7 TWh | 19.1 mi |
Enerparc CA1 LLC | Hollister, CA | 2.5 GWh | 13.7 mi |
Equinix Great Oaks Blvd. Fuel Cell | San Jose, CA | 28.2 GWh | 21.5 mi |
Equinix San Jose | San Jose, CA | 7.6 GWh | 21.5 mi |
EQX010 Great Oaks Fuel Cell | San Jose, CA | 16.5 GWh | 21.6 mi |
EQX015 Great Oaks Fuel Cell | San Jose, CA | 29.2 GWh | 21.5 mi |
Extreme San Ignacio | San Jose, CA | 6.0 GWh | 21.4 mi |
Extreme Via Del Oro | San Jose, CA | 8.5 GWh | 21.5 mi |
Gap Pacific Distribution Center | Fresno, CA | 5.7 GWh | 18.7 mi |
Gilroy Power Plant | Gilroy, CA | 74.5 GWh | 0.1 mi |
Graniterock Quarry | Aromas, CA | 9.1 GWh | 9.1 mi |
Hollister Solar LLC | Hollister, CA | 3.5 GWh | 11.1 mi |
Malech Solar Farm | San Jose, CA | 5.3 GWh | 19.4 mi |
Marina Landfill Gas | Marina, CA | 34.0 GWh | 23.6 mi |
Metcalf Energy Center | San Jose, CA | 3.0 TWh | 19.2 mi |
Monterey One Water | Marina, CA | 7.8 GWh | 24.1 mi |
Monterey Regional Water Pollution Control Agency | Marina, CA | 1.1 GWh | 23.7 mi |