Gilead Foster City Solar Project

309 Velocity Way, Foster City, CA 94404

Plant Summary Information

Gilead Foster City Solar Project is ranked #637 out of 747 solar farms in California in terms of total annual net electricity generation.

Gilead Foster City Solar Project generated 497.5 MWh during the 3-month period between September 2022 to December 2022.

Plant NameGilead Foster City Solar Project
Utility NameGilead Sciences Inc. Foster City
LocationSan Mateo County, CA
Initial Operation DateApril 2021
Last Update Dec 2022
Annual Generation 1.9 GWh
Annual Consumption 7.0 k MMBtu
Ranked #9,556 out of 11,249 Power Plants Nationwide
Ranked #4,336 out of 5,158 Solar Power Plants Nationwide
Ranked #1,345 out of 1,501 California Power Plants
Ranked #637 out of 747 California Solar Power Plants
Fuel Types Solar

Map of Gilead Foster City Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilead Foster City Solar Project.

Create Your Account Today

Monthly Net Generation for Gilead Foster City Solar Project

Gilead Foster City Solar Project Details

Summary Information
Plant NameGilead Foster City Solar Project (65409)
Plant Address309 Velocity Way Foster City, CA 94404
UtilityGilead Sciences Inc. Foster City (64755)
Latitude, Longitude37.5686, -122.27797
Generation Dates on FileApr 2021 to Dec 2022
Initial Operation DateApril 2021
Annual Generation 1.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 0.48 kV
Energy StorageYes

Generator GFCS1 Details Operating April 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.9 MW
Nameplate Power Factor1
Summer Capacity0.9 MW
Winter Capacity0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle5
DC Net Capacity1.1 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.1 MW
Virtual Net Metering AgreementNo

Generator GFCS2 Details Operating April 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.2 MW
Nameplate Power Factor1
Summer Capacity0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Tilt Angle10
DC Net Capacity0.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.2 MW
Virtual Net Metering AgreementNo

Generator GFCSB Details Operating April 2021

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor1
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load12H
Energy Storage Details
Nameplate Energy Capacity MWH0.9
Maximum Charge Rate0.5 MW
Maximum Discharge Rate0.5 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating1.1
Storage Enclosure TypeCT
Excess Wind And Solar GenerationYes

Gilead Foster City Solar Project Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4326Firebaugh-CCS-PV-1Firebaugh, CA1.9 GWh
#4327Minisink CSGWesttown, NY1.9 GWh
#4328MSC-Empire01, LLCFarmington, MN1.9 GWh
#4329Novel Brooten Solar CSGBrooten, MN1.9 GWh
#4330BWC Muddy Brook, LLC HybridMendon, MA1.9 GWh
#4331Lafayette 2 - MLK Jr. Hospital (MLK)Los Angeles, CA1.9 GWh
#4332Electric Avenue Lunenburg Solar 1Lunenburg, MA1.9 GWh
#4333Solar Photovoltaic Project #16Redlands, CA1.9 GWh
#4334Hinterland CSG, LLCClearlake, MN1.9 GWh
#4335Lincoln SolarMerrillville, IN1.9 GWh
#4337Novel Wayne Solar LLC CSGMantorville, MN1.9 GWh
#4338Auriga Community SolarSlayton, MN1.9 GWh
#4339Town of Norfolk MA at Medway BranchNorfolk, MA1.9 GWh
#4340USS Haven Solar LLC CSGSt. Cloud, MN1.9 GWh
#4341Kapaa Photovoltaic ProjectKapaa, HI1.9 GWh
#4342Rushford VillageRushford Village, MN1.9 GWh
#4343Sandy Cross Solar, LLCElm City, NC1.9 GWh
#4344Romark PA SolarHazle Township, PA1.9 GWh
#4345Canandaigua Westbrook Solar ArrayCanandaigua, NY1.9 GWh
#4346FastSun 8 CSGCourtland, MN1.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Gilead Foster City Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
AlamedaAlameda, CA16.2 GWh15.2 mi
Ameresco Ox MountainHalf Moon Bay, CA93.6 GWh8.2 mi
AT&T - HaywardHayward, CA7.7 GWh11.7 mi
AT&T - Redwood CityRedwood City, CA6.6 GWh7.4 mi
City of Hayward WWTPHayward, CA11.0 GWh8.8 mi
Dynegy Oakland Power PlantOakland, CA10.0 GWh15.8 mi
Equinix Caspian Dr. Fuel CellSunnyvale, CA38.0 GWh16.3 mi
Franklin Templeton San MateoSan Mateo, CA3.1 GWh2 mi
KSR028 Merced Fuel CellSan Leandro, CA14.3 GWh11.4 mi
One Market PlazaSan Francisco, CA3.8 GWh16.8 mi
Parnassus Central Utility PlantSan Francisco, CA74.5 GWh16.6 mi
Preferred Freezer San LeandroSan Leandro, CA3.5 GWh12.1 mi
Russell City Energy CenterHayward, CA1.7 TWh9.1 mi
SF Southeast Cogen PlantSan Francisco, CA739.6 MWh13.4 mi
Shelter Creek Condominiums SolarSan Bruno, CA3.8 GWh9 mi
Silicon Valley Clean WaterRedwood City, CA7.4 GWh3.1 mi
Solar Star Palo Alto I, LLCPalo Alto, CA2.2 GWh13 mi
SRI International Cogen ProjectMenlo Park, CA29.1 GWh9.7 mi
Stanford Campus SolarStanford, CA6.8 GWh11.3 mi
Sunset Reservoir North BasinSan Francisco, CA6.5 GWh16.8 mi