Georgia-Pacific Corp - Nekoosa Mill
301 Point Basse Ave, Nekoosa, WI 54457Plant Summary Information
Georgia-Pacific Corp - Nekoosa Mill is ranked #29 out of 216 power plants in Wisconsin in terms of total annual net electricity generation.
Georgia-Pacific Corp - Nekoosa Mill is comprised of 9 generators and generated 41.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Georgia-Pacific Corp - Nekoosa Mill |
---|---|
Utility Name | Domtar Industries Inc |
Location | Wood County, WI |
Initial Operation Date | January 1912 |
Last Update | Aug 2024 |
Annual Generation | 173.0 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #2,481 out of 11,835 Power Plants Nationwide | |
Ranked #71 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #29 out of 216 Wisconsin Power Plants | |
Ranked #1 out of 4 Wisconsin Black Liquor Power Plants | |
Fuel Types | Black Liquor : 44.0% Natural Gas : 41.9% Water : 14.1% |
Map of Georgia-Pacific Corp - Nekoosa Mill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Georgia-Pacific Corp - Nekoosa Mill.
Monthly Net Generation for Georgia-Pacific Corp - Nekoosa Mill
Georgia-Pacific Corp - Nekoosa Mill Details
Summary Information | |
---|---|
Plant Name | Georgia-Pacific Corp - Nekoosa Mill (50395) |
Plant Address | 301 Point Basse Ave, Nekoosa, WI 54457 |
Utility | Domtar Industries Inc (5033) |
Latitude, Longitude | 44.3142, -89.8964 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | January 1912 |
Annual Generation | 173.0 GWh |
Fuel Types | Black Liquor : 44.0% Natural Gas : 41.9% Water : 14.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 93-113-000 |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 93-113-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | (322122) |
Sector | Industrial CHP (7) |
Water Source | Wisconsin River |
Ash Impoundment | No |
Transmission / Distribution Owner | Wisconsin Power & Light Co (20856) WI |
Grid Voltage | 690.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | WISCONSIN GAS COMPANY |
Natural Gas Storage | No |
Generator HY4 Details Operating January 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1912 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator HY1 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator HY2 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator HY3 Details Operating January 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1923 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator NHG1 Details Operating January 1926
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1926 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator HY5 Details OA January 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | OA |
First Operation Date | January 1950 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator TG6 Details Operating January 1951
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 5.7 MW |
Winter Capacity | 5.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1951 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Supercritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG8 Details Operating January 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 13 MW |
Winter Capacity | 15 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1966 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Supercritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator TG14 Details Operating February 1991
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 13.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1991 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BLQ / NG |
---|
Georgia-Pacific Corp - Nekoosa Mill Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#61 | International Paper Vicksburg Mill | Vicksburg, MS | 203.7 GWh |
#62 | WestRock (WA) | Tacoma, WA | 196.3 GWh |
#63 | Longview Fibre | Longview, WA | 170.9 GWh |
#64 | U S Alliance Coosa Pines | Coosa Pines, AL | 139.3 GWh |
#65 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#66 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#67 | International Paper Riverdale Mill | Selma, AL | 462.7 GWh |
#68 | Brunswick Cellulose | Brunswick, GA | 377.9 GWh |
#69 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#70 | Johnsonburg Mill | Johnsonburg, PA | 137.2 GWh |
#72 | Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh |
#73 | Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh |
#74 | IP Springfield Oregon | Springfield, OR | 91.2 GWh |
#75 | St Francisville Mill | St. Francisville, LA | 116.0 GWh |
#76 | Ticonderoga Mill | Ticonderoga, NY | 187.1 GWh |
#77 | Interstate Paper LLC Riceboro | Riceboro, GA | 103.9 GWh |
#78 | Mosinee Mill | Mosinee, WI | 118.3 GWh |
#79 | Georgia-Pacific Toledo Mill | Toledo, OR | 59.6 GWh |
#80 | Port Townsend Paper | Port Townsend, WA | 35.3 GWh |
#81 | Androscoggin Mill | Jay, ME | 69.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Georgia-Pacific Corp - Nekoosa Mill.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biron | Biron, WI | 24.3 GWh | 9.9 mi |
Biron Mill | Wisconsin Rapids, WI | 185.5 GWh | 9.9 mi |
Castle Rock | Adams, WI | 75.6 GWh | 31.1 mi |
Du Bay | Eau Pleine, WI | 33.2 GWh | 27.1 mi |
Marshfield Utilities Gas Plant | Marshfield, WI | 8.9 GWh | 25.1 mi |
Mosinee Mill | Mosinee, WI | 118.3 GWh | 34.3 mi |
New Lisbon | New Lisbon, WI | 50.0 MWh | 32.8 mi |
New Lisbon Solar | New Lisbon, WI | 3.9 GWh | 32.1 mi |
Petenwell | Necedah, WI | 95.5 GWh | 18.8 mi |
Port Edwards Mill | Port Edwards, WI | 36.3 GWh | 2.1 mi |
Stevens Point | Stevens Point, WI | 24.1 GWh | 20.7 mi |
Stevens Point Mill | Stevens Point, WI | 13.6 GWh | 15.7 mi |
Wautoma Solar | Wautoma, WI | 133.6 GWh | 34.2 mi |
Webster Creek (Oak 2) | New Lisbon, WI | 14.0 MWh | 33.7 mi |
Weston | Rothschild, WI | 4.0 TWh | 39.6 mi |
Weston RICE | Kronenwetter, WI | 48.9 GWh | 39.3 mi |
Whistling Winds DPC Solar | New Lisbon, WI | 2.7 GWh | 25.2 mi |
Whiting | Whiting, WI | 21.2 GWh | 19.9 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 41.3 GWh | 6.5 mi |
Wood County | Nekoosa, WI | 261.0 GWh | 4.2 mi |