Genesis Solar Energy Project
11995 Wiley's Road, Blythe, CA 92225Plant Summary Information
Genesis Solar Energy Project is ranked #31 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Genesis Solar Energy Project generated 219.5 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Genesis Solar Energy Project |
---|---|
Utility Name | Genesis Solar LLC |
Location | Riverside County, CA |
Initial Operation Date | November 2013 |
Last Update | Aug 2024 |
Annual Generation | 609.1 GWh |
Annual Consumption | 6.9 M MMBtu |
Ranked #1,075 out of 11,835 Power Plants Nationwide | |
Ranked #31 out of 5,643 Solar Power Plants Nationwide | |
Ranked #55 out of 1,569 California Power Plants | |
Ranked #11 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Genesis Solar Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Genesis Solar Energy Project.
Monthly Net Generation for Genesis Solar Energy Project
Genesis Solar Energy Project Details
Summary Information | |
---|---|
Plant Name | Genesis Solar Energy Project (57394) |
Plant Address | 11995 Wiley's Road, Blythe, CA 92225 |
Utility | Genesis Solar LLC (56723) |
Latitude, Longitude | 33.665, -114.99806 |
Generation Dates on File | Nov 2013 to Aug 2024 |
Initial Operation Date | November 2013 |
Annual Generation | 609.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Air Cooled Condensor |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN02 Details Operating November 2013
Technology | Solar Thermal without Energy Storage |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 14.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Startup Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Solar Details | |
Lenses Mirrors | Yes |
---|---|
Single Axis Tracking | Yes |
Parabolic Trough | Yes |
Generator GEN01 Details Operating March 2014
Technology | Solar Thermal without Energy Storage |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 14.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2014 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Startup Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Solar Details | |
Lenses Mirrors | Yes |
---|---|
Single Axis Tracking | Yes |
Parabolic Trough | Yes |
Genesis Solar Energy Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#21 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
#22 | Silver State Solar Power South | Primm Valley, NV | 647.5 GWh |
#23 | Texas Solar Nova 1 | Spur, TX | 640.0 GWh |
#24 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 612.2 GWh |
#25 | Arlington Energy Center II | Blythe, CA | 596.9 GWh |
#26 | Mojave Solar Project | Hinkley, CA | 624.3 GWh |
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh |
#29 | Stateline Solar | Nipton, CA | 618.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh |
#32 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#33 | Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh |
#34 | Moapa Southern Paiute | Moapa, NV | 604.0 GWh |
#35 | Bighorn Solar 1 | Pueblo, CO | 600.1 GWh |
#36 | Titan Solar Project | Van Horn, TX | 597.8 GWh |
#37 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#38 | Athos Solar Project | Desert Center, CA | 593.4 GWh |
#39 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh |
#40 | Noble Solar | Krum, TX | 575.6 GWh |
#41 | AV Solar Ranch One | Lancaster, CA | 576.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Genesis Solar Energy Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 18.5 mi |
Arlington Energy Center II | Blythe, CA | 596.9 GWh | 13 mi |
Arlington Energy Center III | Blythe, CA | 263.6 GWh | 13 mi |
Athos Solar Project | Desert Center, CA | 593.4 GWh | 21.4 mi |
Blythe Energy Inc | Blythe, CA | 1.1 TWh | 18.2 mi |
Blythe Mesa Solar II | Blythe, CA | 541.3 GWh | 18.4 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 14.8 mi |
Blythe Solar II, LLC | Blythe, CA | 329.3 GWh | 15.4 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 340.1 GWh | 14.7 mi |
Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh | 13.3 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 8.1 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 8.8 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 8.3 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 15 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 19.9 mi |
SE Athos II, LLC | Desert Center, CA | 473.9 GWh | 21.4 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 17.7 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 15.4 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 8.2 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 18.5 mi |