Genesis Alkali
580 Westvaco Road, Green River, WY 82935Plant Summary Information
Genesis Alkali is ranked #27 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Genesis Alkali is comprised of 6 generators and generated 66.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Genesis Alkali |
---|---|
Utility Name | Genesis Alkali, LLC |
Location | Sweetwater County, WY |
Initial Operation Date | June 1953 |
Last Update | Dec 2023 |
Annual Generation | 264.4 GWh |
Annual Consumption | 14.5 M MMBtu |
Ranked #1,979 out of 11,852 Power Plants Nationwide | |
Ranked #109 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #27 out of 69 Wyoming Power Plants | |
Ranked #11 out of 11 Wyoming Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 81.4% Natural Gas : 18.6% |
Previous Operators |
FMC Westvaco (2013 to 2014) Tronox (2015 to 2016) Genesis Alkali, LLC (2017 to 2023) |
Map of Genesis Alkali
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Genesis Alkali.
Monthly Net Generation for Genesis Alkali
Genesis Alkali Details
Summary Information | |
---|---|
Plant Name | Genesis Alkali (57915) |
Plant Address | 580 Westvaco Road, Green River, WY 82935 |
Utility | Genesis Alkali, LLC (61167) |
Latitude, Longitude | 41.62167, -109.81194 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | June 1953 |
Annual Generation | 264.4 GWh |
Fuel Types | Subbituminous Coal : 81.4% Natural Gas : 18.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Nonmetallic Mineral Mining and Quarrying (2123) |
Sector | Industrial CHP (7) |
Water Source | Green River |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | PacifiCorp (14354) WY |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | QUESTAR GAS COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating June 1953
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1953 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Generator 2 Details OA June 1953
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | June 1953 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Generator 3 Details Operating June 1964
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1964 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Generator 4 Details Operating June 1972
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Generator 5 Details Operating June 1975
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Generator 6 Details OA June 1975
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | June 1975 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Genesis Alkali Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#99 | Trenton Channel | Trenton, MI | 574.8 GWh |
#100 | Lon Wright | Fremont, NE | 521.6 GWh |
#101 | River Valley | Panama, OK | 536.6 GWh |
#102 | Clifty Creek | Madison, IN | 5.1 TWh |
#103 | Hardin Generator Project | Hardin, MT | 435.4 GWh |
#104 | Muskogee | Fort Gibson, OK | 2.7 TWh |
#105 | Platte | Grand Island, NE | 361.9 GWh |
#106 | Kyger Creek | Cheshire, OH | 4.7 TWh |
#107 | Archer Daniels Midland Columbus | Columbus, NE | 321.6 GWh |
#108 | Archer Daniels Midland Decatur | Decatur, IL | 627.5 GWh |
#110 | Apache Station | Cochise, AZ | 2.2 TWh |
#111 | Aurora Energy LLC Chena | Fairbanks, AK | 143.4 GWh |
#112 | American Crystal Sugar Hillsboro | Hillsboro, ND | 91.8 GWh |
#113 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh |
#114 | Biron Mill | Wisconsin Rapids, WI | 185.5 GWh |
#115 | University of Alaska Fairbanks | Fairbanks, AK | 69.1 GWh |
#116 | Utility Plants Section | Fort Wainwright, AK | 64.0 GWh |
#117 | Meramec | St. Louis, MO | 165.0 GWh |
#118 | Prairie Creek | Cedar Rapids, IA | 74.4 GWh |
#119 | American Crystal Sugar Crookston | Crookston, MN | 46.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Genesis Alkali.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Causey | South Fork, UT | 5.5 GWh | 94.7 mi |
Central Energy Plant USU | Logan, UT | 31.4 GWh | 103.6 mi |
Echo Dam | Echo, UT | 12.9 GWh | 95.7 mi |
Flaming Gorge | Dutch John, UT | 413.6 GWh | 52.9 mi |
Fontenelle | Le Barge, WY | 63.7 GWh | 30.9 mi |
General Chemical | Green River, WY | 219.6 GWh | 3.6 mi |
Hydro II | Logan, UT | 17.9 GWh | 102.1 mi |
Jim Bridger | Point of Rocks, WY | 8.3 TWh | 53.5 mi |
Mountain Wind Power II LLC | Fort Bridger, WY | 174.1 GWh | 45.3 mi |
Mountain Wind Power LLC | Fort Bridger, WY | 132.3 GWh | 41.6 mi |
Naughton | Kemmerer, WY | 3.0 TWh | 41.7 mi |
Sage Solar I-III | Randolph, UT | 136.3 GWh | 65.2 mi |
Shute Creek Facility | Kemmerer, WY | 887.5 GWh | 22.9 mi |
Simplot Phosphates | Rock Springs, WY | 96.9 GWh | 35.5 mi |
Strawberry Creek | Bedford, WY | 9.0 GWh | 104.5 mi |
Sweetwater Solar | Green River, WY | 180.5 GWh | 6.7 mi |
Swift Creek | Afton, WY | 6.3 GWh | 95.1 mi |
TransAlta Wyoming Wind | Evanston, WY | 264.6 GWh | 44.9 mi |
Uintah | Neola, UT | 6.3 GWh | 76 mi |
Wanship | Wanship, UT | 12.3 GWh | 100.7 mi |