Genentech Vacaville Meter #1
1000 New Horizons Way, Vacaville, CA 95688Plant Summary Information
Genentech Vacaville Meter #1 is ranked #277 out of 799 solar farms in California in terms of total annual net electricity generation.
Genentech Vacaville Meter #1 generated 2.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Genentech Vacaville Meter #1 |
---|---|
Utility Name | Tesla Inc. |
Location | Solano County, CA |
Initial Operation Date | May 2017 |
Last Update | Dec 2023 |
Annual Generation | 12.4 GWh |
Annual Consumption | 44.2 k MMBtu |
Ranked #5,603 out of 11,852 Power Plants Nationwide | |
Ranked #1,384 out of 5,655 Solar Power Plants Nationwide | |
Ranked #791 out of 1,570 California Power Plants | |
Ranked #277 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Genentech Vacaville Meter #1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Genentech Vacaville Meter #1.
Monthly Net Generation for Genentech Vacaville Meter #1
Genentech Vacaville Meter #1 Details
Summary Information | |
---|---|
Plant Name | Genentech Vacaville Meter #1 (60844) |
Plant Address | 1000 New Horizons Way, Vacaville, CA 95688 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 38.39076, -121.94777 |
Generation Dates on File | May 2017 to Dec 2023 |
Initial Operation Date | May 2017 |
Annual Generation | 12.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 1.00 kV |
Energy Storage | No |
Generator PV1 Details Operating May 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3.8 MW |
Summer Capacity | 3.8 MW |
Winter Capacity | 3.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 5 MW |
Virtual Net Metering Agreement | No |
Generator PV2 Details Operating May 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2.3 MW |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 4 MW |
Virtual Net Metering Agreement | No |
Genentech Vacaville Meter #1 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Dom Solar Lessor I, LP | 6800 Dumbarton Circle, Fremont, CA 94555 | Generator PV1 | 100.00% |
Dom Solar Lessor I, LP | 6800 Dumbarton Circle, Fremont, CA 94555 | Generator PV2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1374 | Pohatcong Solar Farm | Pohatcong, NJ | 12.6 GWh |
#1375 | Bremen | Bremen, IN | 12.6 GWh |
#1376 | GDIM 2, LLC | North Smithfield, RI | 12.6 GWh |
#1377 | Annandale Solar | Annandale, MN | 12.6 GWh |
#1378 | Hampton Solar I | Hampton, SC | 12.6 GWh |
#1379 | Antelope DSR 2 | Lancaster, CA | 12.6 GWh |
#1380 | Spartan PV 1, LLC | East Lansing, MI | 12.6 GWh |
#1381 | Sylvan Solar | Pillager, MN | 12.4 GWh |
#1382 | Grove Solar Center, LLC | Vale, OR | 12.4 GWh |
#1383 | Dover Sun Park | Dover, DE | 12.4 GWh |
#1385 | Delilah Road Landfill | Egg Harbor, NJ | 12.4 GWh |
#1386 | Lampwick | Hext, TX | 12.3 GWh |
#1387 | Scottsburg Solar Park | Scottsburg, IN | 12.3 GWh |
#1388 | Parkland Landfill Solar | Bordentown, NJ | 12.3 GWh |
#1389 | Union Bridge Solar | Union Bridge, MD | 12.3 GWh |
#1390 | PA Solar Park | Nesquehoning, PA | 12.3 GWh |
#1391 | PA Solar Park II | Nesquehoning, PA | 12.3 GWh |
#1392 | NorthPark Solar | Millstone, NJ | 12.2 GWh |
#1393 | Indianapolis Motor Speedway Solar PV | Indianapolis, IN | 12.2 GWh |
#1394 | Raritan Solar - 53 Highway | Raritan Township, NJ | 12.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Genentech Vacaville Meter #1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anheuser Busch - Fairfield | Fairfield, CA | 21.6 GWh | 13.3 mi |
ATT North Watney | Fairfield, CA | 6.6 GWh | 12.8 mi |
CalPeak Power Vaca Dixon Peaker Plant | Vacaville, CA | 7.2 GWh | 1.4 mi |
CDCR (CA) - Solano State Prison | Vacaville, CA | 2.3 GWh | 4.9 mi |
Creed Energy Center | Suisun, CA | 8.2 GWh | 11.4 mi |
Foundation Superior Farms | Dixon, CA | 690.0 MWh | 7.3 mi |
G2 Energy Hay Rd | Vacaville, CA | 10.8 GWh | 8.1 mi |
Goose Haven Energy Center | Suisun, CA | 15.7 GWh | 12.7 mi |
Lambie Energy Center | Suisun, CA | 14.3 GWh | 12.5 mi |
Mariani Packing Vacaville Solar | Vacaville, CA | 891.0 MWh | 1.1 mi |
Monticello Dam | Winters, CA | 32.4 GWh | 12 mi |
North Bay Solar 1 | Fairfield, CA | 1.6 GWh | 6.3 mi |
Potrero Hills Energy Producers | Suisun City, CA | 58.7 GWh | 12.1 mi |
Putah Creek Solar Farm | Winters, CA | 5.2 GWh | 9.3 mi |
Putah Creek Solar Farm North | Winters, CA | 5.2 GWh | 9.6 mi |
Solano County Cogen Plant | Fairfield, CA | 7.6 GWh | 11 mi |
Vaca Dixon Solar Station | Vacaville, CA | 3.7 GWh | 1.8 mi |
Vacaville | Vacaville, CA | 1.6 GWh | 0.9 mi |
Vacaville Hospital | Vacaville, CA | 3.0 GWh | 0.5 mi |
Wolfskill Energy Center | Fairfield, CA | 8.0 GWh | 13.2 mi |