Gates Solar Station
17115 W. Gale Ave., Huron, CA 93234Plant Summary Information
Gates Solar Station is ranked #203 out of 799 solar farms in California in terms of total annual net electricity generation.
Gates Solar Station generated 8.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gates Solar Station |
---|---|
Utility Name | Pacific Gas & Electric Co. |
Location | Fresno County, CA |
Initial Operation Date | June 2013 |
Last Update | Dec 2023 |
Annual Generation | 37.5 GWh |
Annual Consumption | 131.9 k MMBtu |
Ranked #4,244 out of 11,835 Power Plants Nationwide | |
Ranked #903 out of 5,643 Solar Power Plants Nationwide | |
Ranked #554 out of 1,569 California Power Plants | |
Ranked #203 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pacific Gas & Electric Co (2013 to 2016) Pacific Gas & Electric Co. (2017 to 2023) |
Map of Gates Solar Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gates Solar Station.
Monthly Net Generation for Gates Solar Station
Gates Solar Station Details
Summary Information | |
---|---|
Plant Name | Gates Solar Station (57892) |
Plant Address | 17115 W. Gale Ave., Huron, CA 93234 |
Utility | Pacific Gas & Electric Co. (14328) |
Latitude, Longitude | 36.17639, -120.11417 |
Generation Dates on File | Jun 2013 to Dec 2023 |
Initial Operation Date | June 2013 |
Annual Generation | 37.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GATESBK4_7_N002 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GATESBK4_7_N002 |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 27.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Gates Solar Station Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#893 | Sussex Drive, LLC | Stoney Creek, VA | 38.2 GWh |
#894 | Mt. Home Solar 1, LLC | Pocatello, ID | 38.2 GWh |
#895 | Nellis Solar PV II | North Las Vegas, NV | 38.0 GWh |
#896 | RE Rosamond Two LLC | Rosamond, CA | 38.0 GWh |
#897 | Fusion Solar Center LLC | Baltic, CT | 37.9 GWh |
#898 | Elk Hill Solar 1 | Mercersburg, PA | 37.9 GWh |
#899 | Westlands Solar PV Farm | Huron, CA | 37.8 GWh |
#900 | Caden Energix Wytheville LLC | Wytheville, VA | 37.8 GWh |
#901 | Apple Data Center - PV2 | Conover, NC | 37.8 GWh |
#902 | Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh |
#904 | Gloucester Solar | Gloucester, VA | 37.5 GWh |
#905 | O'Brien Solar Fields | Fitchburg, WI | 37.4 GWh |
#906 | Energix Nokesville, LLC | Nokesville, VA | 37.3 GWh |
#907 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 37.2 GWh |
#908 | San Joaquin Solar | Helm, CA | 37.2 GWh |
#909 | Stillwater Facility | Fallon, NV | 123.7 GWh |
#910 | Lyons Road | Owosso, MI | 36.9 GWh |
#911 | Whitetail Solar 2 | St. Thomas, PA | 36.7 GWh |
#912 | Wildwood Solar II | Wasco, CA | 36.6 GWh |
#913 | East Point Energy Center, LLC | Sharon Springs, NY | 36.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gates Solar Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Almond | Lemoore, CA | 9.6 GWh | 11.7 mi |
American Kings Solar, LLC | Lemoore, CA | 323.7 GWh | 12.8 mi |
Aquamarine | Lemoore, CA | 406.2 GWh | 11.7 mi |
CDCR (CA) - Pleasant Valley State Prison | Coalinga, CA | 2.1 GWh | 6.7 mi |
CED Avenal | Avenal, CA | 8.6 GWh | 12.6 mi |
Chestnut | Lemoore, CA | 287.1 GWh | 11.7 mi |
DSH (CA) - Coalinga State Hospital | Coalinga, CA | 4.2 GWh | 6.4 mi |
Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 318.4 GWh | 1.7 mi |
Henrietta Peaker | Lemoore, CA | 4.7 GWh | 12.5 mi |
Huron Solar Station | Huron, CA | 31.3 GWh | 4.7 mi |
Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh | 12.7 mi |
Mustang Two | Lemoore, CA | 385.4 GWh | 12.5 mi |
RE Kent South, LLC | Lemoore, CA | 40.6 GWh | 12.1 mi |
RE Mustang LLC | Lemoore, CA | 149.9 GWh | 12.2 mi |
Slate Hybrid | Stratford, CA | 656.4 GWh | 12.7 mi |
Solar Blue | Lemoore, CA | 502.3 GWh | 11.7 mi |
Van der Kooi Dairy Solar Array | Riverdale, CA | 3.9 GWh | 9.5 mi |
West Gates Solar Station | Huron, CA | 20.2 GWh | 2.6 mi |
Westlands Solar PV Farm | Huron, CA | 37.8 GWh | 3.4 mi |
Westside Solar Power PV1 | Lemoore, CA | 4.6 GWh | 11.9 mi |