Gaston Solar Power Plant
345 Neal Road, Cherryville Township, NC 28016Plant Summary Information
Gaston Solar Power Plant is ranked #48 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Gaston Solar Power Plant generated 13.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Gaston Solar Power Plant |
---|---|
Utility Name | Duke Energy Carolinas, LLC |
Location | Gaston County, NC |
Initial Operation Date | December 2020 |
Last Update | Sep 2024 |
Annual Generation | 46.9 GWh |
Annual Consumption | 175.5 k MMBtu |
Ranked #3,948 out of 11,852 Power Plants Nationwide | |
Ranked #809 out of 5,655 Solar Power Plants Nationwide | |
Ranked #101 out of 863 North Carolina Power Plants | |
Ranked #48 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Gaston Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gaston Solar Power Plant.
Monthly Net Generation for Gaston Solar Power Plant
Gaston Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Gaston Solar Power Plant (62669) |
Plant Address | 345 Neal Road, Cherryville Township, NC 28016 |
Utility | Duke Energy Carolinas, LLC (5416) |
Latitude, Longitude | 35.3224, -81.1343 |
Generation Dates on File | Dec 2020 to Sep 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 46.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 44.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 25 MW |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 36.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Gaston Solar Power Plant Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#799 | NextEra Westside PV | Five Points, CA | 47.7 GWh |
#800 | Rawhide Prairie Solar Hybrid | Wellington, CO | 47.3 GWh |
#801 | Shoreham Solar Commons | Shoreham, NY | 47.4 GWh |
#802 | Bayshore Solar A, LLC | Lancaster, CA | 47.4 GWh |
#803 | SR Odom | Moultrie, GA | 47.4 GWh |
#804 | Westmoreland County Solar Project | WARSAW, VA | 47.2 GWh |
#805 | CED Ducor 2 | Ducor, CA | 47.2 GWh |
#806 | Antelope Expansion 1B | Lancaster, CA | 46.9 GWh |
#807 | CED Ducor 4 | Ducor, CA | 46.9 GWh |
#808 | Simcoe Solar | Mountain Home, ID | 46.9 GWh |
#810 | Corcoran Solar 2 | Corcoran, CA | 46.8 GWh |
#811 | Atwell Island West Solar | Alpaugh, CA | 46.5 GWh |
#812 | Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh |
#813 | Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh |
#814 | RE Gaskell West 3 LLC | Rosamond, CA | 46.3 GWh |
#815 | Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh |
#816 | SR Arlington I | Arlington, GA | 45.9 GWh |
#817 | Antelope Big Sky Ranch | Lancaster, CA | 45.8 GWh |
#818 | SR McNeal | McNeal, AZ | 44.2 GWh |
#819 | Dover Solar | Dover, FL | 45.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gaston Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Auten Road Farm, LLC | Gastonia, NC | 9.6 GWh | 1.2 mi |
Battleground | Kings Mountain, NC | 5.4 GWh | 13.1 mi |
Cowans Ford | Stanley, NC | 136.5 GWh | 12.6 mi |
DE Solar 10240 Old Dowd Rd | Charlotte, NC | 1.4 GWh | 9.4 mi |
DE Solar 1725 Drywall Dr | Mt. Holly, NC | 796.0 MWh | 7.8 mi |
Freemont Solar Center LLC | Stanley, NC | 6.2 GWh | 10.6 mi |
G G Allen | Belmont, NC | 190.0 GWh | 11.5 mi |
Gaston County Renewable Energy Center | Dallas, NC | 21.0 GWh | 4.9 mi |
Gaston Memorial Hospital | Gastonia, NC | 33.0 MWh | 3.3 mi |
Gastonia Solar Center | Gastonia, NC | 8.1 GWh | 7.2 mi |
Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh | 4.6 mi |
High Shoals Hydro (NC) | High Shoals, NC | 3.3 GWh | 6.2 mi |
High Shoals PV1 | High Shoals, NC | 31.2 GWh | 7 mi |
Lincoln Combustion | Stanley, NC | 3.7 GWh | 9.4 mi |
Lincolnton High School | Lincolnton, NC | 21.0 MWh | 12.9 mi |
Long Creek Waste Water Plant | Dallas, NC | 433.0 MWh | 0.8 mi |
Mariposa Solar Center LLC | Stanley, NC | 9.1 GWh | 4.4 mi |
McGuire | Huntersville, NC | 19.3 TWh | 13 mi |
Mountain Island | Mount Holly, NC | 99.6 GWh | 8.4 mi |
Reventure Park | Charlotte, NC | 22.4 GWh | 7.9 mi |