Gaston Shoals
437 Dravo Rd, Blacksburg, SC 29702Plant Summary Information
Gaston Shoals is ranked #16 out of 29 hydroelectric power plants in South Carolina in terms of total annual net electricity generation.
Gaston Shoals is comprised of 4 generators and generated 3.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gaston Shoals |
---|---|
Utility Name | Northbrook Carolina Hydro II, LLC |
Location | Cherokee County, SC |
Initial Operation Date | May 1908 |
Last Update | Dec 2023 |
Annual Generation | 19.3 GWh |
Annual Consumption | 73.4 k MMBtu |
Ranked #5,097 out of 11,835 Power Plants Nationwide | |
Ranked #772 out of 1,371 Water Power Plants Nationwide | |
Ranked #78 out of 190 South Carolina Power Plants | |
Ranked #16 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Duke Energy Carolinas, LLC (2013 to 2018) Northbrook Carolina Hydro II, LLC (2019 to 2023) |
Map of Gaston Shoals
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gaston Shoals.
Monthly Net Generation for Gaston Shoals
Gaston Shoals Details
Summary Information | |
---|---|
Plant Name | Gaston Shoals (3258) |
Plant Address | 437 Dravo Rd, Blacksburg, SC 29702 |
Utility | Northbrook Carolina Hydro II, LLC (63010) |
Latitude, Longitude | 35.1381, -81.5975 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1908 |
Annual Generation | 19.3 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Broad River |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 44.00 kV |
Energy Storage | No |
Generator 5 Details Operating May 1908
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1908 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating August 1908
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1908 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating August 1908
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1908 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating August 1927
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1927 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Gaston Shoals Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#762 | Boulder | Boulder, UT | 20.2 GWh |
#763 | Shoshone (WY) | Cody, WY | 20.1 GWh |
#764 | Magic Dam Hydroelectric Project | Shoshone, ID | 20.0 GWh |
#765 | Oakdale | Monticello, IN | 20.0 GWh |
#766 | Brassua Hydroelectric Project | Rockwood, ME | 19.9 GWh |
#767 | Newport | Newport, VT | 19.8 GWh |
#768 | Clark Falls | Milton, VT | 19.8 GWh |
#769 | Deep Creek | Oakland, MD | 19.7 GWh |
#770 | Foothill Feeder | Castaic, CA | 19.6 GWh |
#771 | Fort Miller Hydroelectric Facility | Northumberland, NY | 19.5 GWh |
#773 | Power Creek | Cordova, AK | 19.2 GWh |
#774 | Verdi | Verdi, NV | 19.1 GWh |
#775 | Kansas River Project | Lawrence, KS | 19.0 GWh |
#776 | Alexander | Merrill, WI | 19.0 GWh |
#777 | Rochester 5 | Rochester, NY | 18.9 GWh |
#778 | Pioneer | Ogden, UT | 18.7 GWh |
#779 | PEC Headworks | Moses Lake, WA | 18.7 GWh |
#780 | Nacimiento Hydro Project | Bradley, CA | 18.6 GWh |
#781 | Nottely | Blairsville, GA | 18.6 GWh |
#782 | Lower Molina | Molina, CO | 18.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gaston Shoals.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.3 GWh | 6.8 mi |
99 Islands | Blacksburg, SC | 62.1 GWh | 9.4 mi |
Ayrshire | Shelby, NC | 35.4 GWh | 10.1 mi |
Beetle Solar | Mooresboro, NC | 6.0 GWh | 4.7 mi |
Broad River Energy Center | Gaffney, SC | 483.7 GWh | 4.3 mi |
Broad River Solar, LLC | Mooresboro, NC | 91.9 GWh | 9.3 mi |
Cherokee County Cogen | Gaffney, SC | 276.3 GWh | 4.6 mi |
Cherokee Falls | Blacksburg, SC | 1.5 GWh | 5.9 mi |
Cleveland Cnty Generating Facility | Kings Mountain, NC | 640.9 GWh | 10.5 mi |
County Home Solar Center, LLC | Shelby, NC | 3.3 GWh | 10 mi |
Dixon Dairy Road Solar | Kings Mountain, NC | 5.2 GWh | 11.4 mi |
Hutchinson Farm | Shelby, NC | 9.3 GWh | 9.7 mi |
James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh | 10.8 mi |
Lafayette Solar I, LLC | Shelby, NC | 3.2 GWh | 6.8 mi |
Mill Creek (SC) | Blacksburg, SC | 38.5 GWh | 9.5 mi |
Mohea Solar Energy Center, LLC | Gaffney, SC | 8.6 GWh | 3.7 mi |
Neisler Street Solar | Shelby, NC | 3.9 GWh | 10.6 mi |
Roper Farm, LLC | Grover, NC | 9.4 GWh | 9.5 mi |
Shelby Solar Energy Generation Facility | Shelby, NC | 1.1 GWh | 8 mi |
SID Solar I, LLC | Shelby, NC | 8.1 GWh | 9.8 mi |