Gaston County Renewable Energy Center
3150 Philadelphia Church Road, Dallas, NC 28034Plant Summary Information
Gaston County Renewable Energy Center is ranked #8 out of 18 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
Gaston County Renewable Energy Center is comprised of 3 generators and generated 5.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gaston County Renewable Energy Center |
---|---|
Utility Name | Gaston County Solid Waste and Recycling Division |
Location | Gaston County, NC |
Initial Operation Date | June 2011 |
Last Update | Dec 2023 |
Annual Generation | 21.0 GWh |
Annual Consumption | 297.6 k MMBtu |
Ranked #5,006 out of 11,835 Power Plants Nationwide | |
Ranked #152 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #149 out of 862 North Carolina Power Plants | |
Ranked #8 out of 18 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Gaston County Renewable Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gaston County Renewable Energy Center.
Monthly Net Generation for Gaston County Renewable Energy Center
Gaston County Renewable Energy Center Details
Summary Information | |
---|---|
Plant Name | Gaston County Renewable Energy Center (61758) |
Plant Address | 3150 Philadelphia Church Road, Dallas, NC 28034 |
Utility | Gaston County Solid Waste and Recycling Division (61382) |
Latitude, Longitude | 35.3857, -81.172 |
Generation Dates on File | Jan 2017 to Dec 2023 |
Initial Operation Date | June 2011 |
Annual Generation | 21.0 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Rutherford Elec Member Corp (16496) NC |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator GEN1 Details Operating June 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating June 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating June 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Gaston County Renewable Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Millersville LFG | Severn, MD | 22.1 GWh |
#143 | Westside Landfill Gas Recovery | Aledo, TX | 22.0 GWh |
#144 | Five Oaks Gas Recovery | Taylorville, IL | 21.9 GWh |
#145 | Oak Ridge LFGTE | Logansport, IN | 21.7 GWh |
#146 | Eagle Valley (MI) | Orion, MI | 21.6 GWh |
#147 | Energy Developments, Hancock | Findlay, OH | 21.4 GWh |
#148 | Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh |
#149 | Mesquite Creek LFGTE Project | New Braunfels, TX | 21.4 GWh |
#150 | Terry Bundy Generating Station | Lincoln, NE | 118.5 GWh |
#151 | Union Renewable Energy Facility | Enoree, SC | 21.1 GWh |
#153 | Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh |
#154 | DADS Gas Recovery | Aurora, CO | 20.6 GWh |
#155 | Oak Grove Power Producers | Arcadia, KS | 20.2 GWh |
#156 | Spruce Ridge Gas Recovery | Glencoe, MN | 20.2 GWh |
#157 | Greater New Bedford LFG Utiliz. Facility | New Bedford, MA | 19.9 GWh |
#158 | BMW Manufacturing Co | Greer, SC | 31.7 GWh |
#159 | Waste Management Crossroads LFGTE | Norridgewock, ME | 19.5 GWh |
#160 | Geneva | Geneva, OH | 19.5 GWh |
#161 | Lake Mills Gas Recovery | Lake Mills, IA | 19.2 GWh |
#162 | Ameresco Santa Cruz Energy | Watsonville, CA | 18.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gaston County Renewable Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Auten Road Farm, LLC | Gastonia, NC | 9.6 GWh | 5.9 mi |
Cherryville City Hall | Cherryville, NC | 11.0 MWh | 11.7 mi |
Cowans Ford | Stanley, NC | 136.5 GWh | 12.5 mi |
DE Solar 1725 Drywall Dr | Mt. Holly, NC | 796.0 MWh | 10.7 mi |
Freemont Solar Center LLC | Stanley, NC | 6.2 GWh | 10.3 mi |
Gaston Memorial Hospital | Gastonia, NC | 39.0 MWh | 7.9 mi |
Gaston Solar Power Plant | Cherryville Township, NC | 48.1 GWh | 4.9 mi |
Gastonia Solar Center | Gastonia, NC | 8.1 GWh | 10.9 mi |
Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh | 6.9 mi |
Haynes Farm | Lincolnton, NC | 7.8 GWh | 10.3 mi |
High Shoals Hydro (NC) | High Shoals, NC | 3.3 GWh | 1.7 mi |
High Shoals PV1 | High Shoals, NC | 31.2 GWh | 2.8 mi |
Lincoln Combustion | Stanley, NC | 3.4 GWh | 8.4 mi |
Lincolnton High School | Lincolnton, NC | 21.0 MWh | 8.1 mi |
Long Creek Waste Water Plant | Dallas, NC | 428.0 MWh | 5.4 mi |
Maiden Community Center | Maiden, NC | 30.0 MWh | 13.4 mi |
Mariposa Solar Center LLC | Stanley, NC | 9.1 GWh | 4.9 mi |
McGuire | Huntersville, NC | 19.5 TWh | 13 mi |
Mountain Island | Mount Holly, NC | 99.6 GWh | 11 mi |
Reventure Park | Charlotte, NC | 22.4 GWh | 11.6 mi |