Gary Court 1 & 2
170 Gary Court, Groton, CT 6340Plant Summary Information
Gary Court 1 & 2 is ranked #11 out of 21 distillate fuel oil power plants in Connecticut in terms of total annual net electricity generation.
Gary Court 1 & 2 is comprised of 2 generators and generated 97.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gary Court 1 & 2 |
---|---|
Utility Name | Connecticut Mun Elec Engy Coop |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | July 2010 |
Last Update | Dec 2023 |
Annual Generation | 466.0 MWh |
Annual Consumption | 5.9 k MMBtu |
Ranked #11,058 out of 11,852 Power Plants Nationwide | |
Ranked #527 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #144 out of 156 Connecticut Power Plants | |
Ranked #11 out of 21 Connecticut Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Gary Court 1 & 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gary Court 1 & 2.
Monthly Net Generation for Gary Court 1 & 2
Gary Court 1 & 2 Details
Summary Information | |
---|---|
Plant Name | Gary Court 1 & 2 (57601) |
Plant Address | 170 Gary Court, Groton, CT 6340 |
Utility | Connecticut Mun Elec Engy Coop (4180) |
Latitude, Longitude | 41.3367, -72.02 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | July 2010 |
Annual Generation | 466.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Groton Dept of Utilities - (CT) (7716) CT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator GC1 Details Operating July 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GC2 Details Operating July 2010
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Gary Court 1 & 2 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#517 | Seward (AK) | Seward, AK | 507.0 MWh |
#518 | Penobscot Energy Recovery | Orrington, ME | 31.5 GWh |
#519 | VMEA 1 Credit Gen | Manassas, VA | 499.0 MWh |
#520 | NCSU CCUP Cogeneration Plant | Raleigh, NC | 43.7 GWh |
#521 | McClure | Modesto, CA | 1.3 GWh |
#522 | Electric Avenue Facility | Culpeper, VA | 480.0 MWh |
#523 | Front Street | Chicopee, MA | 476.0 MWh |
#524 | Burlington GT | Burlington, VT | 472.0 MWh |
#525 | West Bend | West Bent, IA | 471.0 MWh |
#526 | Carthage | Carthage, MO | 1.7 GWh |
#528 | Coon Rapids II | Coon Rapids, IA | 451.0 MWh |
#529 | Vienna Operations | Vienna, MD | 2.9 GWh |
#530 | Tesoro Hawaii | Kapolei, HI | 162.7 GWh |
#531 | Meridian | Meridian, MS | 434.0 MWh |
#532 | Long Creek Waste Water Plant | Dallas, NC | 433.0 MWh |
#533 | GCWA | Texas City, TX | 433.0 MWh |
#534 | Indiana University of Pennsylvania | Indiana, PA | 14.5 GWh |
#535 | Godwin Drive Plant | Manassas, VA | 430.0 MWh |
#536 | Lost Nation | Groveton, NH | 428.0 MWh |
#537 | Ponton Diesel Generating Facility | Amelia, VA | 426.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gary Court 1 & 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antares-GRE 314 East Lyme LLC | East Lyme, CT | 4.1 GWh | 12.4 mi |
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 3.7 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 5.1 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 4.3 mi |
Connecticut College | New London, CT | 8.1 GWh | 5.3 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh | 9.9 mi |
Fishers Island 1 | Fisher's Island, NY | 119.0 MWh | 4.7 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 701.0 MWh | 10.2 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 9.9 mi |
Millstone | Waterford, CT | 16.0 TWh | 7.9 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 7.6 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 5.5 mi |
North Stonington Solar Center, LLC | North Stonington, CT | 30.9 GWh | 11 mi |
Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh | 2.7 mi |
Pfizer Groton Plant | Groton, CT | 70.3 GWh | 3.1 mi |
Rand Whitney CHP Plant | Montville, CT | 133.7 GWh | 10 mi |
Subase Microgrid Project | Groton, CT | 34.2 GWh | 5.6 mi |
Water Treatment 1 & 2 | Groton, CT | 375.0 MWh | 1.3 mi |
White Rock Road LLC | Westerly, RI | 9.8 GWh | 10.4 mi |
Yale New Haven - New London | New London, CT | 14.6 GWh | 4.4 mi |