Gardner Solar 1
760 West Street, Gardner, MA 1440Plant Summary Information
Gardner Solar 1 is ranked #306 out of 487 solar farms in Massachusetts in terms of total annual net electricity generation.
Gardner Solar 1 generated 476.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Gardner Solar 1 |
---|---|
Utility Name | Gardner Solar 1, LLC |
Location | Worcester County, MA |
Initial Operation Date | May 2014 |
Last Update | Dec 2023 |
Annual Generation | 2.8 GWh |
Annual Consumption | 10.1 k MMBtu |
Ranked #9,119 out of 11,835 Power Plants Nationwide | |
Ranked #3,962 out of 5,643 Solar Power Plants Nationwide | |
Ranked #394 out of 598 Massachusetts Power Plants | |
Ranked #306 out of 487 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Gardner Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gardner Solar 1.
Monthly Net Generation for Gardner Solar 1
Gardner Solar 1 Details
Summary Information | |
---|---|
Plant Name | Gardner Solar 1 (58937) |
Plant Address | 760 West Street, Gardner, MA 1440 |
Utility | Gardner Solar 1, LLC (58803) |
Latitude, Longitude | 42.58639, -72.03083 |
Generation Dates on File | May 2014 to Dec 2023 |
Initial Operation Date | May 2014 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 14-46 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 15.20 kV |
Energy Storage | No |
Generator GRDN1 Details Operating May 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.5 MW |
Virtual Net Metering Agreement | No |
Gardner Solar 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3952 | Colonial Pipeline Allentown Chesterfield | Chesterfield, NJ | 2.9 GWh |
#3953 | Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.9 GWh |
#3954 | CED Champaign Solar LLC | Champaign, IL | 2.9 GWh |
#3955 | O'Shea Solar Farm | Detroit, MI | 2.9 GWh |
#3956 | Mt Arlington Solar 1 LLC | Mt Arlington, NJ | 2.9 GWh |
#3957 | St. Paul Intl Airport Red & Blue Parking | St. Paul, MN | 2.9 GWh |
#3958 | City of Rochester Solar | Rochester, NY | 2.8 GWh |
#3959 | First Baptist Church of Glenarden | Upper Marlboro, MD | 2.8 GWh |
#3960 | Dynamic - Walpole | Walpole, MA | 2.8 GWh |
#3961 | Wilson Solar | Spencer, MA | 2.8 GWh |
#3963 | Galesburg Solar Array | Oquawka, IL | 2.8 GWh |
#3964 | City of Paris Solar | Paris, AR | 2.8 GWh |
#3965 | DG Tufts Knoll LLC CSG | North Grafton, MA | 2.8 GWh |
#3966 | Fairview Farms Solar | Whately, MA | 2.8 GWh |
#3967 | Limelight Solar II LLC | Spartanburg, SC | 2.8 GWh |
#3968 | Spruce - WCMD - Resh I | Hagerstown, MD | 2.8 GWh |
#3969 | Goose Lake MN DPC-GM | Albert Lea, MN | 2.8 GWh |
#3970 | Lincoln Financial Field | Philadelphia, PA | 2.8 GWh |
#3971 | Farmington Solar Farm | Farmington, MO | 2.8 GWh |
#3972 | Technology Drive Solar | Brattleboro, VT | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gardner Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
28 Livermore Hill Road Solar | Westminster, MA | 7.5 GWh | 4.7 mi |
580 River Solar | Winchendon, MA | 4.5 GWh | 6.9 mi |
Adams Farm Solar | Athol, MA | 3.5 GWh | 8.7 mi |
Barton Acres Solar, LLC CSG | Phillipston, MA | 1.7 GWh | 6.8 mi |
Clark Road Solar 1, LLC | Gardner, MA | 8.3 GWh | 0.9 mi |
Dept of Corrections NCCI Wind | Gardner, MA | 4.9 GWh | 4.5 mi |
Gardner - Otter River Road | Gardner, MA | 3.9 GWh | 1.2 mi |
Happy Hollow CSG Hybrid | Winchendon, MA | 8.0 GWh | 1.6 mi |
Integrys MA Solar, LLC - Ashburnham Site | Ashburnham, MA | 3.5 GWh | 4.6 mi |
KS Solar Six LLC | Hubbardston, MA | 2.9 GWh | 8 mi |
Mt Wachusett Community College | Gardner, MA | 3.8 GWh | 2.4 mi |
NE Renewable Fitchburg, LLC | Westminster, MA | 36.4 GWh | 9.5 mi |
Syncarpha Westminster Hybrid CSG | Westminster, MA | 6.4 GWh | 8.4 mi |
Templeton | Templeton, MA | 4.7 GWh | 4.9 mi |
TES Rowtier | Westminster, MA | 4.9 GWh | 9.4 mi |
West Street Solar 1 LLC | Gardner, MA | 8.5 GWh | 0.9 mi |
Westminster Renewables, LLC CSG | Westminster, MA | 2.5 GWh | 6.8 mi |
Williamsville Hybrid CSG | Hubbardston, MA | 7.0 GWh | 8.3 mi |
Winchendon Landfill Solar | Winchendon, MA | 3.0 GWh | 7.7 mi |
Winchendon Solar | Winchendon, MA | 2.3 GWh | 5.4 mi |