Galloway 2 Solar Farm
1096 County Road 4508, Paint Rock, TX 76933Plant Summary Information
Galloway 2 Solar Farm is ranked #71 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Galloway 2 Solar Farm generated 80.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Galloway 2 Solar Farm |
---|---|
Utility Name | 224WB 8me LLC |
Location | Concho County, TX |
Initial Operation Date | October 2023 |
Last Update | Aug 2024 |
Annual Generation | 206.0 GWh |
Annual Consumption | 703.0 k MMBtu |
Ranked #2,268 out of 11,835 Power Plants Nationwide | |
Ranked #258 out of 5,643 Solar Power Plants Nationwide | |
Ranked #390 out of 749 Texas Power Plants | |
Ranked #71 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Galloway 2 Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Galloway 2 Solar Farm.
Monthly Net Generation for Galloway 2 Solar Farm
Galloway 2 Solar Farm Details
Summary Information | |
---|---|
Plant Name | Galloway 2 Solar Farm (63343) |
Plant Address | 1096 County Road 4508, Paint Rock, TX 76933 |
Utility | 224WB 8me LLC (63118) |
Latitude, Longitude | 31.44624, -99.90297 |
Generation Dates on File | Oct 2023 to Aug 2024 |
Initial Operation Date | October 2023 |
Annual Generation | 206.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GS2SF Details Operating October 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 110 MW |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Other Solar Technology | Yes |
---|---|
DC Net Capacity | 146.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Galloway 2 Solar Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#248 | Assembly Solar II LLC | Lennon, MI | 212.7 GWh |
#249 | Escalante Solar I, LLC | Milford, UT | 212.6 GWh |
#250 | Granite Mountain Solar East, LLC | Cedar City, UT | 211.2 GWh |
#251 | Chicot Solar | Lake Village, AR | 210.7 GWh |
#252 | Escalante Solar III, LLC | Milford, UT | 209.7 GWh |
#253 | Cutlass Solar 1 LLC | Richmond, TX | 209.1 GWh |
#254 | River Ferry Solar 1 | West Union, IL | 208.6 GWh |
#255 | Searcy Solar Hybrid | Searcy, AR | 208.2 GWh |
#256 | Sigurd Solar LLC | Sigurd, UT | 207.6 GWh |
#257 | Taylor County Solar | Butler, GA | 206.7 GWh |
#259 | Hecate Energy Highland LLC | Buford, OH | 204.2 GWh |
#260 | Wagyu | Damon, TX | 202.2 GWh |
#261 | Holliday Creek Solar | Fort Dodge, IA | 202.0 GWh |
#262 | Clover Creek Solar Community Solar | Mona, UT | 200.0 GWh |
#263 | Point Beach Solar | Two Creeks, WI | 198.6 GWh |
#264 | Pioneer Solar (CO), LLC | Bennett, CO | 198.0 GWh |
#265 | SR Arlington II | Blakely, GA | 197.2 GWh |
#266 | OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh |
#267 | Techren Solar I LLC | Boulder, NV | 196.8 GWh |
#268 | Coniglio Solar | Wolfe City, TX | 196.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Galloway 2 Solar Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aviator Wind | Robert Lee, TX | 1.8 TWh | 52.5 mi |
Bluebell Solar | Sterling City, TX | 72.0 GWh | 61.8 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 59.3 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 60.5 mi |
Cactus Flats Wind Energy Project | Eden, TX | 441.9 GWh | 24.2 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 59.7 mi |
Concho Valley Solar, LLC | San Angelo, TX | 293.4 GWh | 26.3 mi |
Galloway 1 Solar Farm | Paint Rock, TX | 496.6 GWh | 6.3 mi |
Heart of Texas Wind Project | Brady, TX | 606.0 GWh | 31.7 mi |
Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh | 47.9 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 53.8 mi |
IP Radian, LLC | Brookesmith, TX | 687.2 GWh | 42.8 mi |
Lampwick | Hext, TX | 12.3 GWh | 45.2 mi |
Langford Wind Power | Christoval, TX | 587.5 GWh | 52.2 mi |
Live Oak Wind Project | Eldorado, TX | 750.3 GWh | 50.6 mi |
Maverick Creek Wind | Eden, TX | 1.4 TWh | 13.2 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 61.1 mi |
Rambler | San Angelo, TX | 441.1 GWh | 41.4 mi |
Rattlesnake Power, LLC | Brady, TX | 548.9 GWh | 21.6 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh | 56.2 mi |