725 Front Street, Chicopee, MA 1020Plant Summary Information
Front Street is ranked #18 out of 33 distillate fuel oil power plants in Massachusetts in terms of total annual net electricity generation.
Front Street is comprised of 3 generators and generated 96.6 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Front Street |
---|---|
Utility Name | City of Chicopee - (MA) |
Location | Hampden County, MA |
Initial Operation Date | January 1978 |
Last Update | Dec 2023 |
Annual Generation | 476.0 MWh |
Annual Consumption | 8.1 k MMBtu |
Ranked #11,037 out of 11,835 Power Plants Nationwide | |
Ranked #523 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #585 out of 598 Massachusetts Power Plants | |
Ranked #18 out of 33 Massachusetts Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Front Street
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Front Street.
Monthly Net Generation for Front Street
Front Street Details
Summary Information | |
---|---|
Plant Name | Front Street (7396) |
Plant Address | 725 Front Street, Chicopee, MA 1020 |
Utility | City of Chicopee - (MA) (3477) |
Latitude, Longitude | 42.1483, -72.5911 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | January 1978 |
Annual Generation | 476.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Chicopee - (MA) (3477) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 1 Details Operating January 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating January 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating January 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Front Street Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#513 | False Island | Thorne Bay, AK | 513.0 MWh |
#514 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#515 | Seward (AK) | Seward, AK | 507.0 MWh |
#516 | Penobscot Energy Recovery | Orrington, ME | 31.5 GWh |
#517 | Indiana University of Pennsylvania | Indiana, PA | 18.3 GWh |
#518 | W S Lee | Williamston, SC | 5.9 TWh |
#519 | VMEA 1 Credit Gen | Manassas, VA | 499.0 MWh |
#520 | NCSU CCUP Cogeneration Plant | Raleigh, NC | 43.7 GWh |
#521 | McClure | Modesto, CA | 1.3 GWh |
#522 | Electric Avenue Facility | Culpeper, VA | 480.0 MWh |
#524 | Burlington GT | Burlington, VT | 472.0 MWh |
#525 | West Bend | West Bent, IA | 471.0 MWh |
#526 | Carthage | Carthage, MO | 1.7 GWh |
#527 | Somerset Plant | Skowhegan, ME | 485.5 GWh |
#528 | Gary Court 1 & 2 | Groton, CT | 466.0 MWh |
#529 | Coon Rapids II | Coon Rapids, IA | 451.0 MWh |
#530 | Vienna Operations | Vienna, MD | 2.9 GWh |
#531 | Cope | Cope, SC | 1.7 TWh |
#532 | Meridian | Meridian, MS | 434.0 MWh |
#533 | GCWA | Texas City, TX | 433.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Front Street.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 14.1 GWh | 3 mi |
Boatlock | Holyoke, MA | 21.3 GWh | 4.2 mi |
Cabot Holyoke | Holyoke, MA | 6.1 GWh | 3.7 mi |
CED Chicopee Solar | Chicopee, MA | 4.9 GWh | 4.4 mi |
Chemical | Holyoke, MA | 7.4 GWh | 3.2 mi |
Chicopee | Chicopee, MA | 2.5 GWh | 4.7 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.4 GWh | 0.7 mi |
Chicopee River Solar | Springfield, MA | 3.0 GWh | 2 mi |
Chicopee Solar | Chicopee, MA | 4.5 GWh | 2.6 mi |
Citizens Agawam Landfill Solar | Agawam, MA | 2.8 GWh | 3.8 mi |
Cottage Street Solar Facility | Springfield, MA | 2.7 GWh | 2.7 mi |
Dwight | Chicopee, MA | 9.8 GWh | 1 mi |
East Springfield Solar PV | Springfield, MA | 1.9 GWh | 2.2 mi |
Hadley Falls | Holyoke, MA | 218.2 GWh | 4.4 mi |
Indian Orchard | Indian Orchard, MA | 10.6 GWh | 4.4 mi |
Indian Orchard PV Facility | Springfield, MA | 3.4 GWh | 4.7 mi |
Masspower | Indian Orchard, MA | 609.1 GWh | 3.6 mi |
Riverside Holyoke | Holyoke, MA | 40.4 GWh | 3.6 mi |
Smith & Wesson at Springfield MA PV | Springfield, MA | 2.3 GWh | 2.2 mi |
Springfield Solar PV | Springfield, MA | 6.2 GWh | 2.3 mi |