Friant Hydro Facility
18015 Friant Rd, Friant, CA 93626Plant Summary Information
Friant Hydro Facility is ranked #68 out of 214 hydroelectric power plants in California in terms of total annual net electricity generation.
Friant Hydro Facility is comprised of 4 generators and generated 20.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Friant Hydro Facility |
---|---|
Utility Name | Friant Power Authority |
Location | Fresno County, CA |
Initial Operation Date | April 1985 |
Last Update | Dec 2022 |
Annual Generation | 75.7 GWh |
Annual Consumption | 271.1 k MMBtu |
Ranked #3,392 out of 11,249 Power Plants Nationwide | |
Ranked #409 out of 1,354 Water Power Plants Nationwide | |
Ranked #385 out of 1,501 California Power Plants | |
Ranked #68 out of 214 California Water Power Plants | |
Fuel Types | Water |
Map of Friant Hydro Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Friant Hydro Facility.
Monthly Net Generation for Friant Hydro Facility
Friant Hydro Facility Details
Summary Information | |
---|---|
Plant Name | Friant Hydro Facility (50393) |
Plant Address | 18015 Friant Rd Friant, CA 93626 |
Utility | Friant Power Authority (25438) |
Latitude, Longitude | 36.99769, -119.70345 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | April 1985 |
Annual Generation | 75.7 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | San Joaquin River |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 70.00 kV |
Energy Storage | No |
Generator RO1 Details Operating April 1985
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Nameplate Power Factor | 0.84 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1985 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator M1 Details Operating July 1985
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 9.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 9.8 MW |
Winter Capacity | 9.8 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1985 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator FR1 Details Operating January 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 18.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1986 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator RO2 Details Operating June 2017
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 6.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 7.3 MW |
Winter Capacity | 7.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Friant Hydro Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#399 | Thorpe | Tuckasegee, NC | 78.5 GWh |
#400 | Post Falls | Post Falls, ID | 78.4 GWh |
#401 | Allegheny Hydro No 8 | Adrian, PA | 78.4 GWh |
#402 | Murray | North Little Rock, AR | 78.3 GWh |
#403 | West Point PH | Pioneer, CA | 77.8 GWh |
#404 | Kings River PH | Balch Camp, CA | 77.5 GWh |
#405 | Roosevelt | Roosevelt, AZ | 77.4 GWh |
#406 | Wallenpaupack | Drumore, PA | 76.4 GWh |
#407 | Lloyd Shoals | Jackson, GA | 76.2 GWh |
#408 | Butt Valley | Belden, CA | 75.7 GWh |
#410 | Sheldon Springs Hydroelectric | Sheldon Springs, VT | 75.3 GWh |
#411 | Lawrence Hydroelectric Associates | Lawrence, MA | 74.6 GWh |
#412 | Piney | Clarion, PA | 73.4 GWh |
#413 | Stevenson | Monroe, CT | 73.1 GWh |
#414 | Williams Hydro | Solon, ME | 73.0 GWh |
#415 | Narrows PH | Grass Valley, CA | 71.8 GWh |
#416 | Sand Bar Power Plant | Stanislaus Ntl. Fores, CA | 71.7 GWh |
#417 | Union Valley | Fresh Pond, CA | 71.6 GWh |
#418 | Tesla | Colorado Springs, CO | 70.6 GWh |
#419 | Upper Falls | Spokane, WA | 70.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Friant Hydro Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A G Wishon | North Fork, CA | 26.9 GWh | 15.2 mi |
Big Creek 4 | North Fork, CA | 542.0 GWh | 15.3 mi |
Borden Solar Farm | Madera, CA | 130.8 GWh | 14.7 mi |
Clovis East High School | Clovis, CA | 1.6 GWh | 14.1 mi |
Clovis High School | Clovis, CA | 1.5 GWh | 12.5 mi |
Clovis North High School | Fresno, CA | 1.6 GWh | 7.7 mi |
CSU Fresno Solar Project | Fresno, CA | 635.0 MWh | 13.1 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.3 GWh | 13.7 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.2 GWh | 13 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.6 GWh | 18.2 mi |
Kerckhoff 2 | Auberry, CA | 66.6 GWh | 9.5 mi |
Madera Community Hospital | Madera, CA | 1.9 GWh | 19.3 mi |
OK Produce Fresno Carport | Fresno, CA | 1.6 GWh | 19.3 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.8 GWh | 15.8 mi |
Saint Agnes Medical Center | Fresno, CA | 32.0 GWh | 11.8 mi |
San Joaquin 2 | North Fork, CA | 1.4 GWh | 18.2 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.2 GWh | 7.9 mi |
SCCCD - Fresno Community College | Fresno, CA | 4.0 GWh | 16.8 mi |
Sealed Air Madera Solar Project | Madera, CA | 2.0 MWh | 19.8 mi |
Site 980 65 | Madera, CA | 715.7 MWh | 11.6 mi |