Fresno Sunnyside High School Hybrid
1019 S Peach Avenue, Fresno, CA 93727Plant Summary Information
Fresno Sunnyside High School Hybrid is ranked #577 out of 799 solar farms in California in terms of total annual net electricity generation.
Fresno Sunnyside High School Hybrid generated 379.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Fresno Sunnyside High School Hybrid |
---|---|
Utility Name | Forefront Power, LLC |
Location | Fresno County, CA |
Initial Operation Date | December 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.5 GWh |
Annual Consumption | 9.0 k MMBtu |
Ranked #9,396 out of 11,852 Power Plants Nationwide | |
Ranked #4,182 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,308 out of 1,570 California Power Plants | |
Ranked #577 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Fresno Sunnyside High School Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Sunnyside High School Hybrid.
Monthly Net Generation for Fresno Sunnyside High School Hybrid
Fresno Sunnyside High School Hybrid Details
Summary Information | |
---|---|
Plant Name | Fresno Sunnyside High School Hybrid (63422) |
Plant Address | 1019 S Peach Avenue, Fresno, CA 93727 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.73401, -119.71781 |
Generation Dates on File | Dec 2020 to Dec 2023 |
Initial Operation Date | December 2020 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-391-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | Yes |
Generator 1122 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
East West Fixed Tilt | Yes |
Azimuth Angle | 270 |
Tilt Angle | 7 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.7 MW |
Virtual Net Metering Agreement | No |
Generator BA112 Details Operating December 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.3 |
---|---|
Maximum Charge Rate | 0.3 MW |
Maximum Discharge Rate | 0.3 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.2 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 63422 |
Direct Support Gen Id | 1122 |
Support T D Asset | No |
Fresno Sunnyside High School Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4172 | Washington Solar (SC) | Mullins, SC | 2.5 GWh |
#4173 | Broadway 3 - UCSB Lot 38 | Santa Barbara, CA | 2.5 GWh |
#4174 | Dartmouth Solar | Dartmouth, MA | 2.5 GWh |
#4175 | Acushnet-Braley Road 1 | Freetown, MA | 2.5 GWh |
#4176 | Cenergy - Wiscasset (CSG) | Wiscasset, ME | 2.5 GWh |
#4177 | 46 Meadowlands Parkway | Secaucus, NJ | 2.5 GWh |
#4178 | IGS Solar I - BWI2 | Baltimore, MD | 2.5 GWh |
#4179 | Skalbeck Solar | Sacred Heart, MN | 2.5 GWh |
#4180 | Windsor Floating Solar | Windsor, CA | 2.5 GWh |
#4181 | Whittier | Ogden, NY | 2.5 GWh |
#4183 | Open View Solar Farm | New Haven, VT | 2.5 GWh |
#4184 | Bell Bay Solar Farm | Conway, SC | 2.5 GWh |
#4185 | Heliocentric | Palmdale, CA | 2.5 GWh |
#4186 | Spring Hill Road | Barre, MA | 2.5 GWh |
#4187 | RV CSU Power LLC | Fort Collins, CO | 2.5 GWh |
#4188 | Lebanon Solar | Glen Gardner, NJ | 2.5 GWh |
#4189 | Lineage Logistics Solar | University Park, IL | 2.5 GWh |
#4190 | Warren County Solar | Belvidere, NJ | 2.5 GWh |
#4191 | Bethlehem Solar | New Scotland, NY | 2.5 GWh |
#4192 | Legoland Solar | Winter Haven, FL | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fresno Sunnyside High School Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Algonquin Power Sanger LLC | Sanger, CA | 8.3 GWh | 9.8 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh | 5.1 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 6.2 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 6.1 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 10.8 mi |
CSU Fresno Solar Project | Fresno, CA | 1.1 GWh | 5.4 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.2 GWh | 7.8 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.1 GWh | 6.5 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 15.4 mi |
Kingsburg Cogen | Kingsburg, CA | 4.6 GWh | 15.5 mi |
La Joya Del Sol | Fresno, CA | 89.3 MWh | 5.8 mi |
Malaga Power LLC | Fresno, CA | 10.8 GWh | 3.3 mi |
National Raisin | Fowler, CA | 4.8 GWh | 8 mi |
OK Produce Fresno Carport | Fresno, CA | 3.1 GWh | 3.2 mi |
POM Plant 1 | Del Rey, CA | 2.1 GWh | 9 mi |
POM Plant 2 | Del Rey, CA | 292.0 MWh | 8.8 mi |
Rio Bravo Fresno | Fresno, CA | 145.1 GWh | 3.1 mi |
Saint Agnes Medical Center | Fresno, CA | 25.5 GWh | 7.5 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 10.5 mi |
SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 5 mi |