Fresno Sunnyside High School Hybrid
1019 S Peach Avenue, Fresno, CA 93727Plant Summary Information
Fresno Sunnyside High School Hybrid is ranked #558 out of 747 solar farms in California in terms of total annual net electricity generation.
Fresno Sunnyside High School Hybrid generated 670.2 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Fresno Sunnyside High School Hybrid |
---|---|
Utility Name | Forefront Power, LLC |
Location | Fresno County, CA |
Initial Operation Date | December 2020 |
Last Update | Dec 2022 |
Annual Generation | 2.6 GWh |
Annual Consumption | 9.5 k MMBtu |
Ranked #9,047 out of 11,249 Power Plants Nationwide | |
Ranked #3,898 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,253 out of 1,501 California Power Plants | |
Ranked #558 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Fresno Sunnyside High School Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Sunnyside High School Hybrid.
Monthly Net Generation for Fresno Sunnyside High School Hybrid
Fresno Sunnyside High School Hybrid Details
Summary Information | |
---|---|
Plant Name | Fresno Sunnyside High School Hybrid (63422) |
Plant Address | 1019 S Peach Avenue Fresno, CA 93727 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.73401, -119.71781 |
Generation Dates on File | Dec 2020 to Dec 2022 |
Initial Operation Date | December 2020 |
Annual Generation | 2.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-391-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | Yes |
Generator 1122 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
East West Fixed Tilt | Yes |
Azimuth Angle | 270 |
Tilt Angle | 7 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.7 MW |
Virtual Net Metering Agreement | No |
Generator BA112 Details Operating December 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.3 |
---|---|
Maximum Charge Rate | 0.3 MW |
Maximum Discharge Rate | 0.3 MW |
Storage Technology | LIB |
Storage Enclosure Type | CS |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | Yes |
Fresno Sunnyside High School Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3888 | Schultz CSG | Webster, MN | 2.6 GWh |
#3889 | Kearsarge Johnstown 1 CSG | Johnstown, NY | 2.6 GWh |
#3890 | Macedon | Macedon, NY | 2.6 GWh |
#3891 | Chesapeake College | Wye Mills, MD | 2.6 GWh |
#3892 | Onondaga County- Jamesville | Jamesville, NY | 2.6 GWh |
#3893 | Division 1 | Lancaster, CA | 2.6 GWh |
#3894 | 5601 Westside CDG | North Bergen, NJ | 2.6 GWh |
#3895 | Barton Solar Farm | Barton, VT | 2.6 GWh |
#3896 | North Bergen Solar | North Bergen, NJ | 2.6 GWh |
#3897 | RIT Henrietta Solar 1, LLC | Rochester, NY | 2.6 GWh |
#3899 | Hadley 3 Solar (North) | Hadley, MA | 2.6 GWh |
#3900 | CBP Solar | Buchanan, NY | 2.6 GWh |
#3901 | Frey Rd #1 Community Solar Farm | Macedon, NY | 2.6 GWh |
#3902 | Route 57 Solar | Agawam, MA | 2.6 GWh |
#3903 | Cedar Falls Solar Farm | Cedar Falls, IA | 2.6 GWh |
#3904 | Buffalo NY GigaFactory | Buffalo, NY | 2.6 GWh |
#3905 | DeGraff Butler Electric | Burns, KS | 2.6 GWh |
#3906 | Oswego County - Fulton Solar | Fulton, NY | 2.6 GWh |
#3907 | Berkshire 1 | Sheffield, MA | 2.6 GWh |
#3908 | Oneida - South | Whitestown, NY | 2.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fresno Sunnyside High School Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2081 Terzian Solar Project | Reedley, CA | 3.1 GWh | 17.3 mi |
Algonquin Power Sanger LLC | Sanger, CA | 3.2 GWh | 9.8 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 6.3 GWh | 5.1 mi |
Clovis East High School | Clovis, CA | 1.6 GWh | 6.2 mi |
Clovis High School | Clovis, CA | 1.5 GWh | 6.1 mi |
Clovis North High School | Fresno, CA | 1.6 GWh | 10.8 mi |
CSU Fresno Solar Project | Fresno, CA | 635.0 MWh | 5.4 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.3 GWh | 7.8 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.2 GWh | 6.5 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 15.4 mi |
La Joya Del Sol | Fresno, CA | 127.1 MWh | 5.8 mi |
Malaga Power LLC | Fresno, CA | 10.0 GWh | 3.3 mi |
Moonlight Packing - Phase 2 | Reedley, CA | 2.9 GWh | 17.1 mi |
National Raisin | Fowler, CA | 5.1 GWh | 8 mi |
OK Produce Fresno Carport | Fresno, CA | 1.6 GWh | 3.2 mi |
Reedley Community College Solar | Reedley, CA | 4.1 GWh | 16.9 mi |
Rio Bravo Fresno | Fresno, CA | 149.8 GWh | 3.1 mi |
Saint Agnes Medical Center | Fresno, CA | 32.0 GWh | 7.5 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.2 GWh | 10.5 mi |
SCCCD - Fresno Community College | Fresno, CA | 4.0 GWh | 5 mi |