Fresno Sunnyside High School Hybrid

1019 S Peach Avenue, Fresno, CA 93727

Plant Summary Information

Fresno Sunnyside High School Hybrid is ranked #558 out of 747 solar farms in California in terms of total annual net electricity generation.

Fresno Sunnyside High School Hybrid generated 670.2 MWh during the 3-month period between September 2022 to December 2022.

Plant NameFresno Sunnyside High School Hybrid
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateDecember 2020
Last Update Dec 2022
Annual Generation 2.6 GWh
Annual Consumption 9.5 k MMBtu
Ranked #9,047 out of 11,249 Power Plants Nationwide
Ranked #3,898 out of 5,158 Solar Power Plants Nationwide
Ranked #1,253 out of 1,501 California Power Plants
Ranked #558 out of 747 California Solar Power Plants
Fuel Types Solar

Map of Fresno Sunnyside High School Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Sunnyside High School Hybrid.

Create Your Account Today

Monthly Net Generation for Fresno Sunnyside High School Hybrid

Fresno Sunnyside High School Hybrid Details

Summary Information
Plant NameFresno Sunnyside High School Hybrid (63422)
Plant Address1019 S Peach Avenue Fresno, CA 93727
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.73401, -119.71781
Generation Dates on FileDec 2020 to Dec 2022
Initial Operation DateDecember 2020
Annual Generation 2.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number22-391-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageYes

Generator 1122 Details Operating December 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
East West Fixed TiltYes
Azimuth Angle270
Tilt Angle7
DC Net Capacity1.7 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.7 MW
Virtual Net Metering AgreementNo

Generator BA112 Details Operating December 2020

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.3 MW
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Energy Storage Details
Nameplate Energy Capacity MWH0.3
Maximum Charge Rate0.3 MW
Maximum Discharge Rate0.3 MW
Storage TechnologyLIB
Storage Enclosure TypeCS
System Peak ShavingYes
Excess Wind And Solar GenerationYes

Fresno Sunnyside High School Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3888Schultz CSGWebster, MN2.6 GWh
#3889Kearsarge Johnstown 1 CSGJohnstown, NY2.6 GWh
#3890MacedonMacedon, NY2.6 GWh
#3891Chesapeake CollegeWye Mills, MD2.6 GWh
#3892Onondaga County- JamesvilleJamesville, NY2.6 GWh
#3893Division 1Lancaster, CA2.6 GWh
#38945601 Westside CDGNorth Bergen, NJ2.6 GWh
#3895Barton Solar FarmBarton, VT2.6 GWh
#3896North Bergen SolarNorth Bergen, NJ2.6 GWh
#3897RIT Henrietta Solar 1, LLCRochester, NY2.6 GWh
#3899Hadley 3 Solar (North)Hadley, MA2.6 GWh
#3900CBP SolarBuchanan, NY2.6 GWh
#3901Frey Rd #1 Community Solar FarmMacedon, NY2.6 GWh
#3902Route 57 SolarAgawam, MA2.6 GWh
#3903Cedar Falls Solar FarmCedar Falls, IA2.6 GWh
#3904Buffalo NY GigaFactoryBuffalo, NY2.6 GWh
#3905DeGraff Butler ElectricBurns, KS2.6 GWh
#3906Oswego County - Fulton SolarFulton, NY2.6 GWh
#3907Berkshire 1Sheffield, MA2.6 GWh
#3908Oneida - SouthWhitestown, NY2.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Fresno Sunnyside High School Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
2081 Terzian Solar ProjectReedley, CA3.1 GWh17.3 mi
Algonquin Power Sanger LLCSanger, CA3.2 GWh9.8 mi
CA - Fresno County - Juvenile HallFresno, CA6.3 GWh5.1 mi
Clovis East High SchoolClovis, CA1.6 GWh6.2 mi
Clovis High SchoolClovis, CA1.5 GWh6.1 mi
Clovis North High SchoolFresno, CA1.6 GWh10.8 mi
CSU Fresno Solar ProjectFresno, CA635.0 MWh5.4 mi
Fresno Bullard High School HybridFresno, CA2.3 GWh7.8 mi
Fresno Hoover High School HybridFresno, CA2.2 GWh6.5 mi
Kings River SyphonSanger, CA1.3 GWh15.4 mi
La Joya Del SolFresno, CA127.1 MWh5.8 mi
Malaga Power LLCFresno, CA10.0 GWh3.3 mi
Moonlight Packing - Phase 2Reedley, CA2.9 GWh17.1 mi
National RaisinFowler, CA5.1 GWh8 mi
OK Produce Fresno CarportFresno, CA1.6 GWh3.2 mi
Reedley Community College SolarReedley, CA4.1 GWh16.9 mi
Rio Bravo FresnoFresno, CA149.8 GWh3.1 mi
Saint Agnes Medical CenterFresno, CA32.0 GWh7.5 mi
SCCCD - Clovis Community CollegeFresno, CA2.2 GWh10.5 mi
SCCCD - Fresno Community CollegeFresno, CA4.0 GWh5 mi