Fresno Sunnyside High School Hybrid

1019 S Peach Avenue, Fresno, CA 93727

Plant Summary Information

Fresno Sunnyside High School Hybrid is ranked #585 out of 807 solar farms in California in terms of total annual net electricity generation.

Fresno Sunnyside High School Hybrid generated 379.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameFresno Sunnyside High School Hybrid
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateDecember 2020
Last Update Dec 2023
Annual Generation 2.5 GWh
Annual Consumption 9.0 k MMBtu
Ranked #9,514 out of 11,979 Power Plants Nationwide
Ranked #4,292 out of 5,765 Solar Power Plants Nationwide
Ranked #1,314 out of 1,578 California Power Plants
Ranked #585 out of 807 California Solar Power Plants
Fuel Types Solar

Map of Fresno Sunnyside High School Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Sunnyside High School Hybrid.

Create Your Account Today

Monthly Net Generation for Fresno Sunnyside High School Hybrid

32032024024016016080800020212021Jul '21Jul '2120222022Jul '22Jul '2220232023Jul '23Jul '23
Download SVG
Download PNG
Download CSV

Fresno Sunnyside High School Hybrid Details

Summary Information
Plant NameFresno Sunnyside High School Hybrid (63422)
Plant Address1019 S Peach Avenue, Fresno, CA 93727
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.73401, -119.71781
Generation Dates on FileDec 2020 to Dec 2023
Initial Operation DateDecember 2020
Annual Generation 2.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number22-391-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageYes

Generator 1122 Details Operating December 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
East West Fixed TiltYes
Azimuth Angle270
Tilt Angle7
DC Net Capacity1.7 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.7 MW
Virtual Net Metering AgreementNo

Generator BA112 Details Operating December 2020

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.3 MW
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Energy Storage Details
Nameplate Energy Capacity MWH0.3
Maximum Charge Rate0.3 MW
Maximum Discharge Rate0.3 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.2
Storage Enclosure TypeCS
System Peak ShavingP
Excess Wind And Solar GenerationYes
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id63422
Direct Support Gen Id1122
Support T D AssetNo

Fresno Sunnyside High School Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4282Washington Solar (SC)Mullins, SC2.5 GWh
#4283Dartmouth SolarDartmouth, MA2.5 GWh
#4284Broadway 3 - UCSB Lot 38Santa Barbara, CA2.5 GWh
#4285Acushnet-Braley Road 1Freetown, MA2.5 GWh
#4286Cenergy - Wiscasset (CSG)Wiscasset, ME2.5 GWh
#428746 Meadowlands ParkwaySecaucus, NJ2.5 GWh
#4288IGS Solar I - BWI2Baltimore, MD2.5 GWh
#4289Skalbeck SolarSacred Heart, MN2.5 GWh
#4290Windsor Floating SolarWindsor, CA2.5 GWh
#4291WhittierOgden, NY2.5 GWh
#4293Open View Solar FarmNew Haven, VT2.5 GWh
#4294Bell Bay Solar FarmConway, SC2.5 GWh
#4295HeliocentricPalmdale, CA2.5 GWh
#4296RV CSU Power LLCFort Collins, CO2.5 GWh
#4297Lebanon SolarGlen Gardner, NJ2.5 GWh
#4298Lineage Logistics SolarUniversity Park, IL2.5 GWh
#4299Warren County SolarBelvidere, NJ2.5 GWh
#4300Bethlehem SolarNew Scotland, NY2.5 GWh
#4301Legoland SolarWinter Haven, FL2.5 GWh
#4302Weber State University - Davis Campus PVLayton, UT2.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Fresno Sunnyside High School Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Algonquin Power Sanger LLCSanger, CA10.0 GWh9.8 mi
CA - Fresno County - Juvenile HallFresno, CA5.4 GWh5.1 mi
Clovis East High SchoolClovis, CA1.4 GWh6.2 mi
Clovis High SchoolClovis, CA1.3 GWh6.1 mi
Clovis North High SchoolFresno, CA1.4 GWh10.8 mi
CSU Fresno Solar ProjectFresno, CA1.1 GWh5.4 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh7.8 mi
Fresno Hoover High School HybridFresno, CA2.1 GWh6.5 mi
Kings River SyphonSanger, CA1.3 GWh15.4 mi
Kingsburg CogenKingsburg, CA4.6 GWh15.5 mi
La Joya Del SolFresno, CA89.3 MWh5.8 mi
Malaga Power LLCFresno, CA13.4 GWh3.3 mi
National RaisinFowler, CA4.8 GWh8 mi
OK Produce Fresno CarportFresno, CA3.1 GWh3.2 mi
POM Plant 1Del Rey, CA2.1 GWh9 mi
POM Plant 2Del Rey, CA292.0 MWh8.8 mi
Rio Bravo FresnoFresno, CA145.1 GWh3.1 mi
Saint Agnes Medical CenterFresno, CA25.4 GWh7.5 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh10.5 mi
SCCCD - Fresno Community CollegeFresno, CA3.8 GWh5 mi