Fresno Hoover High School Hybrid
5550 N First Street, Fresno, CA 93710Plant Summary Information
Fresno Hoover High School Hybrid is ranked #628 out of 799 solar farms in California in terms of total annual net electricity generation.
Fresno Hoover High School Hybrid generated 327.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Fresno Hoover High School Hybrid |
---|---|
Utility Name | Forefront Power, LLC |
Location | Fresno County, CA |
Initial Operation Date | March 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.1 GWh |
Annual Consumption | 7.4 k MMBtu |
Ranked #9,791 out of 11,835 Power Plants Nationwide | |
Ranked #4,552 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,353 out of 1,569 California Power Plants | |
Ranked #628 out of 799 California Solar Power Plants | |
Fuel Types | Solar : 99.3% Electricity used for energy storage : 0.7% |
Map of Fresno Hoover High School Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Hoover High School Hybrid.
Monthly Net Generation for Fresno Hoover High School Hybrid
Fresno Hoover High School Hybrid Details
Summary Information | |
---|---|
Plant Name | Fresno Hoover High School Hybrid (63421) |
Plant Address | 5550 N First Street, Fresno, CA 93710 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.81782, -119.77071 |
Generation Dates on File | Mar 2020 to Dec 2023 |
Initial Operation Date | March 2020 |
Annual Generation | 2.1 GWh |
Fuel Types | Solar : 99.3% Electricity used for energy storage : 0.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-388-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | Yes |
Generator 291 Details Operating March 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
East West Fixed Tilt | Yes |
Azimuth Angle | 270 |
Tilt Angle | 7 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.4 MW |
Virtual Net Metering Agreement | No |
Generator BA291 Details Operating March 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.2 |
---|---|
Maximum Charge Rate | 0.2 MW |
Maximum Discharge Rate | 0.2 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.2 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 63421 |
Direct Support Gen Id | 291 |
Support T D Asset | No |
Fresno Hoover High School Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4542 | Sue Cleveland High School | Rio Rancho, NM | 2.1 GWh |
#4543 | Nexamp Peak CSG | Hancock, MA | 2.1 GWh |
#4544 | CU Solar Plant | Cedarville, OH | 2.1 GWh |
#4545 | Sacramento (SMUD) | Sacramento, CA | 2.1 GWh |
#4546 | IGS Solar I - BWI5 | Baltimore, MD | 2.1 GWh |
#4547 | USS KVPV Solar LLC CSG | Fulton, MN | 2.1 GWh |
#4548 | AES Pelletier Solar, LLC | Fort Kent, ME | 2.1 GWh |
#4549 | Bloomfield Municipal Utilities Solar | Bloomfield, IA | 2.1 GWh |
#4550 | Grossmont HS Solar Project | El Cajon, CA | 2.1 GWh |
#4551 | Jack's Solar Garden | Longmont, CO | 2.1 GWh |
#4553 | Novel Martens Solar LLC(CSG) | Lafayette, MN | 2.1 GWh |
#4554 | Novel Denzer Solar LLC CSG | Minnesota City, MN | 2.1 GWh |
#4555 | Building G | Santa Fe Springs, CA | 2.1 GWh |
#4556 | Novel Schmoll Farms Solar CSG | Dodge Center, MN | 2.1 GWh |
#4557 | Novel Schroeder Solar LLC CSG | Renville, MN | 2.1 GWh |
#4558 | Tweite Community Solar LLC | Byron, MN | 2.1 GWh |
#4559 | Portage Solar | Valparaiso, IN | 2.1 GWh |
#4560 | USS Monarch Solar LLC CSG | Brooten, MN | 2.1 GWh |
#4561 | T Luhman CSG | Zumbrota, MN | 2.1 GWh |
#4562 | Forrest City- Prison Site | Forrest City, AR | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fresno Hoover High School Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Borden Solar Farm | Madera, CA | 117.8 GWh | 13.5 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh | 11.1 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 7.3 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 4.9 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 5.3 mi |
CSU Fresno Solar Project | Fresno, CA | 1.1 GWh | 1.7 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.2 GWh | 2.2 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 6.5 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 13 mi |
La Joya Del Sol | Fresno, CA | 89.3 MWh | 9.7 mi |
Malaga Power LLC | Fresno, CA | 10.5 GWh | 9 mi |
National Raisin | Fowler, CA | 4.8 GWh | 14.4 mi |
OK Produce Fresno Carport | Fresno, CA | 3.1 GWh | 6.5 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.4 GWh | 13 mi |
POM Plant 1 | Del Rey, CA | 2.1 GWh | 15.1 mi |
POM Plant 2 | Del Rey, CA | 292.0 MWh | 14.9 mi |
Rio Bravo Fresno | Fresno, CA | 145.1 GWh | 9.3 mi |
Saint Agnes Medical Center | Fresno, CA | 26.1 GWh | 1.2 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 5.1 mi |
SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 3.9 mi |