Fresno Bullard High School Hybrid
5445 N Palm Avenue, Fresno, CA 93704Plant Summary Information
Fresno Bullard High School Hybrid is ranked #587 out of 747 solar farms in California in terms of total annual net electricity generation.
Fresno Bullard High School Hybrid generated 590.8 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Fresno Bullard High School Hybrid |
---|---|
Utility Name | Forefront Power, LLC |
Location | Fresno County, CA |
Initial Operation Date | March 2020 |
Last Update | Dec 2022 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.4 k MMBtu |
Ranked #9,230 out of 11,249 Power Plants Nationwide | |
Ranked #4,046 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,289 out of 1,501 California Power Plants | |
Ranked #587 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Fresno Bullard High School Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Bullard High School Hybrid.
Monthly Net Generation for Fresno Bullard High School Hybrid
Fresno Bullard High School Hybrid Details
Summary Information | |
---|---|
Plant Name | Fresno Bullard High School Hybrid (63420) |
Plant Address | 5445 N Palm Avenue Fresno, CA 93704 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.81865, -119.81041 |
Generation Dates on File | Mar 2020 to Dec 2022 |
Initial Operation Date | March 2020 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-385-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | Yes |
Generator 903 Details Operating March 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
East West Fixed Tilt | No |
Azimuth Angle | 180 |
Tilt Angle | 7 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.4 MW |
Virtual Net Metering Agreement | No |
Generator BA903 Details Operating March 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.4 |
---|---|
Maximum Charge Rate | 0.4 MW |
Maximum Discharge Rate | 0.4 MW |
Storage Technology | LIB |
Storage Enclosure Type | CS |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | Yes |
Fresno Bullard High School Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4036 | Camellia Solar, LLC | Glenwood, MN | 2.3 GWh |
#4037 | Howell CSG | Middletown, NY | 2.3 GWh |
#4038 | Kenmare - Mansfield Branch Street | Mansfield, MA | 2.3 GWh |
#4039 | Ashley-Chicot Solar | Hamburg, AR | 2.3 GWh |
#4040 | Brooten CSG1, LLC | Brooten, MN | 2.3 GWh |
#4041 | Bloomfield Municipal Utilities Solar | Bloomfield, IA | 2.3 GWh |
#4042 | PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.3 GWh |
#4043 | FELPS 4 - Floresville South | Floresville, TX | 2.3 GWh |
#4044 | Solar Mule, LLC | Oakland, ME | 2.3 GWh |
#4045 | Forever 21 Retail, Inc. | Los Angeles, CA | 2.3 GWh |
#4047 | Farmers Electric Cooperative | Newport, AR | 2.3 GWh |
#4048 | Sand Lake DPC Solar | Centuria, WI | 2.3 GWh |
#4049 | Craighead Electric Solar One | Brookland, AR | 2.3 GWh |
#4050 | FELPS 5- Floresville South | Floresville, TX | 2.3 GWh |
#4051 | FELPS 3 - Floresville South | Floresville, TX | 2.3 GWh |
#4052 | Iron Horse Battery Storage Hybrid | Tucson, AZ | 1.7 GWh |
#4053 | 456 Lower | Minisink, NY | 2.3 GWh |
#4054 | 100 Brook Hill Drive Solar | West Nyack, NY | 2.3 GWh |
#4055 | Mt. Hope DPC Solar | Mt. Hope, WI | 2.3 GWh |
#4056 | Stewart CSG1, LLC | Stewart, MN | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fresno Bullard High School Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Borden Solar Farm | Madera, CA | 130.8 GWh | 11.8 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 6.3 GWh | 11.8 mi |
Clovis East High School | Clovis, CA | 1.6 GWh | 9.5 mi |
Clovis High School | Clovis, CA | 1.5 GWh | 7.1 mi |
Clovis North High School | Fresno, CA | 1.6 GWh | 6.4 mi |
CSU Fresno Solar Project | Fresno, CA | 635.0 MWh | 3.9 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.2 GWh | 2.2 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.6 GWh | 7.8 mi |
Friant Hydro Facility | Friant, CA | 75.7 GWh | 13.7 mi |
La Joya Del Sol | Fresno, CA | 127.1 MWh | 9.7 mi |
Madera Community Hospital | Madera, CA | 1.9 GWh | 15.6 mi |
Malaga Power LLC | Fresno, CA | 10.0 GWh | 9.7 mi |
National Raisin | Fowler, CA | 5.1 GWh | 15.4 mi |
OK Produce Fresno Carport | Fresno, CA | 1.6 GWh | 6.9 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.8 GWh | 11.2 mi |
Rio Bravo Fresno | Fresno, CA | 149.8 GWh | 10.2 mi |
Saint Agnes Medical Center | Fresno, CA | 32.0 GWh | 2.7 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.2 GWh | 6.3 mi |
SCCCD - Fresno Community College | Fresno, CA | 4.0 GWh | 3.7 mi |
Sealed Air Madera Solar Project | Madera, CA | 2.0 MWh | 16.2 mi |