Fresno Bullard High School Hybrid
5445 N Palm Avenue, Fresno, CA 93704Plant Summary Information
Fresno Bullard High School Hybrid is ranked #618 out of 799 solar farms in California in terms of total annual net electricity generation.
Fresno Bullard High School Hybrid generated 356.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Fresno Bullard High School Hybrid |
---|---|
Utility Name | Forefront Power, LLC |
Location | Fresno County, CA |
Initial Operation Date | March 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.2 GWh |
Annual Consumption | 7.7 k MMBtu |
Ranked #9,733 out of 11,852 Power Plants Nationwide | |
Ranked #4,463 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,348 out of 1,570 California Power Plants | |
Ranked #618 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Fresno Bullard High School Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Bullard High School Hybrid.
Monthly Net Generation for Fresno Bullard High School Hybrid
Fresno Bullard High School Hybrid Details
Summary Information | |
---|---|
Plant Name | Fresno Bullard High School Hybrid (63420) |
Plant Address | 5445 N Palm Avenue, Fresno, CA 93704 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.81865, -119.81041 |
Generation Dates on File | Mar 2020 to Dec 2023 |
Initial Operation Date | March 2020 |
Annual Generation | 2.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-385-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | Yes |
Generator 903 Details Operating March 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
East West Fixed Tilt | No |
Azimuth Angle | 180 |
Tilt Angle | 7 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.4 MW |
Virtual Net Metering Agreement | No |
Generator BA903 Details Operating March 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.4 |
---|---|
Maximum Charge Rate | 0.4 MW |
Maximum Discharge Rate | 0.4 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.2 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 63420 |
Direct Support Gen Id | 903 |
Support T D Asset | No |
Fresno Bullard High School Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4453 | USS Water City Solar LLC CSG | Waterville, MN | 2.2 GWh |
#4454 | Pipestone City Solar LLC CSG | Pipestone, MN | 2.2 GWh |
#4455 | Merrimac Solar | Merrimac, MA | 2.2 GWh |
#4456 | Hyacinth Solar, LLC | Northfield, MN | 2.2 GWh |
#4457 | Greenwood Solar Farm | Avoca, MI | 2.2 GWh |
#4458 | West Boylston Community Shared Solar | West Boylston, MA | 2.2 GWh |
#4459 | Marigold Community Solar Garden, LLC | Waterville, MN | 2.2 GWh |
#4460 | USS King 2 CSG | Waconia, MN | 2.2 GWh |
#4461 | Novel Stavem Solar LLC CSG | Glenwood, MN | 2.2 GWh |
#4462 | ER Bison Solar CSG | Lewisburg, PA | 2.2 GWh |
#4464 | Novel Sunnyfield Farms Solar LLC CSG | Mazeppa, MN | 2.2 GWh |
#4465 | FELPS 3 - Floresville South | Floresville, TX | 2.2 GWh |
#4466 | FELPS 4 - Floresville South | Floresville, TX | 2.2 GWh |
#4467 | FELPS 5- Floresville South | Floresville, TX | 2.2 GWh |
#4468 | Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.2 GWh |
#4469 | Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.2 GWh |
#4470 | Homer Street West | Olean, NY | 2.2 GWh |
#4471 | Barre II Solar Project | Barre, MA | 2.2 GWh |
#4472 | Dubois Solar (Hybrid) | Pine Bush, NY | 2.1 GWh |
#4473 | AC Power | Delanco Township, NJ | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fresno Bullard High School Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Borden Solar Farm | Madera, CA | 117.4 GWh | 11.8 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh | 11.8 mi |
CA - Madera USD - Madera South HS | Madera, CA | 462.0 MWh | 16.1 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 9.5 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 7.1 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 6.4 mi |
CSU Fresno Solar Project | Fresno, CA | 1.1 GWh | 3.9 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.1 GWh | 2.2 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 7.8 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 13.7 mi |
La Joya Del Sol | Fresno, CA | 89.3 MWh | 9.7 mi |
Madera Community Hospital | Madera, CA | 1.8 GWh | 15.6 mi |
Malaga Power LLC | Fresno, CA | 10.8 GWh | 9.7 mi |
National Raisin | Fowler, CA | 4.8 GWh | 15.4 mi |
OK Produce Fresno Carport | Fresno, CA | 3.1 GWh | 6.9 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.4 GWh | 11.2 mi |
Rio Bravo Fresno | Fresno, CA | 145.1 GWh | 10.2 mi |
Saint Agnes Medical Center | Fresno, CA | 25.5 GWh | 2.7 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 6.3 mi |
SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 3.7 mi |