FreeState Stull Solar I
1720 E 400 Rd, LeCompton, KS 66050Plant Summary Information
FreeState Stull Solar I is ranked #14 out of 14 solar farms in Kansas in terms of total annual net electricity generation.
FreeState Stull Solar I generated 215.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | FreeState Stull Solar I |
---|---|
Utility Name | Evergy Kansas Central, Inc |
Location | Douglas County, KS |
Initial Operation Date | December 2023 |
Last Update | Dec 2023 |
Annual Generation | 215.0 MWh |
Annual Consumption | 734 MMBtu |
Ranked #11,274 out of 11,835 Power Plants Nationwide | |
Ranked #5,575 out of 5,643 Solar Power Plants Nationwide | |
Ranked #112 out of 152 Kansas Power Plants | |
Ranked #14 out of 14 Kansas Solar Power Plants | |
Fuel Types | Solar |
Map of FreeState Stull Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for FreeState Stull Solar I.
Monthly Net Generation for FreeState Stull Solar I
FreeState Stull Solar I Details
Summary Information | |
---|---|
Plant Name | FreeState Stull Solar I (66884) |
Plant Address | 1720 E 400 Rd, LeCompton, KS 66050 |
Utility | Evergy Kansas Central, Inc (22500) |
Latitude, Longitude | 38.99008, -95.42761 |
Generation Dates on File | Nov 2023 to Dec 2023 |
Initial Operation Date | December 2023 |
Annual Generation | 215.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | FreeState Electric Coop (10019) KS |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator FSS1 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
FreeState Stull Solar I Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5565 | Tift Fletcher | Tifton, GA | 245.0 MWh |
#5566 | Royal Solar Partners (CSG) | Oswegatchie, NY | 244.0 MWh |
#5567 | WMATA - Anacostia CSG | Washington, DC | 242.0 MWh |
#5568 | South River H4 Solar Energy Storage | Autryville, NC | 224.0 MWh |
#5569 | MSC-Empire01, LLC | Farmington, MN | 235.8 MWh |
#5570 | Caterpillar Hill | Sedgwick, ME | 235.0 MWh |
#5571 | Lemoore 1 | Lemoore, CA | 232.0 MWh |
#5572 | Pepin Garden | Kellogg, MN | 222.0 MWh |
#5573 | Kankakee 2 | Bourbonnais, IL | 221.0 MWh |
#5574 | Cenergy - Richards (CSG) | Fairfield, ME | 220.0 MWh |
#5576 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 266.0 MWh |
#5577 | IKEA St. Louis 410 | St. Louis, MO | 211.0 MWh |
#5578 | IMPA Knightstown Solar Park | Knightstown, IN | 207.0 MWh |
#5579 | IKEA Conshohocken Rooftop PV System | Conshohocken, PA | 203.0 MWh |
#5580 | Arctaris Saddleback Solar | Dallas Plantation, ME | 201.0 MWh |
#5581 | Byrne Solar, LLC | Lowell, MI | 198.0 MWh |
#5582 | Mayhill Solar LLC Community Solar | Saddle Brook, NJ | 197.0 MWh |
#5583 | Crane Garden | Lester Prairie, MN | 193.0 MWh |
#5584 | ENO Paterson Solar | New Orleans, LA | 184.0 MWh |
#5585 | Dorchester Solar Site | Dorchester, MA | 181.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding FreeState Stull Solar I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baldwin City Plant No 1 | Baldwin City, KS | 19.0 MWh | 19.7 mi |
Baldwin City Plant No 2 | Baldwin City, KS | 145.0 MWh | 20.1 mi |
BPU Solar Farm | Kansas City, KS | 1.8 GWh | 41 mi |
Burlingame | Burlingame, KS | 46.1 MWh | 27.4 mi |
FreeState Crooked Post Solar I | Topeka, KS | 3.4 GWh | 20.8 mi |
FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh | 20.9 mi |
Gardner Energy Center | Gardner, KS | 40.0 MWh | 30.9 mi |
Holton | City of Holton, KS | 1.0 GWh | 37.2 mi |
Iatan | Weston, MO | 3.5 TWh | 39.6 mi |
Jeffrey Energy Center | St. Mary's, KS | 5.4 TWh | 42.3 mi |
Kansas River Project | Lawrence, KS | 19.0 GWh | 10.4 mi |
Lawrence Energy Center | Lawrence, KS | 1.6 TWh | 8.6 mi |
Nearman Creek | Kansas, KS | 646.5 GWh | 41 mi |
Osawatomie | Miami, KS | 44.0 GWh | 42.4 mi |
Osawatomie City of | Osawatomie, KS | 10.0 MWh | 42.1 mi |
Osawatomie Power Plant North Sub | Osawatomie, KS | 5.0 MWh | 42.2 mi |
Osawatomie Power Plant South Sub | Osawatomie, KS | 6.0 MWh | 42.7 mi |
Ottawa | Ottawa, KS | 377.0 MWh | 27.1 mi |
Waste Management Rolling Meadows LFGTE | Topeka, KS | 45.4 GWh | 20.7 mi |
West Gardner | Johnson, KS | 262.6 GWh | 27.6 mi |